• Title/Summary/Keyword: Developer

Search Result 824, Processing Time 0.025 seconds

Game Developer

  • Korea Database Promotion Center
    • Digital Contents
    • /
    • no.3 s.130
    • /
    • pp.145-164
    • /
    • 2004
  • PDF

Game Developer

  • Korea Database Promotion Center
    • Digital Contents
    • /
    • no.9 s.136
    • /
    • pp.145-166
    • /
    • 2004
  • PDF

Game Developer

  • Korea Database Promotion Center
    • Digital Contents
    • /
    • no.11 s.138
    • /
    • pp.129-150
    • /
    • 2004
  • PDF

Game Developer

  • Korea Database Promotion Center
    • Digital Contents
    • /
    • no.6 s.133
    • /
    • pp.145-166
    • /
    • 2004
  • PDF

Game Developer

  • Korea Database Promotion Center
    • Digital Contents
    • /
    • no.4 s.131
    • /
    • pp.129-150
    • /
    • 2004
  • PDF

The Role of Public Developer in Urban Regeneration Projects

  • Lee, Sam-Su;Jeong, Kwang-Jin
    • Land and Housing Review
    • /
    • v.8 no.2
    • /
    • pp.59-71
    • /
    • 2017
  • With the passing of Special Act on Promotion and Support for Urban Regeneration (will be hereafter referred to as the Urban Regeneration Special Act) in December 2013, urban regeneration projects have begun in full scale. 13 regions including Jongno District, Seoul were selected as the urban regeneration leading area in 2014 and 33 regions as urban regeneration general regions in 2015 to push ahead a nationwide urban regeneration front supported by government funds. However, it is not clear if these urban regeneration projects will be revitalized by the sole means of government's financial support. Above all, cooperation among all interested parties including the central government that is propelling urban regeneration, local governments, state corporations, private entities, and citizens is urgent. In an urban regeneration project, delegation between state and private entities is absolutely crucial. The central government and the pertinent local government must provide their support by forming new policies and repairing old institutions that are right for urban regeneration, securing the necessary subsidy, and outsourcing government-owned land development. A state corporation must play its part in every aspect that requires public character such as an overall project management of an urban regeneration project, cooperation with the local government, and infrastructure installation. The private stakeholder must share his private capital and know-hows as a construction investor and a development businessman to make possible a successful urban regeneration project. In order for these public and private entities to cooperate with one another, it is necessary to reestablish the role of a public developer and contemplate running an urban regeneration project that permeates public character through a public developer.

Development of Game Developer Career Experience Program using Scratch (스크래치를 활용한 게임 개발자 진로체험 프로그램 개발)

  • Kim, Soohwan;Kim, Sanghong
    • The Journal of Korean Association of Computer Education
    • /
    • v.23 no.1
    • /
    • pp.45-52
    • /
    • 2020
  • The purpose of this study is to develop a game developer career experience program that promotes student participation and to verify its effectiveness. The game developer career experience education program currently operated by Job World is composed of passive course, which makes students less interesting and only passive activities are possible. In this study, we improved the existing coursework type program to experience actual game development using scratch to promote learner participation. Scratch can be created and shared, giving students the opportunity to create their own work. Therefore, this study developed the game developer career experience education program using scratch and verified its effect. Two Delphi tests were conducted to develop the training program and one expert council was held. In addition, pilot classes were conducted from 22 elementary school students and 30 middle school students, and the satisfaction test was conducted. As a result, the developed educational program showed positive results in terms of help, satisfaction, effectiveness, and awareness.

Differences in Facilities of Natural Recreation Forests Developed by Public and Private Bodies (개발주체별 자연휴양림 시설물의 차이)

  • 장병문;서정희
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.28 no.3
    • /
    • pp.39-52
    • /
    • 2000
  • The purpose of this paper is to investigate the difference in facilities of natural recreation forests developed by public and private body to answer the research that what is the difference in development of natural recreation forest between public and private developer\ulcorner After reviewing the literatures, developer's decision-making and motivation of investment, and the planning process of natural recreation forest, we had constructed th conceptual framework and have found the hypothesis of this research. Using data on development status of natural recreation forests and questionnaire surveying of 625 visitors from 9 among 72 natural recreation forests in Korea, We analyzed the data through the comparison of quantity of facilities per 1000 visitors and logistic regression method for quality of facilities. We have found that 1) the six facilities have been turned out to be statistically significant in determining the difference of public and private recreation forests. i.e., infrastructure including roads, maintenance and information and lodging and evacuation, indoor education, outdoor education, and shopping, 2) public recreation forests are well equipped such basic facility as roads, maintenance and information, lodging and evacuation while private recreation forests are well equipped such facility as indoor education, outdoor education, and shopping, and 3) the importance of such facility as roads, maintenance and information, lodging and evacuation, outdoor education, and shopping have been turned out to have 1.99, 2.26, 1.99, 3.01 and 2.24 times more important than that of indoor education, respectively. We can conclude that public recreation forest seems to be equipped with the facilities for sound recreational opportunities for general public, and private recreation forest turned out to have more facilities for pursuit of profits, installed basic facilities for user convenience and service, and special facilities for attracting user and raising revenue. Using the results of this research, we can make a guideline for a market positioning, and standards and provisions of natural recreation forests. We suggest that the relationship between user-satisfaction and recreation facility is needed to be examined in the future research.

  • PDF

Effort Analysis of Unit Testing Conducted by Non-Developer of Source Code (원개발자 부재에 따른 원시코드 기반의 단위테스트 노력 분석)

  • Yoon, Hoijin
    • Journal of Information Technology Services
    • /
    • v.11 no.4
    • /
    • pp.251-262
    • /
    • 2012
  • Unit testing is one of the test levels, which tests an individual unit or a group of related units. Recently, in Agile Development or Safety-critical System Development, the unit testing plays an important role for the qualities. According to the definition of unit testing, it is supposed to be done by the developers of units. That is because test models for the unit testing refers to the structure of units, and others but its original developers hardly can understand the structures. However, in practice, unit testing is often asked to be done without the original developers. For example, it is when faults are revealed in customer sites and the development team does not exit any more. In this case, instead of original developers, other developers or test engineers take a product and test it. The unit testing done by a non-developer, who is not the original developer, would cause some difficulties or cause more cost. In this paper, we tests an open source, JTopas, as a non-developer, with building test models, implementing test codes, and executing test cases. To fit this experiment to practical testing situations, we designed it based on the practices of unit testing, which were surveyed through SPIN(Software Process Improvement Network). This paper analyzes which part of unit testing done by non-developers needs more effort compared to the unit testing done by original developers. And it concludes that Agile Development contributes on reducing the extra effort caused by non-developers, since it implements test codes first before developing source code. That means all the units have already included their own tests code when they are released.

"Standard Model" approach to building projects in the UK and potential role of project team to mitigate any local difference~from international developer's perspective

  • Tanaka, Koji
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.425-432
    • /
    • 2020
  • In order to improve the sustainability and smart construction, it is discussed arguably that developing and applying consistent "standard model" to plan business, design, construct and operate a building is considered to be one of the effective and efficient approach. The scope of this article is to examine, from the international developer's perspective, the "standard model" approach of a hotel brand to building projects in the UK, and also to explore potential role of project team to mitigate any local difference at the project level. These projects are developed by the same developer adopting the same business plan, design and operation to each project. In order to clarify the actual and likely difference in construction results, reference is also made to those building projects located in other geographical markets including Japan, Germany and USA, and focus is given on the analysis of its programme and cost. Principle findings are that there exists geographical difference especially in environmental and planning system, and that major local difference is found at least in the programme at the design stage. In contrast, the difference in the building cost itself may not be necessarily considered major if currency exchange rate being taken into account appropriately. It is also observed that there were cases where any difference in the programme was mitigated by taking different approach to procuring and defining roles of management and professional team at the project level. In conclusion, from the international developer's perspective, the geographical difference of the "construction system" surrounding building projects can typically lead to major prolongation of programme, however, these different construction results could be mitigated at least to a certain extent by introducing appropriate changes to the role of project team.

  • PDF