• Title/Summary/Keyword: Design volume criteria

Search Result 127, Processing Time 0.032 seconds

Effects of Nursing Intervention of Mutual Goal Setting on Gastrectomy Patients According to Health Locus of Control (위절제술환자의 건강통제위에 따른 상호목표설정 간호중재의 효과)

  • Jang Eun-Hee
    • Journal of Korean Academy of Fundamentals of Nursing
    • /
    • v.5 no.1
    • /
    • pp.107-124
    • /
    • 1998
  • Based on King's goal attainment theory, this research deals with applying nursing intervention of mutual goal settings to gastrectomy patients. It tests the effects of nursing intervention, according to the patients' health locus of control, suggested as external boundary criteria for the theory by employing a quasi-experimental design which consists of a pretest-posttest non-equivalent control and experimental groups. The subjects of this research were 62 gastrectomy patients hospitalized at Y medical center and the experimental and control groups consisted of 31 subjects. The experimental group received nursing intervention at the mutual goal setting of 5 times from the day before the surgery to the 5th day after the surgery, while the control group received only routine nursing care. Recovery indicators of both groups were measured and compared. Measurement variables included patients' characteristics, health locus of control, forced vital capacity, forced expiratory volume in one second, peak expiratory flow, bowel movement recovery, mobility recovery, level of pain, patients' stress and patients' satisfaction. Data were analyzed using SPSS statistical package and the hypotheses were tested by ANOVA and ANCOVA. Results of the analyses are summarized as follows : 1) Internal health locus of control had higher effects of the nursing intervention of mutual goal setting than external health locus of control on pulmonary ventilatory functions of forced vital capacity, forced expiratory volume in one second, and peak expiratory flow. 2) There was no statistically significant difference in the effects of nursing intervention of mutual goal setting on the bowel movement recovery between the internal and external health locus of control. 3) There was no statistically significant difference in the effects of nursing intervention of mutual goal setting on the mobility recovery between the internal and external health locus of control. 4) There was no statistically significant difference in the effects of nursing intervention of mutual goal setting on the level of pain between the internal and external health locus of control. 5) There was no statistically significant difference in the effects of nursing intervention of mutual goal setting on the level of stress between the internal and external health locus of control. 6) There was a statistically significant difference in the effects of nursing intervention of mutual goal setting on the level of satisfaction with provision of nursing information between the internal and external health locus of control, and there was no statistically significant difference in the effects of nursing intervention of mutual goal setting on the level of satisfaction with outcome of nursing between the internal and external locus of control. On the basis of the research results, the following are recommended : 1) Repeated research on responses to health locus of control is necessary. 2) Not only the effectiveness of nursing intervention in acute recovery periods, but also the long term effects are to be investigated. 3) The development of instruments is needed to accurately measure mutual goal setting regarding postoperative deep breath, coughing, early ambulation, etc. so that the relationship among the postoperative recovery indicators may be explored. 4) It is required that an instrument be developed to measure perception which facilitates goal attainment in the interactive setting between patients and nurses.

  • PDF

Tunnel Reverse Engineering Using Terrestrial LiDAR (지상LiDAR를 이용한 터널의 Reverse Engineering)

  • Cho, Hyung Sig;Sohn, Hong Gyoo;Kim, Jong Suk;Lee, Suk Kun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.931-936
    • /
    • 2008
  • Surveying by using terrestrial LiDAR(Light Detection And Ranging) is more rapid than by using total station which enables tunnel section profile surveying to be done in suitable time and minimize centerline error, occurrence of overcut and undercut. Therefore, utilization of terrestrial LiDAR has increased more and more in section profile survey and measurement field Moreover, studies of terrestrial LiDAR for accurate and efficient utilization is now ongoing vigorously. Average end area formula, which was generally used to calculate overcut and undercut, was compared with existing methods such as total station survey and photogrammetry. However, there are no criteria of spacing distance for calculating overcut and undercut through terrestrial LiDAR surveying which can acquire 3D information of whole tunnel. This research performed reverse engineering to decide optimal spacing distance when surveying tunnel section profile by comparing whole tunnel volume and tunnel volume in difference spacing distance. This result was utilized to produce CAD drawing for the test tunnel site where there is no design drawings. In addition to this, efficiency of LiDAR and accuracy of CAD drawing was compared with targetless total station surveying of tunnel section profile. Finally, error analysis of target coordinate's accuracy and incidence angle was done in order to verify the accuracy of terrestrial LiDAR technology.

A Study on Mechanical Characteristics of Fiber Modified Emulsified Asphalt Mixture as Environmentally-Friend Paving Material (섬유보강 친환경 상온아스팔트 혼합물의 역학적 특성에 관한 연구)

  • Rhee Suk-Keun;Park Kyung-Won
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.23-30
    • /
    • 2006
  • Emulsified Asphalt Mixture(EAM) is more environmentally-friendly and cost-effective than typical Hot Mix Asphalt (HMA) because EAM does not produce carcinogenic substances, e.g., naphtha, kerosene, during the both of manufacturing and roadway construction process. Also, it does not require heating the aggregates and asphalt binder. However, EAM has some disadvantages. Generally EAM has a less load bearing capacity and more moisture susceptibility than conventional HMA. The study evaluated a Fiber modified EAM (FEAM) to increase load bearing capacity and to decrease moisture susceptibility of EAM. Modified Marshall mix design was developed to find Optimum Emulsion Contents (OEC), Optimum Water Contents (OWC), and Optimum Fiber Contents (OFC). A series of test were performed on the fabricated specimen with OBC, OWC, and OFC. Tests include Marshall Stability, Indirect Tensile Strength, and Resilient modulus test. Comparison analyses were performed among EAM, Fiber modified EAM (FEAM), and typical HMA to verify the applicability of EAM and FEAM in the field. Test results indicated that both of EAM and FEAM have an enough capability to resist medium traffic volume based on the Marshall mix design criteria. Also the study found that fiber modification is effective to increase the load bearing capacity and moisture damage resistance of EAM.

  • PDF

Estimating an Optimal Scale of a Railway Station with Non-Passengers (철도 비승차 이용객을 고려한 역사 시설물별 적정규모 산정방안)

  • Oh, Tae ho;Lee, Seon ha;Kang, Hee up;Insigne, Maria Sharlene L.;Lee, Sang Jae
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.4
    • /
    • pp.76-91
    • /
    • 2017
  • The Area of a domestic railway station is designed based on the 4-step traffic demand forecasting model with the average daily passenger count as one of its parameter. However, nowadays, due to increasing rate of railway station's function, the non-passengers are increasing. In order to consider those non-passengers who aren't using trains, assumed volume are added to the average daily passenger count of station to estimate the area, but the criteria being applied has no concrete basis. Therefore, this study aimed to recalculate the increasing non-passenger rate based on actual survey data of station users in any type of railway station to obtain the optimum area. Subsequently, the the design area was performed through pedestrian simulation. According to the result of the simulation, it was found that the total space of the exciting railway stations can be reduced up to 45% and will still satisfy the level of service(LOS) requirement.

Explosion Characteristics Analysis of Low-Density Polyethylene Dust (저밀도 폴리에틸렌 분진의 폭발특성 분석)

  • Hyun-gil Kwon;Kyeong-seok Oh;Jong-bae Baek;Dong-hyun Seo
    • Korean Chemical Engineering Research
    • /
    • v.61 no.1
    • /
    • pp.80-88
    • /
    • 2023
  • Ensuring safety in the designing of manufacturing and handling facilities for low-density polyethylene (LDPE) is difficult because there are no standards for the dust explosion characteristics of LDPE. In this study, a dust explosion test was performed on two dust samples collected from a bag filter (LDPE 1) during the LDPE manufacturing process and sedimentary dust (LDPE 2) leaked outside a facility such as a silo, and the LDPE 2 explosion test results were summarized. Particle size analysis showed that the volume-based particle diameter (median) was 95.04 ㎛ and the number density was 0-1 ㎛. The maximum explosion pressure (Pmax) was 6.6 bar, and the maximum rate of explosion pressure rise was 366 [bar/s] at 1500 g/m3. Accordingly, the dust explosion index (Kst) was 99.4 bar·m/s, which was confirmed as ST-1 grade. Moreover, the minimum ignition energy and minimum ignition temperature was 10 mJ and 450 ℃, respectively. Currently, manufacturing and handling design is based on the characteristic values of high-density polyethylene (HDPE). However, as the test results show that LDPE 2 dust has a higher risk than HDPE (particle diameter 61.6 ㎛), caution is required when using the HDPE design criteria in the LDPE manufacturing process.

A Study on The Enhancement of Aviation Safety in Airport Planning & Construction from a Legal Perspective (공항개발계획과 사업에서의 항공안전성 제고에 대한 법률적 소고)

  • Kim, Tae-Han
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.27 no.2
    • /
    • pp.67-106
    • /
    • 2012
  • Today air traffic at the airport is complicated including a significant increase in the volume of air transport, so aviation accidents are constantly occurring. Therefore, we should newly recognize importance of the Air Traffic Safety, the core values of the Air Traffic. The location of airport that is the basic infrastructure of the air traffic and the security of safety for facilities and equipments are more important than what you can. From this dimension, I analyze the step-by-step safety factors that are taken into account in the airport development projects from the construction or improvement of the airport within the current laws and institutions and give my opinion on the enhancement of safety in the design and construction of airport. The safety of air traffic, as well as airport, depends on location, development, design, construction, inspection and management of the airport including airport facilities because we have to carry out the national responsibility that prevents the risk of large social overhead capital for many and unspecified persons in modern society through legislation regarding intervention of specialists and locational criteria for aviation safety from the planning stage of airport development. In addition, well-defined installation standards of airports and air navigation facilities, the key points of the airport development phase, can ensure the safety of the airport and airport facilities. Of course, the installation standards of airport and air navigation facilities are based on the global standard due to the nature of air traffic. However, to prevent the chaos for the safety standards in design, construction, inspection of them and to ensure the aviation safety, the safety standards must be further subdivided in the course of domestic legislation. The criteria for installation of the Air Navigation facilities is regulated most specifically. However, to ensure the safety of the operation for Air Navigation Facilities, performance system proved suitable for the Safety of Air Navigation Facilities must change over from arbitrary restrictions to mandatory restrictions and be applied for foreign producers as well as domestic producers. Of course, negligence of pilots and defective aircraft maintenance lead to a large portion of the aviation accidents. However, I think that air traffic accidents can be reduced if the airport or airport facility is perfect enough to ensure the safety. Therefore, legal and institutional supplement to prioritize the aviation safety from the stage of airport development may be necessary.

  • PDF

Analysis of the Physical Properties of Ground before and after Low Flowing Grouting (저유동성 그라우팅 시공전후 지반의 물성변화 분석)

  • Seo, Seok-Hyun;Lee, Jung-Sang;Kang, Won-Dong;Jung, Euiyoup
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.4
    • /
    • pp.115-127
    • /
    • 2019
  • The low-flow grouting injection technique, the target construction method for this study, is a method of pouring mortar into the ground by non-emission replacement principle, which can be expected to increase the density of the ground, and, in some cases, be used as a base file using the strength of the high injection solids, along with low noise, low pollution, and high durability. To verify that the dynamic characteristics of the ground are improved by the low-flow injection technique, the test work was conducted on the site and physical tests were performed, and the quality of the improvement formed in the ground was verified through the indoor test on the core and core recovery rate was analyzed. The density logs test layer calculated the volume density of the ground layer by using the Compton scattering of gamma-rays, and the sonic logs was tested on the ground around the drill hole using a detector consisting of sonar and receiver devices inside the drill hole. As a result of the measurement of the change in physical properties (density and sonic logs) before and after grouting, both properties were basically increased after infusion of grout agent. However, the variation in density increase was greater than the increase in speed after grouting, and the ground density measurement method was thought to be effective in measuring the fill effect of the filler. Strength and core recovery rates were measured from specimens taken after the age of 28 days, and the results of the test results of the diffusion and strength test of the improved products were verified to satisfy the design criteria, thereby satisfying the seismic performance reinforcement.

A Study on Regulation Improvement of Local Ventilation System (국소배기장치의 규제개선에 관한 연구)

  • kim, Nam Suk;Kim, Young Suk;Woo, In Sung
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.3
    • /
    • pp.74-83
    • /
    • 2018
  • Anyone who wants to install local ventilation system must obtain a permission from the Ministry of Employment and Labor even if he has permission from the Ministry of Environment. This is because not only the Atmospheric Environmental Protection Act, but also the manufacturing industry's hazardous risk prevention plan under Article 48 Clause 2 of the Industrial Safety and Health Act is to be submitted by 15 days before the construction. Under the current Environmental Protection Act, the Ministry of Environment regulates only the emission of pollutants from local exhaust ventilation systems into the atmosphere and the contents of workers' safety and health within industrial sites are managed by the Ministry of Employment and Labor. Even with the approval of the Ministry of Environment, the number of unsuccessful cases by the Ministry of Employment and Labor has increased, causing a growing discontent among the sites due to production delays and additional costs of improvement. In addition, local exhaust systems that are at greater risk of fire explosion have increased the risk of severe industrial accidents due to fire explosion. This is due to insufficient design of air volume, control speed, return speed, duct size, and risk of fire explosion. This is because the criteria and procedures for approval of local exhaust ventilation systems are similar, but the Industrial Safety and Health Act adds additional screening items for safety and safety of workers and fire and explosion. In this study, the Environment Ministry and the Employment and Labor Ministry seek to find a reasonable way to operate the system by comparing local exhaust ventilation system installation approval standards.

How to Reflect Sustainable Development in Overseas Investment including Equator Principles (해외투자(海外投資)와 지속가능발전 원칙 - 적도원칙(赤道原則)(Equator Principles)을 중심으로 -)

  • Park, Whon-Il
    • 한국무역상무학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.45-72
    • /
    • 2006
  • The Equator Principles are a set of voluntary environmental and social guidelines for ethical project finance. These principles commit banks and other signatories to not finance projects that fail to meet these guidelines. The principles were conceived in 2002 on an initiative of the International Finance Corporation and launched in 2003. Since then, dozens of major banks have adopted the Principles, and with these banks among them accounting for more than three quarters of all project loan market volume the Principles have become the de facto standard for all banks and investors on how to deal with potential social and environmental effects of projects to be financed. While regarding the Principles an important initiative, NGOs have criticised the Principles for not producing real changes in financing activities and for allowing projects to go through that should have been screened out by the Principles, such as the Sakhalin-II oil and gas project in Russia. In early 2006, a process of revision of the principles was begun. The Equator Principles state that endorsing banks will only provide loans directly to projects under the following circumstances: - The risk of the project is categorized in accordance with internal guidelines based upon the environmental and social screening criteria of the International Finance Corporation (IFC). - For all medium or high risk projects (Category A and B projects), sponsors complete an Environmental Assessment, the preparation of which must meet certain requirements and satisfactorily address key environmental and social issues. - The Environmental Assessment report addresses baseline environmental and social conditions, requirements under host country laws and regulations, applicable international treaties and agreements, sustainable development and use of renewable natural resources, protection of human health, cultural properties, and biodiversity, including endangered species and sensitive ecosystems, use of dangerous substances, major hazards, occupational health and safety, fire prevention and life safety, socio-economic impacts, land acquisition and land use, involuntary resettlement, impacts on indigenous peoples and communities, cumulative impacts of existing projects, the proposed project, and anticipated future projects, participation of affected parties in the design, review and implementation of the project, consideration of feasible environmentally and socially preferable alternatives, efficient production, delivery and use of energy, pollution prevention and waste minimization, pollution controls (liquid effluents and air emissions) and solid and chemical waste management. - Based on the Environmental Assessment, Equator banks then make agreements with their clients on how they mitigate, monitor and manage those risks through an 'Environmental Management Plan'. Compliance with the plan is required in the covenant. If the borrower doesn't comply with the agreed terms, the bank will take corrective action, which if unsuccessful, could ultimately result in the bank canceling the loan and demanding immediate repayment. - For risky projects, the borrower consults with stakeholders (NGO's and project affected groups) and provides them with information on the risks of the project. - If necessary, an expert is consulted. The Principles only apply to projects over 50 million US dollars, which, according to the Equator Principles website, represent 97% of the total market. In early 2006, the financial institutions behind the Principles launched stakeholder consultations and negotiations aimed at revising the principles. The draft revised principles were met with criticism from NGO stakeholders, who in a joint position paper argued that the draft fails by ignoring the most serious critiques of the principles: a lack of consistent and rigorous implementation.

  • PDF

Review of the installable area of multi-utility tunnel using feasibility assessment indexes (타당성 평가지표를 활용한 터널식 공동구 설치가능지역 검토)

  • Oh, Won-Joon.;Jin, Kyu-Nam.;Na, Gwi-Tae.;Cho, Choong-Yeun.;Sim, Young-Jong.
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.6
    • /
    • pp.795-810
    • /
    • 2019
  • In this paper, The study was conducted on the method to roughly determine the area and length of the multi-utility tunnel before the planning and design phase of the multi-utility tunnel construction. For this purpose, four feasibility indexes were used: traffic density, population density, disaster prevention index (number of workers), and urbanization rate, which reflect the regional characteristics. The installation criteria were set in consideration of the average value and minimum value of the feasibility indexes for the tunnel type among areas that can be installed in the multi-utility tunnel of Seoul. The analysis area included 200 areas based on 14 zones. The results of the analysis based on the minimum value of feasibility indexes indicated that the tunnel type of multi-utility tunnel is suitable for 39 areas with high traffic volume and population. On the other hand, the 'gun' area, etc., has a wider population than the 'si' and 'gu', suggesting that it is not suitable to install multi-utility tunnel. In addition, it can be seen that the larger the index value centered on the minimum value of each index, the smaller the tunnel type of multi-utility tunnel installation area.