INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM

  • Yuan Jianbo;Liu Weijun;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.796-801
    • /
    • 2005
  • Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..

  • PDF

Architectural Design Process by the Changes of Sustainable Design Guidelines of Public Project (공공프로젝트 친환경 설계지침의 변화에 따른 건축설계프로세스 연구)

  • Tae, Yeong-Ran
    • Journal of the Korean Solar Energy Society
    • /
    • v.30 no.4
    • /
    • pp.63-70
    • /
    • 2010
  • This study introduce a architectural design process by the changes of sustainable design guidelines in public project. First of all, this study examines existing integrated design process studies performed by Rhee & U.B.C. Also, this study examines sustainable guidelines which demanded by public building projects. Then, this study introduces sustainable design process using existing sustainable design process, and shows that how to operate and proceed integrated design to satisfy the sustainable guidelines in practice. The results of this study are as follows. (1) Since 2007, sustainable design guidelines of bidding projects have been highlighted. (2) In public buildings, energy saving is very important issue. Especially energy certification demands 1st degree(under $300kWh/m^2{\cdot}yr$). (3) Inp ractice, integrated design team performed sustainable design using the sustainable design process to improve sustainable in public buildings.

A Study on Evaluation Criteria of Design Project though a Case Study of Introduction to Engineering Design Course (공학설계입문 운영사례를 통한 설계과제 평가기준 탐색)

  • Ryu, Kyung-Hyun
    • Journal of Engineering Education Research
    • /
    • v.14 no.6
    • /
    • pp.31-40
    • /
    • 2011
  • This paper explores and proposes the evaluation criteria of design projects in the entry-level design course. In the entry-level engineering design course the students proceeds various design projects to understand the concept of engineering design process and to develop the creativity. The evaluation criteria of design projects is very important component because the outcome of students in the engineering design course are effected from the evaluation criteria that enforces the students to focus on doing their task. According to this case study the evaluation criteria can be good solution to evaluate the design projects. By the outcome standard of ABEEK on the entry-level engineering design course the evaluation criteria was selected with the results of design projects such as design plan, report, handicrafts, objectives.

A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage - (설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 -)

  • Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

An Application of Value Engineering to Design-Build Projects at Design Development Phase (설계${\cdot}$시공일괄 사업의 실시설계단계 VE적용 방안에 관한 연구)

  • Jung Jae-Jin;Kim Jae-Hyun;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.294-298
    • /
    • 2003
  • Recently, Design-build project as delivery system public construction sector tends to be increased according to the Masterplan for promotion of construction technologies, and construction projects are increasing their complexity, variety and scale. And owner's requirements become various. Preliminary design for design eligibility judging of design-build has been designed excessively to get a good point and this tendency includes the elements which is capable of wasting the budget. Because of excessive design, owners require to apply VE study into the design development phase but in the Design-build system, VE application has not been of no effect that owners expect, owing to the characters of lum-sum contracts. The purpose of this study is to propose the plan for effective application of VE in the design development phase in order to solve the problems such as excessive design of preliminary design in the design-build project. This study established plans for VE application through investigating and analyzing VE application case and then proposed the applications in the aspect of regulations and contracts, parties participated in project, VE operation through research for verification of usefulness.

  • PDF

A Case Study of Complex-Cultural-Space Development by Importing the PM (PM이 적용된 복합문화공간 개발사례 연구)

  • Ma, Eun-Joo;Park, Boo-Mee
    • Archives of design research
    • /
    • v.19 no.5 s.67
    • /
    • pp.281-292
    • /
    • 2006
  • Modern cities' paradigm is rapidly changing to evolve into multi-functional spaces including living space, culture, welfare and environment. Therefore, upon these changing needs, the cultural images and the quality control became major issues in this area. This thesis will examine cultural contents development, a successful case-study, and the analysis of complex space development plan. Thereby each development case in cultural contents area will be extracted and it will seek to find out how they could make a complex cultural space. Moreover, the role and boundary of each Project Management case and Project Manager will be analyzed. The analysis showcases the importance of comprehensive and systematic management system. As a result, along with the recognition of the strong ground for Project Management and Project Manager, comprehensive planand the most effective management system for various complex cultural space development plans would be PM application which is expected to be new alternatives to improve complex space development quality.

  • PDF

Design and Implementation of Web-based Information Reporting System for Group Project Management (그룹프로젝트관리 지원을 위한 웹기반 정보보고시스템의 설계 및 구현)

  • Kim, Myong-Ok;Park, Eun-Byul
    • The Journal of Society for e-Business Studies
    • /
    • v.15 no.4
    • /
    • pp.245-263
    • /
    • 2010
  • Today, large enterprises are changing their team organization to group organization. These trends have brought work flexibility of project and manpower usage. However, communication among group members has become more complicated, and it has been found that ERP was not efficient enough to solve this communication problem. The main purpose of this study was to design a quick and systematic communication system for group project management, and Web-based Information Reporting System (hence forth WIRS) has been proposed. The main topics covered in this paper are design of functions and system architecture, process model design, database design, and implementation of the prototype. Focus group interview was conducted and user feedback was positive about main functions for WIRS and its overall impact on the enhancement of productivity.

A Possibility for Multilateral CDM Projects in Northeast Asia - The reduction effect in transaction cost by Korean participation - (동북아시아지역의 다국 간 CDM프로젝트에 대한 검토 -한국 참가에 따른 거래비용 삭감효과-)

  • Jung, Woo-Jong;Nakano, Satoshi
    • Journal of Environmental Policy
    • /
    • v.2 no.2
    • /
    • pp.41-63
    • /
    • 2003
  • CDM(Clean Development Mechanism) project is said to be a mechanism, which profits both the investing country and the host country, while additionally contributing to the reduction of greenhouse gases of the earth as a whole. However in reality, most of the proposed projects do not end up in agreement because of the problems related to differences in recognition between the investing country and the host country of the CDM project. This outlines the background for this research which proposes a new design of institutional arrangements of CDM projects in the Northeast Asian region, mainly Japan, China and Korea. In addition, we investigate the feasibility of the proposed design. The research firstly focuses on the reduction in transaction costs that the participation of Korea will have on a Japan-China CDM project. This paper further emphasizes the potential gains that would materialize if a CDM project involved the whole Northeast Asian region, and not only one country. Our research suggests that an approximate reduction of 23% in transaction costs, and about 4% reduction in the total costs of a CDM project can be expected to follow the Korean participation. In addition to decreasing costs we find that a Korean involvement in a CDM project with Japan will lead to efficiency gains illustrated by a higher increase in the IRR(Internal rate of return) in a Japan-Korea project(11.45% to 12.21%) compared to an IRR incresement of 10.57% to 11.27% for a pure Japanese CDM project. Similar results of a rise in the IRR is found for the whole investment period of 20 years. We can hence conclude that Korean participation in a Japan-China CDM project would improve the implementation possibilities of CDM project in the Northeast Asia region.

  • PDF