• Title/Summary/Keyword: Disaster Prevention Project

Search Result 94, Processing Time 0.022 seconds

A Study on Selection of Media to Communicate Information for Raising Awareness of Soil Erosion Control Projects (사방사업 인지도 확산을 위한 정보전달 매체 선정 연구)

  • Ryu, Yoon-Jin;Cho, Dong-Gil;Youn, Ho-Jung;Lee, Chang-Woo;Lee, Ji-Hyun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.2
    • /
    • pp.1-11
    • /
    • 2018
  • As a result of climate change, mountain sediment disasters due to localized heavy rain and mountain development are occuring more frequently, thus, increasing social attention to and demand for soil erosion control projects. However, since 2011 Seoul Wumyeon Mountain landslide, the public is expressing increasing anxiety as well as negative perception regarding defective project results. Therefore, this study investigated promotional terms and information media related to soil erosion control projects according to the consumer in order to increase awareness of soil erosion control projects. In this study, the information consumers were divided into experts and the general public and conducted a survey related to promotional terms and media for communicating relevant information. In the result, the experts chose landslide prevention and recovery projects (41.8%) as an appropriate promotional term for soil erosion control projects. The general public, however, chose mountain sediment disaster prevention projects (32.5%) as the appropriate promotional term. However, the analysis showed that it would be necessary to develop an promotional term that can encompass the concept of 'disaster prevention' including forest and soil disaster as the word 'landslide' can suggest soil erosion control is limited to landslides only. In the survey regarding the media for communicating information related to soil erosion control projects according to the consumer type, the experts preferred radio and TV as media to communicate the relevant information, while, among the general public, the youths preferred social media such as Facebook and Twitter (22.22%) and adults radio and TV (34.07%), As for the most effective way to promote soil erosion control projects, the experts chose traditional promotinal media such as newspaper, radio, and TV (0.172) whereas the adults and youths preferred the internet and Facebook (0.089). It appears that using the preferred media for communicating information related to soil erosion control projects according to the consumer type will be effective way to promote soil erosion control projects.

Disaster Reduction Plan through Forklift Accident Case Analysis (지게차 재해사례 분석을 통한 재해감소방안)

  • Young Min Park
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.173-183
    • /
    • 2023
  • Purpose: In order to reduce industrial accidents caused by forklift trucks, it is actually necessary to analyze the causes of accidents. This study aims to present disaster prevention measures by analyzing accident cases by forklift accident type. Method: For the analysis of industrial accidents, including serious industrial accidents caused by forklifts from 2021 to 2022, accident statistics from the Korea Occupational Safety and Health Agency were used to analyze accidents in four types. Result: In the last two years, the total number of victims, including deaths and other serious injuries, was 2,559, which was 1,396 in 2021 and 1,163 in 2022. Disaster prevention measures were presented for industrial accidents by size and occurrence type of equipment that cause serious industrial accidents in which more than 1,000 people are injured annually. Conclusion: It is necessary to expand the number of workers subject to the forklift financial support project to less than 100. It is necessary to amend the proviso on boarding restrictions in Article 86, Paragraph 7 of the 「Regulations on Industrial Safety and Health Standards」. It is mandatory to install front and rear cameras. It is necessary to install driving-linked safety belts. It is necessary to install line beams obligatory. It is necessary to expand the subject of forklift special safety and health education to workplaces that have more than one forklift truck, and it is necessary to redesignate the training hours to 16 hours every year.

A Study on the Evaluation Model of Disaster Risks for Earthquake : Centering on the Cases of Cheongju City (지진에 대한 재해위험도 평가 모형에 관한 연구 - 청주시 사례 중심으로 -)

  • Jeong, Eui-Dam;Shin, Chang-Ho;Hwang, Hee-Yun
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.5
    • /
    • pp.67-73
    • /
    • 2010
  • Relatively high density of population and buildings exists in urban area mainly because of broad job opportunities and conveniences available. In other words, if happened, there might be high possibility of disaster which can not be easily recovered. The purpose of this study is to show evaluation approach of the risk degree resulted from the disaster, which considers the attributes of urban area. Cheongju-city in Chungcheongbuk-do is selected as sample district to be estimated. The degree of overall risk including fire risk, building collapse risk, evacuation risk and gas explosion risk etc. is analyzed in the designated area. The analysis suggests the highest risk degree in Bukmun-ro district which also shows CBD decline phenomenon. Therefore, it can be not only predicted that this area as old downtown has not been provided with disaster prevention operation and urban renewal project, but also judged that administrative assistances for the disaster are required possibly soon.

The Appropriateness of Probabilistic Rainfall of Disaster Impact Assessment System in Jeju Island (재해영향평가 적용 확률강우량의 적정성에 관한 연구 (제주도를 중심으로))

  • Hong-Jun Jo;Seung-Hyun Kim;Kwon-Moon Ko;Dong-Wook Lee
    • Ecology and Resilient Infrastructure
    • /
    • v.11 no.2
    • /
    • pp.55-64
    • /
    • 2024
  • The disaster impact assessment system was introduced in 2005 as a disaster prevention procedure for comprehensive and systematic developmental projects. However, according to the 'Practical Guidelines for Disaster Impact Assessment', Jeju Island's unique hydrogeological features necessitate the calculation of isohyetal-based probabilistic rainfall, which can reflect altitude, when estimating probabilistic rainfall for flood volume determination, rather than using conventional methods. Despite Jeju Island being centered around Hallasan, there are three Automatic Weather Stations (AWS) located at the summit of Hallasan, making weather stations denser than in other cities and provinces. Therefore, it is judged that there would be no difficulty in applying conventional methods, such as utilizing the probabilistic rainfall data from the weather stations or employing the Thiessen method, to estimate flood volumes for small-scale project areas. Accordingly, this study conducts a comparative analysis of the impact of applying general probabilistic rainfall from weather stations and isohyetal-based probabilistic rainfall in site in the context of Jeju Island's disaster impact assessment system.

Application and Analysis of the Steady State Spectral Wave Model for Coastal Waters at Busan New Port Site (부산신항만수역에서 정상상태 스펙트럼 파랑모델의 적용 및 분석)

  • 이학승;이우철;황호동;양상용;이중우
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2003.05a
    • /
    • pp.157-164
    • /
    • 2003
  • Introduction of wave model, considered the effect of tide, wind and wave induced currents at the coastal waters of complex bathymetry, is a very important factor for most coastal engineering design and disaster protection problems. As the steady state spectral wave model could simulate depth induced wave shoaling and refraction, current induced refraction effect, steepness induced wave breaking, diffraction, wind wave growth, and wave-wave interaction that redistribute energy, this would support and compensate the gap in the real field of design where other wave models could not deal and cause wrong estimation. In this study, for that sense, we applied the spectral wave model t the large coastal waters near Gaduck Island where the Busan new port construction project is going on, for better understanding and analysis of wave transformation process. We also compared the simulation results with the calculated from the existing model. From such a trial of this study, we hope that broader and sager use of the spectral model in the area of port design and disaster prevention system come through in near future.

  • PDF

Measurement of Disaster Damage Reduction Effect of the Farm-customized Early Warning Service for Weather Risk Management in Korea (농장맞춤형 기상재해 조기경보서비스의 재해피해 경감효과 측정)

  • Sangtaek Seo;Yun Hee Jeong;Soo Jin Kim;Kyo-Moon Shim
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.25 no.3
    • /
    • pp.197-207
    • /
    • 2023
  • This study was conducted with the purpose of measuring the disaster damage reduction effect according to the provision of the early warning service ahead of the nationwide expansion. The damage reduction effect was measured using insurance data for 19 insured crops in areas that early warning services were provided during the period from 2017 to 2020. As a result of the measurement, it was analyzed that the early warning service had the effect of preventing or reducing disaster damage to farms. In particular, it was found that the disaster reduction effect was greater when disaster prevention facilities were equipped. The implications obtained from the results are as follows. First, by presenting subjectively experienced disaster reduction cases as numerical effects using insurance data with public confidence and objectivity, it can be used as basic data such as expansion of service area, discount of insurance premium with service adoption, and promotional materials for service subscription for early warning service. Second, in expanding and distributing early warning services, giving priority to areas or crops equipped with disaster prevention facilities can help increase the efficiency and effectiveness of the project.

Assessment of Flood Impact on Downstream of Reservoir Group at Hwangryong River Watershed (황룡강 유역 저수지군 하류하천 영향평가)

  • Hwang, Soon-Ho;Kang, Moon-Seong;Kim, Ji-Hye;Song, Jung-Hun;Jun, Sang-Min;Lee, Sang-Hyun;Choi, Jin-Yong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.3
    • /
    • pp.103-111
    • /
    • 2012
  • Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93 dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics, and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53% for 100yr and 200yr frequencies, respectively.

The Value Assessment for Indirect Benefits of Road Project Using Contingent Valuation Method (조건부가치측정법을 이용한 도로사업의 간접편익 추정)

  • Kim, Kyong Ju;Kang, Ki Yong;Kim, Kyoungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.61-70
    • /
    • 2010
  • In case of low benefit project with low traffic or high-priced project, existing analysis of cost and benefit tends to present a low feasibility. However, considering the improvement of environment, intensification of disaster prevention, public stability of countryside area and formation of good scenery, these projects can have a feasibility. This paper analyzes and summarizes the indirect benefit of some ripple effects, caused by road projects, and presents the methodology and process in order to change the indirect benefit into monetary value.

Analysis on Construction Clients' Role for Safety and Health Management in Plan, Design, and Construction Stage (건설공사 발주자의 계획, 설계, 공사단계 안전보건관리 역할 분석)

  • Lim, Se Jong;Jeong, Seong-choon;Na, Ye Ji;Won, Jeong-Hun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.24-31
    • /
    • 2020
  • The duty of construction clients in WSH (Workplace Safety and Health) system was included in the amendment of Occupational Safety and Health Act (enforced on 16 January 2020), which was estimated the shift of paradigm in the prevention of construction accidents. The purpose of this paper is to introduce the analysis results of construction clients' role in the construction project, which were performed by authors over the recent years in order to impose the duty on construction clients, and to suggest their role according the plan, design, and construction stage. Utilizing the systematic literature review process based on Meta analysis, the related papers were selected. For the selected papers, related domestic and foreign regulations, and other prominent report, the construction clients' role was analyzed by reflecting the experts' advice. Results show that the construction clients should control the designer and contractor for implementing the WHS system during the whole process of the construction project. They should supply sufficient source and time to ensure the workers' safety. In the plan stage, the key role of construction clients is to identify intensively controlled hazard and risk reduction plan and to transfer the results. In the design stage, their key role is to select the designer with the capacity in WSH and to assist the designer for the safety design. The main key role of construction clients in the costruction stage is to select the contractor with specialty in WSH including a contract reflecting the WSH requirement and to check implementation of WSH plan, WSH cost, WSH education, and accident report. In addition, it is thought that the construction clients' participations in the site WSH activity and adjustment of safety and health problem among contractors can be effect in the prevention of construction accidents.

System Dynamics Modeling for Policy Analysis of Occupational Injuries

  • Lee, Kyung-Soo;Nam, Seok-Woo;Chung, Hee-Tae
    • Journal of Korean Clinical Health Science
    • /
    • v.2 no.2
    • /
    • pp.126-132
    • /
    • 2014
  • Purpose. Because traditional statistics approach had limitations in learning future forecasting and major factors causing occupational injuries in each industry, this paper develops a model forecasting and evaluating occupational injury rate by using a system dynamics model through the analysis of the industry injury statistics and the project for industry injury prevention. Method. The model of this paper consists of 12 total models such as a model of employees, of industrial disaster victims, of injury rate, etc.; In the analysis of firm size, it is classified and developed according to 12 groups on the basis of the number of employees, and in the analysis of industrial classification, it is done according to 10 total business fields such as manufacturing business, construction one, etc. Results. This paper suggests the methodology which forecasts industry injury rate by business field and size on the basis of developed model, and evaluates an industry injury prevention project from various angles. Conclusions. This paper deduced problem through the analysis of an industry injury by business fields and a comparative analysis of foreign cases, and analyzed to affect industry injury prevention by industry. And it also analyzed actual condition of industry injury, and did a difference in the level of safety consciousness according to the general characteristics of workers and occupational safety and health education related characteristics. In result, this paper suggests that analyzing occupational injury related factors, a safety budgetary allocation, and industry injury related factors can reduce illness costs such as employees' injury and medical care, and also assist cost for a disability.