International conference on construction engineering and project management
/
2020.12a
/
pp.371-380
/
2020
With the 4th industrial revolution, many advanced information technologies are being applied to the area of construction engineering and project management. These applications are usually focusing on design, construction and operation stage and are producing many meaningful fruits. Even though these studies are very important for the development of the construction industry, this study insists that the other stage perspective such as construction business also should be emphasized. Because business phase has significant impacts on the success of a construction project as well as design, construction and operation phase. So, this study reviewed the intelligent-approach papers in planning and marketing, estimation and bid, contract and claim, and project financing fields. This study provides some insights such as values, difficulties, limitations and future directions of business intelligence application.
Journal of The Korean Digital Architecture Interior Association
/
v.10
no.3
/
pp.19-28
/
2010
The construction projects are recently having changes in their magnitude and complexity. Therefore, the amount of information created and managed by participants over project phases is enormous and this may cause difficulties in consistent and integrated data management. Because of the change in construction projects, there is a need to apply more logical and systematic ways to deal integrated data management. For the solution to this, BIM(Building Information Modeling), a new paradigm for integrated management of the information over project life-cycle, has been seriously considered. Also, the Korean Public Procurement Service announced that project over 50 billion Korean Won should introduce BIM into procurement starting from 2012. However, the studies and development have lack on studies of applying BIM and managing the data made using BIM in pre-design and maintenance stage. In pre-design stage, the concept of schematic design model is made to support for making major decisions concerning the size, shape and cost of the project. To decide the cost for the building in this stage by making use of BIM, estimating the amount of building materials used for constructing should be preceded. In this study, the pre-design BIM is explained to gain a better understanding of its process, since this paper focused on space programming stage. Finally, the paper suggests the concept process of estimating the amount of materials in building interior finishing from selecting the type for the elements of each space made to support the client for making decisions in space programming stage based on pre-design BIM.
Journal of the Korean Institute of Educational Facilities
/
v.24
no.3
/
pp.3-13
/
2017
This study has developed a design indicator required to promote green remodeling in school facilities. And, implemented the green remodeling pilot test on the school facilities that are planning actual remodeling. This pilot test suggested user participation design methodology such as verification of the developed design indicator, design goal setting, evaluation and adjustment of design proposal. The Green Remodeling Design Indicators were classified into 3 large categories of architectural performance, usability, and design through analysis of cases related to 'green buildings' and 'remodeling'. We have developed nine middle categories such as architectural and structural performance, facility performance, environmentally-friendly, circulation, space, amenity, harmony with surroundings, form and symbolization. In addition, 42 detailed indicators were developed for each category, including general, functional, and special indicators. For the verification of this study, two green remodeling design workshops were conducted for Gwangju J elementary school. The first design workshop presented the importance of the design indicator and set the goal of the design plan of green remodeling for project. And, the second Workshop presented the evaluation of the satisfaction with the design and the direction of future adjustment for project. The design indicator developed in this study can be utilized as a design indicator of design quality management and decision system for the school green remodeling in the future. In addition, by accumulating information on the Green Remodeling Project, it is necessary to spread green remodeling and construct a sustainable building environment.
Journal of The Korea Institute of Healthcare Architecture
/
v.21
no.3
/
pp.47-55
/
2015
Purpose: While medical standard is rapidly improved, welfare of users and employees in hospitals is not treated correspondingly. Intercommunication of hospital users is thought to be very important for their welfare, and provision of conversation spaces within hospital environment needs to be expanded by architectural design. Space organization methods for the design of conversation space is to be embellished. Methods: Literature and hospital designs are analysed in order to develop the basis of argumentation for the hospital conversation space. 15 hospitals are reviewed and designed spaces for the intercommunication of the users are examined, Space organization efforts and design experiments are identified, and 6 organizational methods are proposed such as: 1) reducing territoriality 2) flowing space 3) categorizing and separating spaces 4) height variation 5) contact with outside and 6) Sun-lighted space. Results: 6 organization methods are confirmed in precedent hospital cases, and these proposed methods are applied in a new hospital design project to verify their usefulness. Implications: A hospital design project is presented based on these proposed methods of organization for the conversation space. Outcomes of this study can be applied for the formulation of human intercommunication spaces in other facilities.
Sustainable housing design can contribute to dramatically reduced energy usage and can be applied to all new building projects. This paper explores the potential in Korea of applying available energy efficient building technologies. The objective was to determine the degree of energy reduction that can easily be achieved in new building design. The pilot project is providing some prototypes with display units which incorporate principles of sustainable design and performance utilizing the eco-design objectives. This building challenges ingrained preconceptions about system designs for four energy saving levels(40%, 60%, 80% and zero energy) and exposes barriers to low energy buildings posed by new standards and guidelines.
STEAM education is an effective teaching method to develop self-problem-solving skills through creative thinking. In order to revitalize STEAM education, various program models are being developed recently. The purpose of this study is to develop a STEAM education program based on the project-based learing method that includes the process of solving global environmental problems. The STEAM element was extracted by linking the zero energy house design with the middle school curriculum, and the STEAM education program was developed considering career activities. It was analyzed whether the developed program can improve STEAM core competence and job preparation ability. The education program was conducted for middle school students and the program was evaluated through questionnaires. In order to strengthen the STEAM competency, project-based learning method was applied and it was able to enhance the active problem solving ability of learners. In addition, opportunities for career experience could be provided through career exploration programs and various activities. Through this STEAM education program, it is expected to contribute to cultivating human resources with convergence knowledge and core competency.
International conference on construction engineering and project management
/
2017.10a
/
pp.153-158
/
2017
Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.
International conference on construction engineering and project management
/
2011.02a
/
pp.426-431
/
2011
The quality of performance evaluation on engineering consultants that provide design-related technical services is difficult to be measured, and only a handful of papers discussed the quality during the design stage. Although design cost is relatively far less than construction cost for a project, the decisions made in the design phase have a significant impact on the final products of the project, especially for large public construction projects. Therefore, this research focuses on reviewing and then establishing a performance evaluation framework for the consulting firms that execute detailed design and provide technical services for the Taipei Rapid Transit Systems (TRTS). By interviewing experts, this study first established a set of indicators to evaluate these firms' performance. Then, those indicators were incorporated into the four aspects of balanced scorecard (BSC) to establish the architecture of the evaluation mechanism. The weight of each indicator was calculated by analytic hierarchy process (AHP) from a survey conducted among experts. The results showed that the top-three indicators were quantity take-off, functions conformity, and budgeting. The framework of performance evaluation established by this study can be applied to measure service performance during the design stage. It not only facilitates the monitoring of consulting firms, but also helps to reduce unnecessary change orders and disputes during the construction stage.
Magazine of the Korean Society of Agricultural Engineers
/
v.13
no.4
/
pp.2471-2478
/
1971
Go Cong Water Control Project was conducted on its preliminary survey and design by Agricultural development Corporation for the Korean Government, an Executing Agency, and Directorate of Irrigation and Rural Engineering of the Ministry of Land Reform, Agriculture and Fishery Development for the Vietnamese Government, a cooperation Agency, under Korean and Vietnamese Economic and Technical Cooperation Program. The main purposes of the project are aimed at the improvements of irrigation and drainage, and salt water prevention of the Go Cong area located at northern part of the Mekong Delta. All the works from field survey through design to preparing reports were carried out by ADC alone and recently Korean Government submitted the relevant reports to vietnamese Government through official channel. The contents of the project are summarized as following: 1. The project comprises irrigation, drainage and salt water prevention facilities on the benefited area of about 55,000 hectares, covering Go Cong and Dinh Tuong(My Tho) Provinces and it will be possible to cultivate rice cropping twice a year, irrigating all the area in the dry season; 2. With completion of this project, annual production of rough rice and vegetables are anticipated to increase by 222,600 .T. and 142,600 M.T. respectively and the internal rateof return stants at 26 per cent, applying for the exchange rate of US $ 1 to VN $ 275. 3. Total investments required for the project are estimated at US $ 56,394,000 of which actual construction cost is estimated at US $ 39,183,000. The project has planned to be d to be developed by four stages, taking bout 7 years. 4. The project needs for three places of pumping plants. 57Km of feed and main irrigation canals, 81Km of drainage channels, 97Km of dike, 23 places of sluices and navigation locks, etc.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.