• Title/Summary/Keyword: Direct Construction

Search Result 1,119, Processing Time 0.025 seconds

A Study on the Estimation of Adhesive Stability of the Improved Direct Setting Method using Tile Bond for Application of Porcelain Tile under 1 percent absorptance (흡수율이 1% 이하인 자기질 타일의 타일접착제를 사용한 벽체 개량 떠붙임 공법의 부착안정성 평가 연구)

  • Jung, Yang-Hee;Jung, Eun-Hye;Seo, Sin-Seok;Kim, Ook-Jong;Lee, Do-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.13-16
    • /
    • 2008
  • This paper is to present the performance data for improved direct setting method using tile bond for application of porcelain tile under 1 percent absorptance. For this purpose, improved direct setting method type 1 & 2(tile bond curing time 0, 24H) were compared with the conventional setting methods(including direct setting method and improved pressure setting method) in the sight of the adhesive stability of porcelain tile. It tested for tiles after 14, 28days under standard condition and severe conditions. The severe conditions were water immersion, heat ageing(70℃) and freeze-thaw cycle. On the basis of test results, the adhesive strength of direct setting method was lowest for the conventional setting methods. But improved direct setting method using tile bonds(A, B) came close to the result of improved pressure setting method using tile bonds.

  • PDF

Analysis of Standard Cost and the Construction Period Applied TBM Excavation Method (TBM 굴착 공법 적용 구경별 표준 공사비 및 공사기간 분석 연구)

  • Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.319-327
    • /
    • 2012
  • This research collected work drilling report of TBM method site developed by WRITH company to TBM equipment company in Germany and analyzed work operating productivity. Based the data analyzed TBM operating productivity, This research derived and presented excavation speed(m/day) by TBM diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m) and rock. Also, based on the excavation speed(m/day) by TBM diameter, This research estimated a day direct construction cost and total direct construction costs by applying a direct construction cost which spent on per 1m. Based on hard rock 40.0%, soft rock 30.0%, usually rock 20%, weathered rock 10.0%, TBM boring velocity, m per cost, total construction period shall estimate the construction cost and the construction period by the effective use by diameter when future applying TBM method to the basic planning stages and in the preliminary design phase.

Study on Direct Tensile Properties and Reliability Review of Steel Fiber Reinforced UHPC (강섬유 보강 UHPC의 직접인장 특성 및 신뢰성 검토에 관한 연구)

  • Park, Ji Woong;Lee, Gun Cheol;Koh, Kyung Taek;Ryu, Gum Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.125-132
    • /
    • 2018
  • In this study, a direct tensile test was planned to identify the tensile performance of UHPC, and the irregularity of cracks, which is a problem of the direct tensile test, was complemented through the introduction of notches at the center of a specimen. In this regard, a number of specimens divided by batch to reduce the deviation of direct tensile test values were fabricated to present reference data with respect to highly reliable direct tensile strength values. In addition, the mechanical properties and reliability of the specimens were examined under the curing conditions of the specified design strength of 120MPa for the steel fiber reinforced concrete with 1.5% fiber volume fraction, which is most suitable for the field application. As a result, the deviation of averages by batch between compressive strength and direct tensile strength did not show a large difference, and all cracks occurred within 20mm in the direct tensile test. At the 95% confidence interval of the direct tensile strength, the range was considerably small in the mean and the standard deviation, and there was no significant difference depending on the curing conditions. The results confirmed that a stable direct tensile test was performed, and highly reliable results were obtained through the fabrication of specimens by batch and test progress.

Application of Direct Analysis Method Considering Initial Imperfection Limitation (초기변형 허용값을 고려한 직접해석법 적용)

  • Kim, Hee Dong
    • Journal of Korean Society of Steel Construction
    • /
    • v.25 no.5
    • /
    • pp.487-495
    • /
    • 2013
  • As the first step to suggest effective ways of using direct analysis method considering current situations of construction fields in Korea, analytical approach is used to verify direct analysis method which adapts initial imperfection limitation of Korean specification of building construction. The main analytical variables are size of frames, axial load ratio, axial load distribution, value of notional loads, location of notional loads, and applied method of notional loads. The results show that the use of initial imperfection limitation of Korean specification, L/700 is suitable, and the recommendable method to use direct analysis method is applied notional loads based on L/700 as minimum lateral load at each story, even if B2 is less than 1.5 and lateral loads exist.

Development of Stress, Load and Displacement Controlled Direct Shear Apparatus for Jointed Rock (응력, 하중, 변위제어 방식의 암석 절리면 전단시험기의 개발)

  • 김대영;천병식;서영호;이영남
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.471-477
    • /
    • 1999
  • A new stress, load and displacement controlled direct shear apparatus has recently been developed at the Hyundai Institute of Construction Technology This direct shear apparatus is capable of testing of rock joint under constant normal stiffness, constant normal stress or constant normal load boundary conditions. This paper describes this direct shear apparatus and illustrates results of shear tests at constant normal stress condition, constant normal load condition and constant normal stiffness condition with dental stones which have a same joint roughness and unconfined compressive strength.

  • PDF

A Study on Contract Management Method with regard to Direct Payment of Subcontract Payment (하도급대금의 직접지급에 따른 계약관리방안에 대한 고찰)

  • Lee Jong-Gwang;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.11-16
    • /
    • 2001
  • The purpose of this study is to examine contract management method with regard to Direct Payment of Subcontract Payment outlined in Article 14 of The Fair Trade Subcontract Transactions Act. The literature research and deductive demonstration are adopted as research method. And the findings of this study are as followed. (1) The study has shown the closer interpretation on the legal condition and the impact of Direct Payment of Subcontract Payment. (2) The study has revealed the solution for the questions concerning Direct Payment of Subcontract Payment by exploring and demonstration. (3) The study has suggested contract management method for contractual parties with respect to Direct Payment of Subcontract Payment.

  • PDF

Analysis Techniques for Accident Causes of Subcontract Work at Construction Site (전문 건설공사 재해원인 분석 기법에 관한 연구)

  • Son, Ki-Sang;Rhee, Kyung-Yong;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.5
    • /
    • pp.34-42
    • /
    • 2009
  • There are many accident causes related to even an accident. As well four(4) stepped causes of one accident at construction sites are analyzed in the study. First, eleven(11) cause factors are set up at each step such as policy level, management, indirect, direct level which are discussed and determined by field experts with 15year experience or more. Therefore, one direct cause occurred in construction site can be connected to the previous cause than in direct and management, and policy problem of previous management. These questionnaires results are analyzed with three different methods such as weighing level by Delphi technique, correlation analysis, critical pass method. Three different methods show their characteristic to see which subcontract work is more dangerous or not. Subcontract or at a construction site can be use the above three different cases as they need at their site in order to make more effective countermeasures.

Customers' Needs Analysis for Investment Decision Making in Residential Facility for Retired Seniors (유료노인주거시설에 대한 투자 의사결정을 위한 수요자 요구 분석)

  • Chin, Mee-Youn;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.53-61
    • /
    • 2008
  • It is expected that the market of residential facility for retired seniors will be a new investment field for construction firms. This study describes the questionnaire survey analysis results of potential customers' demand for the facility. For comparison purpose, direct construction cost was estimated by estimation experts. In addition, a case analysis was conducted to compare direct cost and indirect project cost with the experts' estimation. According to the questionnaire survey analysis, it is observed that there were significant differences in demand between groups which are classified by the regions, living expenditures, the level of property ownership and the scales of residence. From an investor's perspective, investment decision on residential facility for retired seniors should be made considering bothe the level of returns which can be generated from the investment and the customers' needs.

Development of Technical Breakdown Structure Standard in Temporary Works (건설가설공사의 표준기술분류체계 구축)

  • Park, Jun-Mo;Kim, Ok-Kyue;Park, Gil-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.162-163
    • /
    • 2013
  • A temporary work are lifting equipment that tower crane or lift, and temporary architectures that office building and storage in construction site. And it is main construction work that built and used temporarily like to a scaffolding, a walk plate, and a formwork. This study is to adjust breakdown structure of temporary work to introduce technical tendency. With a site manager, it is collected a detailed statement and compared. As a result to break down a tendency that temporary equipment, additional function, and direct work of temporary technique, first, existing detail technical indexes that group I, group J, group K, and group L are classified. Second, due to set up and manage to main agents in case of existing detail technical indexes that B1, B2, it is not wrong to classify. But, it is somewhat different, and therefore adjust it to same level. Finally, as a technical tendency that temporary equipment, additional function, and direct work of temporary technique, it is adjusted the others.

  • PDF

Current Status and Problems of Direct Construction Mandatory System under the Framework Act on Construction Industry (건설산업기본법 상 직접시공의무제도의 현황과 문제점 - 제도 개선방안을 중심으로 -)

  • Ju, Sungjin;Shin, Manjoong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.43-53
    • /
    • 2022
  • In many cases, the construction industry in Korea has a hierarchical structure in which a general contractor in charge of the entire project is subcontracted from the client and entrusts the construction to a specialty contractor in charge of detailed work types. In this structure, the general contractor manages and takes responsibility for the entire construction, but the person directly involved in the construction is an individual specialty contractor, so the quality and safety of the facilities will vary according to their construction and management capabilities. In order to solve quality and safety problems that may arise due to the difference between the person receiving the order for construction and the person who actually constructs it, it is necessary to let the person who receives the order perform the construction directly for projects under a certain amount. The system introduced for this purpose is the direct construction mandatory system. As described above, although this system was introduced to prevent bad construction and risk transfer, it is a system that has various problems due to the characteristics of the domestic construction industry, institutional limitations, and practical problems, so it is necessary to improve it legally and institutionally.