• Title/Summary/Keyword: Design-Build Project

Search Result 222, Processing Time 0.029 seconds

A Study on the BIM-based Design for the Elements of Wooden Structure of Korean Traditional Buildings Through a Parametric Design Methodology (파라메트릭 디자인 방법론을 활용한 한옥 목구조부재의 BIM 설계 프로세스 연구)

  • Park, Jung-Dae
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.2
    • /
    • pp.104-113
    • /
    • 2011
  • With the rising social interest in the sustainable life, demands are growing for Hanok, as a viable alternative to modernized architecture of Western origin. However, even Hanok is gaining popularity among the general public, its design and construction are still a minor practice. Aiming to build an information system of Hanok, this research proposes a new design process for traditional architecture, utilizing a parametric design methodology. This process, based on the understanding of tectonic joints and spatial composition of our traditional architecture, defines a parametric relationship among the structural elements that compose Hanok. The research uses Gehry Technologies' Digital Project and Autodesk Revit Architecture to apply a concurrent parametric design methodology, approaching the project in both bottom-up and top-down to present a new design process for Hanok elements.

An Information Model to Facilitate Sustainable Design of Building Projects in the UAE

  • Zaneldin, Essam
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.544-548
    • /
    • 2015
  • As urbanization increases in UAE, the demand for housing and infrastructures also grows. The challenge is to continue to build but in a different way considering more energy-efficient sustainable buildings. Producing a sustainable design is highly dependent upon effective participation among the diverse parties involved. In the construction industry in the UAE, these parties are fragmented due to the multistage nature of construction projects and multidisciplinary participants, particularly during the design stage. The decisions made during this stage have an extensive impact on subsequent stages of a project's life cycle. Having a sustainability expert during the design stage is important and the awareness of sustainability requirements by all design participants is of equal importance. In this research, recent advances in information technology are used to develop an information model that will improve the sustainability of building during the design stage. An information framework for storing design information and sustainability performance criteria is developed, allowing design participants to collaborate in an integrated environment. This research is expected to help designers produce sustainable designs for building projects.

  • PDF

A Study on School Facilities Build Transfer Lease Project - Centering on the improvement of the assessment - (학교시설 임대형민자사업의 평가기준 개선연구)

  • Kwon, Byoung-Koo;Lee, Jae-Rim;Jo, Jin-Il
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.7 no.2
    • /
    • pp.30-46
    • /
    • 2008
  • In this study, were prepared after statistical analysis was conducted of assessment items and marks distribution for the selection of executors of the BTL project. When tests of the degree of dispersion and degree of appropriateness for each assessment item were analyzed, it was found that the degree of dispersion among assessment points has the power of discrimination since it is highly marked in the design field and operation management field. In contrast, 'business management plan' and 'investment composition for economic quality assessment' have a low level of the power of discrimination since points given to them have smaller difference between business projects.

  • PDF

A Study on the Improvement of Architectural Design Contract Phase in the Overseas Construction Market through the Analysis of Inefficient Factors (효율성 저해요인 분석을 통한 건축설계분야의 해외건설 계약단계 개선방안에 관한 연구)

  • Lim, Jae-Bok;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.155-162
    • /
    • 2010
  • Following the successful entry of Korean builders into overseas construction markets, Korean architects have also become active abroad, and have expanded their market share centered on the Southeast Asia and Middle Eastern areas through Design-Build contracts. However, there have also been However, conflict can arise among the project applicants in the contract stage due to the special characteristics of overseas construction. This sometimes leads to the failure of a project. Using statistics and case studies, this study identified problems in the overseas construction market. It analyzed inefficient factors of the architectural design contract phase in the overseas through a survey and an interview of specialists. Based on the results, this study suggested a master architect system, and some resolutions to the problems of organizing an internal evaluation system. It is expected that the results can be used as practical data for companies that want to advance into the overseas market.

Study On the Object Oriented Design Project of Online Game Engine Using UML (UML을 사용한 온라인 게임 엔진 프로젝트 설계 연구)

  • Choi, Sung
    • Journal of Korea Game Society
    • /
    • v.5 no.1
    • /
    • pp.33-40
    • /
    • 2005
  • Game Designs & Developers that system designs improve, the product and the change of tasks to all developers are essential in achieving On-Line Game project. Existent Or-line Game project management designs supper the definition and the change of project activities, and configuration management designs support version check, workspace management, build management, etc. In this paper. the proposed Design defines Game component based development process model, and achieves recording of process progression, processing the request of change, reporting the progression of each task, product registering and change, version recording, artifact or form search, etc. using UML. Furthermore, study on the stake holders get the systematic management and standardization by sharing information that are necessary in Game design & development and configuration management in distributed environment using the system integrated management design.

  • PDF

Study On the Object Oriented Design Project of Online Game Engine Using UML (UML을 사용한 온라인 게임 엔진 프로젝트 설계 연구)

  • Choi, Sung
    • Journal of Korea Game Society
    • /
    • v.4 no.3
    • /
    • pp.21-28
    • /
    • 2004
  • Game Designs & Developers that system designs improve, the product and the change of tasks to all developers are essential in achieving On-Line Game project. Existent On-line Game project management designs supper the definition and the change of project activities, and configuration management designs support version check, workspace management, build management, etc. In this paper, the proposed Design defines Game component based development process model, and achieves recording of process progression, processing the request of change, reporting the progression of each task, product registering and change, version recording, artifact or form search, etc. using UML. Furthermore, study on the stake holders get the systematic management and standardization by sharing information that are necessary in Game design & development and configuration management in distributed environment using the system integrated management design.

  • PDF

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.

A Project Delivery System Selection Model for Large Public Construction Projects (대형 공공공사의 적정 발주방식 선정모델)

  • Hyun Chang-Taek;Seo Yong-Chil;Lee In-Keun;Ryu Kil-Sang;Lee Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.71-80
    • /
    • 2000
  • Project delivery systems determine the relationship, responsibility, authority and the scope of works of those involved in project, hence, optimum project delivery system should be selected to so that construction project would be executed successfully, Until now, the traditional design-bid-build mainly has been used for public projects, but the government is making efforts actively to introduce other methods such as design-build, alternative bidding by its policy. However, delivery systems should be determined through considering physical projects characteristics, owner's goals, external factors, etc, rather than government' policy. Therefore, the purpose of this research is to propose objective delivery system selection criteria and delivery system selection model, which help owners to select the suitable delivery system through quantitative and reasonable manner.

  • PDF

The Trend of CM at Risk in the U.S Construction Market (미국 CM at Risk 시장 동향 및 시사점)

  • Chang, Chul-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.67-73
    • /
    • 2006
  • Alternative project delivery methods including design-build and CM at Risk have evolved as a means of meeting owner's diverse needs and implementing project efficiently with limited budget and time in more competitive construction environment. It is time to consider adopting alternative project delivery methods, especially CM at Risk, for domestic construction industry to enhance competitiveness and to provide various options for owners so that they can select more appropriate project delivery methods for the facility being planned. This research report derives suggestions from investigating how CM at Risk has been evolved in the US construction market. Besides the analysis of CM at Risk market in the US construction industry, the characteristics of companies whose market share are in Top 100, the type of facility usually built by this method were investigated. Based on the analysis of CM at Risk in the US, the prepositions in adopting CM at Risk to domestic construction industry and the possibility of adopting this method have been identified.

  • PDF

A Study of Software Product Line Engineering application for Data Link Software

  • Kim, Jin-Woo;Lee, Woo-Sin;Kim, Hack-Joon;Jin, So-Yeon;Jo, Se-Hyeon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.12
    • /
    • pp.65-72
    • /
    • 2018
  • In this paper, we have studied how to reuse common data link software by applying software product line engineering. Existing common data link software performed different stages of design, implementation, and testing without sharing the accumulated knowledge of different developers. In this situation, developers agreed that sharing the assets of each project and reusing the previously developed software would save human and time costs. Even with the initial difficulties, the common Data Link is a continually proposed project in the defense industry, so we decided to build a product line. The common data link software can be divided into two domains. Among them, the initial feature model for the GUI software was constructed, and the following procedure was studied. Through this, we propose a plan to build a product line for core assets and reuse them in newly developed projects.