• Title/Summary/Keyword: Development project types

Search Result 373, Processing Time 0.031 seconds

The Classification and Regional Development's Direction of Rural Fishing Area Based on Administrative District (행정구역에 기초한 어촌지역의 유형구분과 지역개발방향)

  • Kim, Jung-Tae
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.4
    • /
    • pp.81-93
    • /
    • 2013
  • The selection of land for fishing village development project, and the standard used to classify fishing villages has been determined based on the guidelines developed by fishing village cooperatives. The approach fishing village cooperatives follows is likely to classify fishing villages without first reflecting on the overall development environment of the region, such as other industries and workers in the area. It also acts as a barrier for business promotion or evaluation, because the cooperatives do not match the administrative districts, which are the units of administration, and the main policy enforcement agent in regional development. Against this background, this study aimed to identify categories to situate the development direction, as well as the size and distribution of fishing villages based on eup, myeon, and dong administrative units as defined by the Fishing Villages and Fishery Harbors Act. This study was based on the Census of Agriculture, Forestry, and Fisheries of 2010, and analyzed 826 eups, myeon, and dongs with fishery households using the principal component analysis, and 2-Step cluster analysis methods. Therefore, 95% of the variance was explained using the covariance matrix for types of fishing villages, but it was analyzed as one component focusing on the number and ratio of fishery households, and used the cluster-type analysis, which focused on the sizes of fishing villages. The clusters were categorized into three types: (1) the development type based on the number of fishermen in the eups, myeons and dongs was analyzed as village size (682); (2) administrative district size (121); and (3) total eups, myeons and dongs (23), which revealed that the size of most fishing villages was small. We could explain 73% of the variance using the correlation coefficient matrix, which was divided into three types according to the three principal component scores, namely fishery household power, fishery industry power, and fishing village tourism power. Most fishing villages did not have a clear development direction because all business areas within the region were diversified, and 552 regions could be categorized under the harmonious development type, which is in need of balanced development. The fishery industry type typified by industrial strength included 159 regions in need of an approach based on industrialization of fishery product processing. Specialized production areas, which specialized in producing fishery products, were 115 regions with a high percentage of fishermen. The analysis results indicated that various situations in terms of size and development of fishing villages existed. However, because several regions exist in the form of small village units, it was necessary to approach the project in a manner that directed the diversification of regional development projects, such as places for local residents to relax or enjoy tourism experiences within the region, while considering the overall conditions of the relevant eups, myeons, and dongs. Reinforcement of individual support for fishermen based on the Fisheries Act must take precedence over providing support for fishermen through regional development. In addition, it is necessary to approach the development of fishing villages by focusing on industrializing the processing techniques of fishery products. Areas specialized in the production of fishery products are required to consider the facilities for fisheries production, and must make efforts to increase fishery resources, such as releasing fry.

Dental Radiography for Age Estimation: A Scoping Review

  • Jeon, Kug Jin;Kim, Young Hyun;Lee, Joo-Young;Jung, Hoi In;Han, Sang-Sun
    • Journal of Korean Dental Science
    • /
    • v.15 no.1
    • /
    • pp.31-50
    • /
    • 2022
  • Purpose: This study was to investigate the types of imaging modalities, analytical methods for age estimation, and the age of the subjects in research on age estimation using dental radiography through a scoping review, and to investigate the overall trends in age estimation studies. Materials and Methods: A scoping review was designed according to the Arksey and O'Malley guidelines and the Preferred Reporting Items for Systematic Review and Meta-analysis (PRISMA) statement. Three electronic databases were used as search sources (Medline, Embase, and Cochrane Library). Studies were classified according to the three main components of the research question. "What are the imaging modalities, analytical methods, and target age in dental imaging-based age estimation studies?" Result: The final 198 studies were selected by two reviewers. The most common imaging modality used in studies was panoramic radiography (69.7%), and studies using cone-beam computed tomography have increased over time. Analytical methods for age estimation were 62.6% in studies based on tooth development and 26.3% in studies using pulp/tooth ratio. The subject age was 27.8% for children and 27.3% for adults. Studies conducted in all age groups comprised the smallest category (5.2%). Conclusion: Panoramic radiography has been the most used types of imaging modalities for age estimation, and the most common analytical method was analysis of tooth development. Most studies targeted specific ages, and very few involved all age groups. Dental age estimation studies should be carried out with appropriate consideration of the imaging modality that is analyzed, the methods that are used, and the age that is targeted.

Development of Project Management System for Geothermal Well Construction (지열발전 시추공 구축 프로젝트관리시스템 개발)

  • Kim, Kwang-Yeom;Lee, Seung-Soo
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.38-46
    • /
    • 2012
  • Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.

A Study on the Profitability of Private Finance Initiative Ports Companies and the Use of Old Ports Rehabilitate-Project

  • Yang, HuckJun
    • Journal of Navigation and Port Research
    • /
    • v.44 no.5
    • /
    • pp.430-437
    • /
    • 2020
  • This paper analyzes the profitability of the Private Finance Initiative(PFI) ports and proposes the application plans of the R-project(Rehabilitate project) for old ports to attract and activate private investment in the port industry. The R-project of old ports can reduce the government's financial budget and provide improved facilities for users more quickly than the public sector comparator. Before suggesting the R-project for old ports, the profitability of the currently operating 11 companies of the PFI ports are analyzed using the four ratios of profitability, and the results show that all the companies indicate low profitability, except for the top three companies. To apply the R-project, the three types of R-project ports are categorized as maintaining the function of the port, changing the function of the port, and mixing the function of the port. Additionally, three obstacles and improvement measures are suggested; attracting private business, legal issues, and administrative procedures. This study is conducive to the policy making for the port renewal and the activating PFI for the port industry.

Potential Use of Airborne Synthetic Aperture Radar to Monitor Agricultural Land Uses: A Case Study in Thailand

  • Wanpiyarat, V.;Buapradubkul, D.;Chutirattanaphan, S.
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.44-46
    • /
    • 2003
  • In 1996, Thailand's participation in the Pacific Rim as a part of NASA's Mission to Planet Earth (MTPE) Program, was titled 'AIRSAR Thailand Project'. In this project the Department of Land Development utilized Topographic SAR (TOPSAR) which had multi-frequencies: C band, L band, and P band with multi-polarization: HH, VV, and HV as well as C band VV DEM. Satellite data such as LANDSAT TM was also utilized for optimal use. Results of AIRSAR image processing including data fusion among difference wavelength bands and polarization revealed the quality of AIRSAR that best suit for detection of agricultural land uses. The HH-L band AIRSAR was proven to be useful to distinguish among crop types when combined with appropriate data. The HH, VV, and HV-P band enhanced surface characteristics of swamp forest and wetland. In addition, TOPSAR has its great advantage for identification of salt farms and shrimp ponds.

  • PDF

The Mediating Effects of Bidirectional Knowledge Transfer on System Implementation Success

  • Kim, Jong Uk;Kim, Hyo Sin;Park, Sang Cheol
    • Asia pacific journal of information systems
    • /
    • v.25 no.3
    • /
    • pp.445-472
    • /
    • 2015
  • Although knowledge transfer between two different parties occurs in IS development projects, the majority of prior studies focused on knowledge transfer from IT consultants to clients. Considering two parts of knowledge transfer in IS development projects, we must consider both 'where knowledge is transferred from' and 'where it is transferred to'. Therefore, in this study, we attempt to describe two different routes of knowledge transfer, such as knowledge transfer from an IT consultant to a client and knowledge transfer from a client to an IT consultant. In this regard, we have examined the effect of two different routes of knowledge transfer on system implementation success in IS development project. Specifically, we adopted the knowledge stock-flow theory to examine the causal relationship between IT consulting firms and clients in terms of knowledge transfer and eventual system implementation success. Survey data collected from 213 pairs of individuals (both clients and IT consultants) were used to test the model using three different analytic approaches such as PLS (partial least squares) and two types of mediated regression techniques. We found that knowledge transfers partially mediated both the relationships between IT consultants' IT skills (project members' business knowledge) and system implementation success. Furthermore, the effects of each knowledge transfer were distinguished by depending on the types of system, such as ERP or groupware. Our attempts have significant implications for both research and practice given the importance of effective knowledge transfer to IT consulting.

The Analysis of The Project Characteristics on a Comprehensive Village Development - A Case of The Rural Public Spaces and Facilities - (거점면단위 마을종합개발사업 특성 사례분석 - 농촌 공공공간 및 시설을 중심으로 -)

  • Do, Jee-Yoon;Suh, Joo-Hwan
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.3
    • /
    • pp.33-47
    • /
    • 2016
  • The purpose of this study is to understand the master plan of "The project on a comprehensive village development with a unit of a based township" through the master plan analysis and to help understand the implications of this project in order to maintain rural villages that can make local residents satisfied with them and promote the project of comprehensive rural village development as a successful way based on a comparative analysis through the in-site survey. The processes of this study are as follows. First, the analysis of development planning created a drawing based on linking business strategy by each region. The current situation and characteristics of planned public spaces were analyzed through the analysis of location and distribution of public spaces and facilities. Second, the situation analysis was performed by the task of shooting based on the basic plan information, and the master plan and status were confirmed through interviews. Also, the analysis of location and distribution of public spaces and facilities was conducted by a created drawings based on a survey. Finally, the detailed information of public spaces and facilities was compared with the investigation by in-site survey and analyzed through the Master Plan Strategy and a detailed classification of the types of facilities among each regional issues. In addition, by overlapping the planned drawings with the results, the results of formations were confirmed and the planned positional changes and the distribution of facilities were analyzed. As the results of "The project of comprehensive village development with a unit of based township", it was determined that there were many issues on cultural and welfare facilities in this project to meet the business objectives. Also, the facilities the residents needed, identified by interviews, were rural tourism facilities. According to the results, the residents cherished rural tourism facilities as much as basic living facilities. However, as the results of comparative analysis of public spaces and facilities, it was confirmed that mostly the plan was unfulfilled. Therefore, it is concluded that living, cultural and welfare facilities in the township can be maintained and expanded comprehensively as a purpose of "The project of comprehensive village development with a unit of based township" after not only planning process but also the project is fulfilled actually in rural areas.

Analysis of Residents' Perception Changes on Regional Capacity Empowerment Project in the Village - Comparison of Changes in the Perception of Residents in Rural and Fishing Village - (마을사업의 지역역량강화사업에 대한 주민 인식 변화 분석 - 농촌마을과 어촌마을의 주민 인식 변화 비교 -)

  • Yang, Minho;Kim, Kisung;Koh, Jinyoung;Kim, Myungil
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.65 no.3
    • /
    • pp.43-55
    • /
    • 2023
  • The Korean government has promoted rural development projects aimed at bridging the gap between cities and rural areas. However, prior research in assessing available rural projects was mainly focused on only part of the agricultural area, evaluation of project types and improvement measures, analysis of operating management policies, and measuring levels of importance by sub-project categories, and yet the study found a little study on residents' satisfaction of the project who is the direct and fundamental beneficiary. In particular, comparative studies on rural and fishing village residents were insufficient. Thus, the present study chose village residents from Chodo-ri where the Ministry of Oceans and Fisheries held the Customized Capacity Empowerment Project from the Gangwon Fishing Village Specialized Support Center and Songgye-ri where was the project area for rural revitalization project to navigate changes on both perception and satisfaction of the village residents before and after the education.

Trend Analysis of Development Projects in Gyeonggi Province - Focusing on the Target Projects of Environmental Impact Assessment - (경기도 개발사업의 추이 분석 - 환경영향평가 대상사업을 중심으로 -)

  • Kim, Su-Ryeon;Sung, Hyun-Chan
    • Journal of Environmental Impact Assessment
    • /
    • v.25 no.1
    • /
    • pp.15-24
    • /
    • 2016
  • This study was analyzed the distribution tendencies and statuses of development projects for EIA projects. According to the result of this study, in the annual analysis, a number of consultations and areas have shown increasing trend across the board. In the project type analysis, there are development project types; urban development, industrial complex, sport facility installation, resort complex development, road construction, which have a lot of developments. In the cities analysis, a number of consultations were about 53% on the top 5 cities, the areas were focused on 75%, and the development projects were concentrated in the southern distribution of Gyeong-gi province. The development axis, from 2004 to 2006, was C-type, but it was extended to O-type until 2010. Therefore, the development will expand into nature conservation zones and forest areas to the east. The development restriction area will be disappeared gradually because the development density of the surrounding Seoul city is more advanced, and we could predict that may be accelerated conurbation between the neighboring cities. Thus, when the development project is located, it would be reviewed difference in existing development project type, project size, and concentration in each city on the basis of environmental capacity.

A Study of Optimal Effort Allocation over Software Development Phase (소프트웨어 개발노력 치적 분배에 관한 연구)

  • Lee, Sang-Un;Kim, Young-Soo;Han, Pan-Am
    • The KIPS Transactions:PartD
    • /
    • v.9D no.5
    • /
    • pp.865-876
    • /
    • 2002
  • Successful project planning relies on a good estimation of the effort required to complete a project, together with the schedule options that may be available. Existing software effort estimation models are present only the total effort and instantaneous effort function for the software life-cycle. Also, Putnam presents constant effort rate in each phase. However, the size of total effort varies according to the software projects under the influence of its size, complexity and operational environment. As a result, the allocated effort in each phase also differs from one project to another. This paper suggests models for effort allocation in planning, specifying, building, testing and implementing phases followed by the project size and development types. These models are derived from 155 different projects. Therefore, these models can be considered as a practical guideline in management of project schedule and effort allocation.