• Title/Summary/Keyword: Digital site map

Search Result 106, Processing Time 0.028 seconds

AR-based 3D Digital Map Visualization Support Technology for Field Application of Smart Construction Technology

  • Song, Jinwoo;Hong, Jungtaek;Kwon, Soonwook
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1255-1255
    • /
    • 2022
  • Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.

  • PDF

Development of Framework for Digital Map Time Series Analysis of Earthwork Sites (토공현장 디지털맵 시계열 변화분석 프레임워크 기술개발)

  • Kim, Yong-Gun;Park, Su-Yeul;Kim, Seok
    • Journal of KIBIM
    • /
    • v.13 no.1
    • /
    • pp.22-32
    • /
    • 2023
  • Due to the increased use of digital maps in the construction industry, there is a growing demand for high-quality digital map analysis. With the large amounts of data found in digital maps at earthwork sites, there is a particular need to enhance the accuracy and speed of digital map analysis. To address this issue, our study aims to develop new technology and verify its performance to address non-ground and range mismatch issues that commonly arise. Additionally, our study presents a new digital map analysis framework for earthwork sites that utilizes three newly developed technologies to improve the performance of digital map analysis. Through this, it achieved about 95% improvement in analysis performance compared to the existing framework. This study is expected to contribute to the improvement of the quality of digital map analysis data of earthworks.

Performance Comparison of Depth Map Based Landing Methods for a Quadrotor in Unknown Environment (미지 환경에서의 깊이지도를 이용한 쿼드로터 착륙방식 성능 비교)

  • Choi, Jong-Hyuck;Park, Jongho;Lim, Jaesung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.50 no.9
    • /
    • pp.639-646
    • /
    • 2022
  • Landing site searching algorithms are developed for a quadrotor using a depth map in unknown environment. Guidance and control system of Unmanned Aerial Vehicle (UAV) consists of a trajectory planner, a position and an attitude controller. Landing site is selected based on the information of the depth map which is acquired by a stereo vision sensor attached on the gimbal system pointing downwards. Flatness information is obtained by the maximum depth difference of a predefined depth map region, and the distance from the UAV is also considered. This study proposes three landing methods and compares their performance using various indices such as UAV travel distance, map accuracy, obstacle response time etc.

Performance Evaluation of Denoising Algorithms for the 3D Construction Digital Map (건설현장 적용을 위한 디지털맵 노이즈 제거 알고리즘 성능평가)

  • Park, Su-Yeul;Kim, Seok
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.32-39
    • /
    • 2020
  • In recent years, the construction industry is getting bigger and more complex, so it is becoming difficult to acquire point cloud data for construction equipments and workers. Point cloud data is measured using a drone and MMS(Mobile Mapping System), and the collected point cloud data is used to create a 3D digital map. In particular, the construction site is located at outdoors and there are many irregular terrains, making it difficult to collect point cloud data. For these reasons, adopting a noise reduction algorithm suitable for the characteristics of the construction industry can affect the improvement of the analysis accuracy of digital maps. This is related to various environments and variables of the construction site. Therefore, this study reviewed and analyzed the existing research and techniques on the noise reduction algorithm. And based on the results of literature review, performance evaluation of major noise reduction algorithms was conducted for digital maps of construction sites. As a result of the performance evaluation in this study, the voxel grid algorithm showed relatively less execution time than the statistical outlier removal algorithm. In addition, analysis results in slope, space, and earth walls of the construction site digital map showed that the voxel grid algorithm was relatively superior to the statistical outlier removal algorithm and that the noise removal performance of voxel grid algorithm was superior and the object preservation ability was also superior. In the future, based on the results reviewed through the performance evaluation of the noise reduction algorithm of this study, we will develop a noise reduction algorithm for 3D point cloud data that reflects the characteristics of the construction site.

Analysis of Suitable Site for Farmastead using GIS (지형공간정보체계를 적용한 농장의 적지분석에 관한 연구)

  • Rhee, Shin-Ho;Oh, Moo-Young;Choi, Jin-Young;Kim, Han-Joong
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.3 no.2 s.6
    • /
    • pp.173-181
    • /
    • 1995
  • Geospatial analysis method was applied for classification of suitable site for farmstead. Typical urban suburb and rural area was selected and analyzed, that is Cheongwon County in Chungbuk Province, South Korea. In this study, suitable site for the farmstead was classified by five grade in the other site except suitable area for paddy field, upland, settlement and Green Belt, regulated area for development around the city. Digital Elevation Model(DEM), detailed soil map, administration boundary map, stream map and Green Belt map where digitized and scoring tables were composed with scoring standard. In site verification, Geospatial Information System(GSIS) was quite good tools for suitable site classifying for farmstead causing farm household income increasing, environmental impact decreasing and scientific site selection.

  • PDF

Mapping Species-Specific Optimal Plantation Sites Based on Environmental Variables in Namwon City, Korea (환경요인을 이용한 남원시의 적지적수도 제작)

  • Moon, Ga Hyun;Kim, Yong Suk;Lim, Joo Hoon;Shin, Man Yong
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.17 no.2
    • /
    • pp.126-135
    • /
    • 2015
  • This study was conducted to develop a large scale map of species-specific plantation sites based on selected environmental variables such as topography, soil, and climatic factors in Namwon city. Site index equations by tree species were first regressed to 27 environmental variables that could influence the productivity of forest sites using digital forest site maps, digital climate maps, and the 5th National Forest Inventory data. Site index equations by tree species were all evaluated to estimate site productivity using 4-5 environmental variables, and the models' reliability was confirmed based on evaluation statistics. The determination coefficients of site index equations by species ranged from 0.42 to 0.76. With the site index equations, the site conditions appropriate for productive sites by species were considered to assess spatial distribution of productive areas for each species. The final map for optimal plantation in Namwon city was produced based on both site index equations and site conditions appropriate for productive sites by each species using GIS technique. Field survey was conducted to evaluate the suitability of selected species on the map of species-specific plantation sites. Results showed that the plantation map provides relatively reasonable spatial distribution of productive areas for selected species. It was revealed, however, that the sites evaluated as 'not suitable' for any tree species should be revised and complemented with additional information, especially with the site conditions appropriate for productive sites by species of interest. The outcomes of this study are expected to provide information for making customized species-specific plantation maps.

Estimation of Site Index by Species in Gyungi and Chungcheong Provinces Using a Digital Forest Site Map (경기ㆍ충청지역의 수치 산림입지도를 이용한 주요 수종의 산림생산력 추정에 관한 연구)

  • 구교상;김인호;정진현;원형규;신만용
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.5 no.4
    • /
    • pp.247-254
    • /
    • 2003
  • This study was conducted to develop site index equations by main species grown in Gyunggi and Chungcheong provinces using environmental factors obtained from a digital forest site map. For this, 28 environmental factors were regressed on site index by species. Four to five environmental factors by species were selected as independent variables in the best site index equations (coefficients of determination greater than 0.91). For these site index equations, three evaluation statistics, mean difference, standard deviation of difference, and standard error of difference, were applied to the data set. Site index equations by species relationships developed in this study effectively estimate forest productivity in the study area. However, the site index equation of Larix leptolepis showed a larger than expected bias between the estimated and the measured site index. The reason is not clear in this situation, but might be because of the small sample set. It will be necessary, therefore, to conduct more studies to determine the exact reason. It is also expected that the site index equations with a few environmental factors as independent variables could provide valuable information about species well suited to given site conditions. Site index equations for other species should be developed to establish a rational policy about the selection of best species for site conditions.

Providing New Information According to Digital Map Update (수치지도 갱신에 따른 변화정보 제공 방안)

  • Yoo, Eun-Jin;Kim, Jung-Hyun;Lee, Dong-Cheon;Lee, Young-Wook
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2009.04a
    • /
    • pp.101-106
    • /
    • 2009
  • Map update is essential for maintaining reliability of maps. Update could be performed using variety of data sources such as aerial photos, engineering plans, LiDAR data and in-site surveying data. Therefore, map update is essential for maintaining reliability of maps. Update could be performed using variety of data sources such ad aerial photos, engineering plans, LiDAR data and in-site surveying data. Map update requires cost, manpower and time. It is important to inform updated information to users in order to decide purchase the updated maps or not. This paper proposes the way to provide various updated information of maps. Therefore, map users efficiently utilize information from maps.

  • PDF

Study about the Applicable Plan of GIS on Range of Magnetic Field Emitted from 60 Hz Powerline (60Hz 고압 송전선로의 자기장 발생범위에 대한 GIS 적용 방안에 대한 연구)

  • Hong, Seung Cheol;Choi, Seong Ho;Kim, Yoon Shin;Park, Jae Young
    • Journal of Environmental Impact Assessment
    • /
    • v.15 no.4
    • /
    • pp.271-277
    • /
    • 2006
  • In this study, we investigated the applicable plan of GIS on the environmental impact assessment of 60 Hz Powerline. So we assessed distance data based on calculations by use of 2D and 3D Geographical information systems(GIS) and distance data based on measurements on 1: 5000 maps accord with on site distance measurements to use input data for calculating magnetic field. One hundred eight of the on site measured addresses were selected from residences. The data were achieved by measuring the distance between residence and power line on maps with scales of 1: 5000. The digital map was obtained from National Geographic Information Institute with scales of 1: 5000, and we made 2D and 3D map. Correlation analyses were performed for statistical analyses. For the 3D GIS versus on site comparison of different exposure categories, 70 of 108 measurements were assigned to the correct category. Similarly for 2D GIS versus on site comparison, 71 of 108 were correctly categorized. When comparing map measurement with on site measurement, 62 of 108 were correctly categorized. When the correlation analysis was performed, best correlation was found between 3D GIS and on site measurements with r = 0.84947 (p<0.0001). The correlation between map and on site measurement yielded an r of 0.76517 (p<0.0001). Since the GIS measurements and map measurement were made from the center point in the building and the on site measurements had to be made from the closest wall on the building, this might introduce and additional error in urban areas. The difference between 2D and 3D calculations were resulted from the height of buildings.

Estimating Forest Site Productivity and Productive Areas of Quercus acutissima and Quercus mongolica Using Environmental Variables (환경요인에 의한 상수리나무와 신갈나무의 임지생산력 및 적지 추정)

  • Shin, Man-Yong;Sung, Joo-Han;Chun, Jung-Hwa
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.14 no.2
    • /
    • pp.89-97
    • /
    • 2012
  • This study was conducted to estimate forest site productivity and productive areas of Quercus acutissima and Quercus mongolica using environmental factors including climatic variables. Using the data set from digital forest site map and forest climatic map, a total of 42 environmental variables were regressed on site index for developing the best site index equations for Quercus acutissima and Quercus mongolica. Five to six environmental factors by species were selected as independent variables in the best site index equations. For the site index equations, three evaluation statistics (i.e., mean difference, standard deviation of difference, and standard error of difference) were applied to the test data set for the validation of the results, The site index equations fitted well to the test data set with relatively low bias and variation. As a result, it was concluded that the site index equations by species were well capable of estimating site quality. Finally, based on the site index equations, the productive areas by species were estimated by applying GIS technique to the digital forest maps. In addition, the distribution of productive areas by species was illustrated.