• 제목/요약/키워드: Development Cost Model

검색결과 1,698건 처리시간 0.034초

정보시스템의 비용 평가 모형

  • 권영직
    • 한국산업정보학회논문지
    • /
    • 제2권1호
    • /
    • pp.177-201
    • /
    • 1997
  • In this paper, a model of cost evaluatino for computer software development is proposed . This model is designed to cope with various development environment since the development cost is directly dependent on the development environments. The model that satisfies the users request is turned out to be a function point model. For the future research , a model that contain new technique and new development environment and an imaginative model are desired . Also, in order to effective cost estimation a systematic research on structure of software development , establishment of standard development methodology, project management and technique are desired.

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

레일리 분포와 역-레일리 분포에 근거한 NHPP 소프트웨어 신뢰성 모형의 개발비용 속성 분석에 관한 연구 (A Study on Development Cost Attributes Analysis of NHPP Software Reliability Model Based on Rayleigh Distribution and Inverse Rayleigh Distribution)

  • 양태진
    • 한국정보전자통신기술학회논문지
    • /
    • 제12권6호
    • /
    • pp.554-560
    • /
    • 2019
  • 본 연구에서는 소프트웨어 신뢰성 분야에서 많이 사용하는 유한고장 NHPP Rayleigh 분포 모형과 NHPP Inverse Rayleigh 분포 모형을 소프트웨어 개발비용 모형에 적용한 후, 개발비용과 최적의 방출시간에 대한 속성을 비교, 분석하였다. 소프트웨어 개발비용의 속성을 분석하기 위하여 소프트웨어 고장시간 자료를 사용하였고, 모수추정은 최우추정법을 적용하였으며, 비선형 방정식은 이분법을 사용하여 계산하였다. 그 결과, Rayleigh 모형이 Inverse Rayleigh 모형보다 소프트웨어 개발비용이 비교적 적고, 소프트웨어 방출시점도 빨라서 상대적으로 우수한 모형임을 확인할 수 있었다. 본 연구를 통하여 기존 연구사례가 없는 Rayleigh 모형과 Inverse Rayleigh 모형의 개발비용 속성을 새롭게 분석하였으며, 더불어 소프트웨어 개발자들이 소프트웨어 신뢰도 향상 방법 및 개발비용의 속성을 탐색하는 데 필요한 기본지침으로 활용할 수 있을 것으로 기대한다.

발사체 개발의 연차별 비용 추정을 위한 비용모델 개발 (Cost Model for Annual Cost Spread Estimation of Space Launch Vehicle Development)

  • 김홍래;유동서;최종권;장영근
    • 한국항공우주학회지
    • /
    • 제39권6호
    • /
    • pp.576-584
    • /
    • 2011
  • 성공적인 발사체 개발을 위해서는 개발비용을 정확하게 추정하는 것도 중요하지만 연차별 예산 배분을 적절히 계획하는 것도 중요하다. 본 논문에서는 통계적 기법을 이용하여 개발기간 중 연차별 예산 배분에 대하여 분석하였다. 연차별 비용 모델링을 위해서 통계적 모델의 분석을 통해 적합성을 판단하여 베타분포모델을 선택하였고, 프로젝트의 설계와 기술의 성숙도로 추정이 가능한 모델을 개발하였다. 연차별 비용 모델의 타당성을 검증하기 위하여 우주왕복선 주 엔진(Space Shuttle Main Engine)의 실제 개발비용 분포와 본 모델을 통한 개발비용 분포의 비교 연구를 통해 적합성을 확인하였다. 또한, 본 논문의 개발 비용 모델을 한국형발사체 개발에 적용하여 연차별 소요 비용을 추정하였다. 본 논문에서 제시하는 연차별 분포 모델은 발사체뿐만 아니라 다른 대형복합시스템의 개발에도 활용이 가능할 것으로 예상된다.

단지공사의 공사비 예측모형 개발 - 토공사를 중심으로 - (A Development for Construction Cost Prediction Model of Site Development Project)

  • 이원용;이태식;박종현;배건
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.419-422
    • /
    • 2002
  • 현대 건설산업의 특징은 전문화, 복잡화, 대형화 등으로 다각적으로 변하고 있다. 따라서, 전통적인 공사비 관리체계로는 증가하는 건설공사의 불확실성을 감당할 수 없는 것이 현실이다. 이로 인하여 수많은 공사에서 공사비 증가현상이 발생하면서 건설사업의 성공적인 수행에 영향을 주고 있다. 따라서, 공사비 증가 현상을 방지하고, 효과적인 공사비 관리를 위해서는 정확한 견적을 통하여 관리 목표를 설정하고, 목표를 달성하기 위한 활동들이 필요하다. 본 연구에서는 효율적 공사비 관리를 위하여 기존에 사용된 공사비 모형을 분석하고, 단지조성 공사의 공사비 모형 구축에 필요한 표준 분석체계를 구축하여, 실제 단지조성 공사 사례 분석을 통하여 계획 및 설계단계에서 이용할 수 있는 공사비 모형을 제시하고자 한다.

  • PDF

실적자료에 의한 농어촌정비사업 사업비 결정에 있어서의 단가모델 구축 (Development of Construction Cost Estimation Model with the Actual Cost Data for Rural Development Project)

  • 배연정;이정재;윤성수
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 1999년도 Proceedings of the 1999 Annual Conference The Korean Society of Agricutural Engineers
    • /
    • pp.359-364
    • /
    • 1999
  • Providing the reasonable construction cost at the initial stage of the rural development project, is a kety factor of the each step of project , such as propriety analysis , cost planning , design, and planning the progress of work. The explainable construction cost can be estimated at the early stage using the actual cost data by statistical analysis. In this study, the influence factors are extracted by factor analysis with the actual cost data of rural development project, object cost model is developed by multiple regression analysis, and verify the developed cost model by Monte-Carlo simulation .

  • PDF

Inverse-type 수명분포에 근거한 유한고장 NHPP 소프트웨어 개발비용 모형의 성능에 관한 비교 연구 (Comparative Study on the Performance of Finite Failure NHPP Software Development Cost Model Based on Inverse-type Life Distribution)

  • 박승규
    • 한국전자통신학회논문지
    • /
    • 제18권5호
    • /
    • pp.935-944
    • /
    • 2023
  • 본 연구에서는 신뢰성 연구에 적합하다고 알려진 Inverse-type(: Inverse-Exponential, Inverse-Rayleigh) 수명분포를 유한고장 NHPP(: Nonhomogeneous Poisson Process) 기반의 소프트웨어 개발비용 모형에 적용한 후, 성능을 결정하는 속성을 분석하였다. 또한, 모형의 효율성을 평가하기 위해 Goel-Okumoto 기본 모형과 함께 비교하였다. 고장 시간 데이터를 이용하여 모형의 성능을 분석하였고, 모수의 계산은 MLE(: Maximum Likelihood Estimation)를 적용하였다. 결론적으로, 첫째, 개발비용을 결정하는 m(t)를 분석한 결과, Inverse-Exponential 모형이 참값에 대한 오차가 적어 효율적이었다. 둘째, 개발비용과 함께 방출시간을 분석한 결과 Inverse-Rayleigh 모형이 가장 좋은 것으로 확인되었다. 셋째, 제안된 모형의 속성(m(t), 비용, 방출시간)을 종합적으로 평가한 결과, Inverse-Rayleigh 모형의 성능이 가장 우수하였다. 따라서 소프트웨어 개발자가 초기 프로세스에서 본 연구 데이터를 효율적으로 활용할 수 있다면, 비용에 영향을 미치는 속성들을 사전에 탐색하고 분석할 수 있을 것이다.

장대 PC교량의 최적 내진설계 및 성능개선을 위한 최소 기대 Life Cycle Cost 모델 (Minimum Expected Life Cycle Cost Model for Optimal Seismic Design and Upgrading of Long Span PC Bridges)

  • 조효남;임종권
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.305-312
    • /
    • 1999
  • This study is intended to propose a systematic and practical life cycle cost(LCC) model for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges. The LCC models consist of five cost functions such as initial cost, repair/replacement cost, human losses, road user cost, and indirect losses of regional economy. The proposed model Is successfully expressed in temrs of Park-Ang damage indices and life cycle damage probability obtained from SMART-DRAIN-2DX which is an existing algorithm for nonlinear time history analysis. The proposed LCC model is successfully applied to a viaduct constructed by PSM, in Seoul. Based on the observations, the proposed systematic procedure for the formulation of LCC model may be useful for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges.

  • PDF

The Optimal Release Time in Cost Model Using PCLS Model

  • Song, Kwang Yoon;Chang, In Hong;Choi, Min Su;Lee, Da Hye
    • 통합자연과학논문집
    • /
    • 제9권3호
    • /
    • pp.206-214
    • /
    • 2016
  • The basic goal of software development is to produce high quality software at low cost. Therefore, when to stop software testing and release the software product is a significant point in the software development. The software cost model is an effective tool used to help software developers control costs and determine the release time. In this paper, we discuss the cost model to apply all 6 models with consideration of time to remove errors, cost of removing each error and risk cost due to software failure. We show the impact of cost coefficients and parameter values on the expected total cost by changing the values and comparing the optimal release times.

Type-2 Gumbel과 Erlang 분포의 형상모수를 따르는 수명분포에 근거한 소프트웨어 개발 비용모형에 관한 특성 연구 (A characteristic study on the software development cost model based on the lifetime distribution following the shape parameter of Type-2 Gumbel and Erlang distribution)

  • 양태진
    • 한국정보전자통신기술학회논문지
    • /
    • 제11권4호
    • /
    • pp.460-466
    • /
    • 2018
  • 정보기술의 발달로 컴퓨터 소프트웨어 시스템의 규모는 끊임없이 확장되고 있다. 소프트웨어 개발에 대한 신뢰성 및 비용은 소프트웨어 품질에 큰 영향을 미치고 있다. 본 연구에서는 소프트웨어 고장 간격시간 자료를 바탕으로 NHPP 모형에서 Type-2 Gumbel과 Erlang 분포의 형상모수를 따르는 수명분포에 근거한 소프트웨어 개발 비용모형에 관한 특성을 비교하고, 분석하였다. 그 결과, Go-Okumoto 모형 및 제시한 모형인 Erlang 모형과 Type-2 Gumble 모형에 대한 비용곡선의 추세는 모두 초기단계에서 감소하다가, 고장시간이 지나는 후반부에 가서는 점차 증가하는 결과를 보였다. 또한, Erlang 모형과 Type-2 Gumble 모형을 비교한 결과, Erlang 모형이 소프트웨어 출시시기가 빠르고, 출시시점의 비용도 경제적임을 알 수 있었다. 본 연구를 통하여, 소프트웨어 운용자들은 소프트웨어 출시시기 이후에 결함이 감소되도록 운영단계보다 테스팅 단계에서 결함들을 제거해야 하며, 소프트웨어 개발비용에 관한 특성을 파악하는데 필요한 사전정보을 연구할 수 있을 것으로 기대된다.