Evaluation on Performance Level of Design-Build and Design-Bid-Build (Focused on Bridge Construction Projects) (발주방식에 따른 성능수준 평가에 관한 연구)

  • Cho, Kyu-Man;Kim, Hee-Wook;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.75-83
    • /
    • 2007
  • Recently, the Design-Build (DB) delivery method in public sector makes some argument by reason of the initial cost which is more higher than those of Design-Bid-Build (DBB). According to the results of pervious researches related to the performance evaluation of delivery method, DB can lead the reduction of project cycle time and also is superior to the traditional DBB in terms of construction quality. The performance on each delivery method could be generally evaluated by a project cost and a project cycle time as one of quantitative analyses, and also by construction quality as one of qualitative analyses. In most researches, the evaluation of performance level based on delivery methods has been evaluated by the degree of their satisfaction through the interview with owners. Therefore, this paper analyzed the design documents of construction projects delivered by traditional DBB and DB in bridge construction projects in order to measure design quality, constructability, maintainability, and etc. As an above-mentioned analyses, finally, this research shown that how much the difference of performance level is by each delivery method.

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

Contractor Selection Method for Public Design-Build Projects (대형 공공 일괄입찰사업의 낙찰자 선정방식에 관한 연구)

  • Jung Dae-Won;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.119-124
    • /
    • 2006
  • Design-Build, one contractor is responsible for both the design and construction, has become more popular since the government framed the policy on how to activate the design-build projects in 1996. The reality is, however, there are many problems encounted on Contractor Selection Method for Public Design-Build Projects. The purpose of this paper is to improve the problems, no way to meet the goal(value) the owners expect from the design-build projects, for instance, not fully reflecting the characteristics of projects and owners intention, not systematical enough to judge if bidders could carry out the contract. This study will insist we introduce Best Value Procurement, which is being commonly used in some advanced countries recently, so that we would properly select the contractor suitable for Best Value concept which totally depends on the owners, types of work and specified conditions. Furthermore, by passing through the Two-Step Procedures following Pre-qualification in Best Value Procurement, we expect it lighten the bidders' burden for proposal and the owners' complicate bid administration.

  • PDF

A Study on the adequacy of Hospital Architecture Deign-Build and Improvement of Assessment Criteria - Focus on the case of Architectural Planning Design Change - (병원건축 일괄입찰방식의 적합성과 평가기준 개선방안에 관한 연구 - 건축계획의 설계변경사례를 중심으로 -)

  • Hong, Seung-Min;Yang, Nae-Won
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.2
    • /
    • pp.215-222
    • /
    • 2012
  • Design-build is expanding gradually in large construction projects over 10billion won, and continue to work in health care facilities is increasing in this way. This constructional method in health care facilities, despite the many advantages, many problems caused by design changes are being raised. Raises the question of design changes on the side of construction contract, such as approval systems have been studied in the field of construction. The purpose of this study design in aspects of architectural planning on changing the grasp of the issues outlined in the ITB and bid evaluation criteria through consideration of the basic plan for improvement guidelines and evaluation criteria is presented. In conclusion, Design build, according to the presence of existing users are more likely to lead to design changes. Thus, hospital architecture, depending on how it is considered that constructional methods. And evaluation items of ITB(Invitation To Bidder) for a large part of the change in the variables evaluated in the hospital building is not suitable for the design build. Instead, the overall shape of the building and department, unit type and size, vertical and horizontal parts of the circulation system in the shape of the building that does not change in structure and etc should be considered for evaluation.

  • PDF

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

A Process Model for Project Management of Design-Build System and Method for Constitution of Database (건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안)

  • Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.242-245
    • /
    • 2004
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.

  • PDF

The Process Model for Project Management of Design-Build System and Constitution of Database (설계시공일괄 방식의 건축 프로젝트 관리를 위한 프로세스 모델 및 데이터베이스 구축)

  • Chun Jae-youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.109-116
    • /
    • 2005
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alternative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather din single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial t31ow-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigate throughly the function and information flows all over the design-build project. This research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to improve the consistency of functional process and minimize incoherent activities of the design-build projects.

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

IMPACTS OF DESIGN-BUILD DELIVERY SYSTEM ON THE CONSTRUCTION INDUSTRY IN TAIWAN

  • Min-Ren Yan;Wei Lo;Chien-Liang Lin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1007-1012
    • /
    • 2005
  • Although the design-build (DB) delivery system has been taking great strides in the world and relevant researches have also been quite abundant, few studies have dealt with its potential impacts on the construction industry as a whole. This research first identified the potential entry barrier factors, which may hinder the market access, based on the theory of industrial economics and characteristics of DB project. Then through a nation-wide questionnaire survey involving 103 construction contractors and engineering consultants, the influences of each factor on company's competitiveness and corporate strategies were scrutinized, and consequently, the evolution of the construction industry was examined. It is found that as opposed to the traditional design-bid-build delivery system, the DB delivery system elevates competitive advantages of large organizations in terms of the financial capability, working experience, human resource, and administrative strength, and among them, the financial strength was concluded to be the most significant force in differentiating corporate strategies and widening the gap of competitiveness between companies. It is inferred if the government extensively adopts DB delivery system, large organizations that already possess the competitive advantage tend to obtain both design and construction abilities, and dominate the DB market. Small and medium sized companies will find little room to maneuver and be forced to become specialty sub-contractors.

  • PDF

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.