• Title/Summary/Keyword: Detailed Performance Procedures

Search Result 74, Processing Time 0.028 seconds

A study on Product Assurance for development of Ka band Communication Payload System of COMS (통신해양기상위성의 Ka 통신탑재체 개발 제품보증 연구)

  • Jeong, Cheol-Oh;Lee, Seung-Pal
    • Journal of Aerospace System Engineering
    • /
    • v.2 no.1
    • /
    • pp.22-27
    • /
    • 2008
  • It is anticipated that quality assurance for the Ka band Communication Payload System(COPS) development program of the Communication, Ocean & Meteorological Satellite(COMS) may be a core technical factor to be concerned in order to avoid any failure, and to assure its performance during the mission lifetime in space. Those can be managed and verified and assessed by performing the Quality Assurance (QA) and risk management which helps to prevent and reduce the critical fails. This paper introduces the Product Assurance (PA) system and procedures for Ka band Communication Payload System which was established and performed during the Qualification Model (QM) manufacturing phase. In this paper, we present detailed process for the products manufactured by local companies according to PA procedures operated through whole phases from design to test of equipment. Also this paper shows Quality Assurance (QA) procedures and detailed their processes for assured the product quality manufactured by local companies.

  • PDF

Performance Evaluation of Korean Power System for Developing the Planning Standards (계통계획기준 수립을 위한 한전계통의 성능평가)

  • Kook, Kyung-Soo;Oh, Tae-Kyoo;Kim, Tai-Hyun;Kim, Hak-Man;Bang, Min-Jae;Lee, B.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.203-205
    • /
    • 2001
  • This paper is part of an ongoing project of KEPCO; 'A Study on Criteria and Standards for Transmission System Planning', The objective of this project is to develop the standards and procedures for transmission system planning. This involves reviewing published literatures, other documents of existing criteria and procedures, and various case studies of advanced countries which are already under the competitive electricity industry. This paper presents the result of evaluating Korean Power System as a pre-study for developing the Planning Standards of Korean Power System. For this, WSCC/NERC's performance criteria for planning transmission system, and KEPCO's 'Long Term Transmission System Planning Criteria' are considered. By doing this, the level of performance criteria which should be applied to Korean Power System and the detailed procedures which would be used in system test were reviewed.

  • PDF

A Study on Reform Scheme of Software Industrial Promotion Law (소프트웨어산업진흥법의 개선방향에 관한 연구)

  • Choi, Chang-Ryeol
    • Journal of Information Technology Services
    • /
    • v.5 no.1
    • /
    • pp.61-81
    • /
    • 2006
  • It is necessary to systematically explore the reform plans of the Software Industrial Promotion Law to systematically a representative high-added value future knowledge-based industry, software industry. The current Software Industrial Promotion Law provides only one provision on software business contract procedures, and the Civil Code, the National Contract law or Subcontract Fairness Law regulate other things, so the features of software industry are not properly reflected. To the contrary, the Information Communication Construction Law or the Construction Basic Law effectively prevent disputes by providing material and detailed provisions. Therefore the current software industry needs to be shifted from promotion to fundamental one. That is, as the software industry takes up a large portion at present, so the law should have basic procedural provisions. Also the National Contract Law governs only the contract procedures of public sector, so there should be business performance procedural provisions to regulate the software business formalities of civil sector. And the National Contract Law controls the sale, construction and service of articles at separate contract procedures, but software business contains construction and service characters simultaneously, so there should be business performance procedures fit for software business. Thus this study presented the legislative need and bill on the performance procedures of software business.

A Study on Evaluation Criteria and Procedures for Measuring Radiation Leakage of Aviation Security Equipment (항공보안장비 방사선 누출량 측정을 위한 평가 기준 및 절차에 관한 연구)

  • Kihyun Kim;Ye-Eun Jeong;Ye-Jun Kim;Yong Soo Kim
    • Journal of Korean Society for Quality Management
    • /
    • v.51 no.3
    • /
    • pp.435-444
    • /
    • 2023
  • Purpose: To attain advanced performance certification, safety aspects along with functionality and performance are essential. Hence, this study suggests radiation leakage assessment methods for aviation security equipment during its performance certification. Methods: Detection technology guided the choice of radiation leakage assessment targets. We then detailed measurement and evaluation methods based on equipment type and operation mode. Equipment was categorized as container or box types for establishing measurement procedures. Results: We've developed specific radiation leakage assessment procedures for different types of aviation security equipment, crucial for ensuring airport safety. Using these procedures allows efficient evaluation of compliance with radiation leakage standards. Conclusion: The suggested radiation leakage assessment method aims to enhance aviation security and reliability. Future research will focus on identifying risks in novel aviation security equipment detection technologies and establishing safety standards.

The Quality Certification of Railway Components for Safety Guarantee (안전성 확보를 위한 철도용품의 품질인증)

  • Kim Jeongguk;Kim Jin-Hwan;Kwon Sung-Tae;Baek Seung-Koo
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.27-31
    • /
    • 2005
  • In order to guarantee the safety of railway, the Railway Safety Law (RSL) and ordinances have been enforced. In RSL, the quality certification is required to guarantee the safety and performance of railway components. Therefore, in this investigation, the detailed guidelines and main contents for the enforcement of quality certification for railway components will be suggested, and the detailed items including the procedures, subjects, management, etc., will be addressed.

  • PDF

Design on Fixed Quantity Analytical Model for Information System Audit (정보시스템 감리의 정량화 분석 모델 설계)

  • Kim, Hee-Wan;Lee, Hae-Man;Kim, Dong-Soo
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.2
    • /
    • pp.88-100
    • /
    • 2011
  • This thesis suggests fixed quantity model and detailed performance procedures of an information system audit. In addition, an identification of the check-items with high operating risk and factors that might lead to serious effects on the business are made. Then, this thesis proposes the information system audit model that can grant priorities. By using this model, the orderer can evaluate objectively with digitized mark. The model can improve the effectiveness, reliability, and objectivity of the audit by minimizing the discrepancies of different opinions about audit evaluation results between auditee and the orderer. The proposed model is adapted to an application system and audit projects of the database construction. As a result, the model has received an equal mark from the result of the general reviews, thus the propriety of the proposed model was verified.

A Study on Overall Measurement System Development of HEMU-400X Performance Test (차세대고속열차 성능시험을 위한 종합계측시스템 개발 연구)

  • Lee, Young-Yeob;Ryu, Sang-Hyun;Kim, Bong-Rae;Kim, Kyung-Taek
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1118-1123
    • /
    • 2011
  • The introduction of high speed railway(KTX) in Korea after the Korean high speed train through the KTX-II of the development is being run is made. Thus the demand for the railway technology advances and high performance, Korean government promoted the development of the next-generation high speed train system(HEMU-400X). In addition to the production of train system essential element of the train through an on-line test is to evaluate the performance. Through the on-line test of the train in order to evaluate the performance test items should be selected first and need to the test procedures are required. In addition, an Overall Measuring System(OMS) to measure the performance of the train system should be established. In this study for the on-line test of the HEMU-400X test items was selected for detailed measurements and performance evaluation of a comprehensive and efficient trains to test an OMS for the development are discussed.

  • PDF

Deductions of KPIs for BSC and Process KPIs for BPM in Railway Construction (철도건설에서 BSC의 KPI도출과 BPM을 위한 프로세스 KPI도출)

  • Ryu Si-Wook;Ahn Byung-Jun;Ryu Myung-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.388-393
    • /
    • 2006
  • Recently, Korean government demands that public sectors like railway construction should improve their management efficiency. It is necessary for railway construction supported by government budget to aim at the companywide management efficiency. The Balanced Scorecard (BSC) is known as integrated performance management framework that helps a company to translate strategic objective info relevant performance within an organization. This paper focuses on relationship between KPIs (Key Performance Indicators) used to measure the performance of railway construction industry and process KPT for BPM (Business Process Management). Also, the vision and strategies of the railway construction is introduced, and the CSFs (Critical Success Factors) and the KPI based on BSC is developed. Finally, this paper explores that there is a possibility to fulfill the strategic objectives of railway construction industry through the connectivity between KPI based on BSC and process KPI based on BPM. We explain the detailed procedures with an example of railway construction industry.

A study on Sub-contractor Product Assurance for development of Ka band Communication Payload System of COMS (통신해양기상위성 Ka 통신탑재체 개발 공동 및 용역 개발 참여기관 제품보증 연구)

  • Jeong, Cheol-Oh;Lee, Seung-Pal
    • Journal of Aerospace System Engineering
    • /
    • v.3 no.1
    • /
    • pp.6-11
    • /
    • 2009
  • It is anticipated that quality assurance for the Ka band Communication Payload System(COPS) development program of the communication, Ocean & Meteorological Satellite(COMS) may be a core technical factor to be concerned in order to avoid any failure, and to assure its final performance during the mission lifetime in space. Those can be managed and verified and assessed by performing the Quality Assurance (QA) and risk management which helps to prevent and to reduce the critical fails. This paper introduces the Product Assurance (PA) system and procedures for controlling and monitoring sub-contractors which were participated in Ka band Communication Payload System (COPS) development. Also this paper shows Quality Assurance (QA) procedures and detailed their processes for assured the product performed by local companies from site survey for selecting companies to delivery of their equipment.

  • PDF

Algorithms for Production Planning and Scheduling in an Assembly System Operating on a Make-to-Order Basis (주문생산방식을 따르는 조립시스템에서의 생산계획 및 일정계획을 위한 알고리듬)

  • Park, Moon-Won;Kim, Yeong-Dae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.3
    • /
    • pp.345-357
    • /
    • 1998
  • This paper focuses on production planning and scheduling problems in an assembly system operating on a make-to-order basis. Due dates are considered as constraints in the problems, that is, tardiness is not allowed. Since the planning problem is a higher-level decision making than the scheduling problem, the scheduling problem is solved using a production plan obtained by solving the planning problem. We suggest heuristic procedures in which aggregated information is used when the production planning problem is solved while more detailed information is used when the scheduling problem is solved. Since a feasible schedule may not be obtained from a production plan, an iterative approach is employed in the two procedures to obtain a solution that is feasible for both the production planning and scheduling problems. Computational tests on randomly generated test problems are done to show the performance of these algorithms, and results are reported.

  • PDF