• Title/Summary/Keyword: Design project

Search Result 4,019, Processing Time 0.036 seconds

Feasibility Study for the Ghana-Mali 225kV Interconnection Project (서부아프리카 국가간 연계 송전망 타당성 조사)

  • Kim, Jong-Hwa;Lee, Chul-Hyu;Lee, Young-Gil;Choi, Sang-Ju
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.38-39
    • /
    • 2008
  • KEPCO conducted the project called the "Feasibility Study for the Han (Ghana) - Bobo Dioulasso (Burkina Faso) - Bamako (Mali) Interconnection Project" as its first African project. This paper deals with power system analysis and Transmission line and substation design of approximately 750 kilometers of the 225 kV single circuit transmission lines and six substations. The main contents of the power system analysis results and preliminary engineering design include power flow, transient stability, eigenvalue analysis, transmission line design, substation design and economic analysis.

  • PDF

Byker Redevelopment : Ralph Earskine' Design Concept and Residence′ Participation on the Design Process (바이커 재개발 : R. Earskine의 설계개념과 주민참여)

  • 손승광
    • Journal of the Korean housing association
    • /
    • v.14 no.6
    • /
    • pp.173-184
    • /
    • 2003
  • To be a good architecture, resident' needs should be defined as possible as definitely. A Multi-family housing is not easy to define of resident' needs, because the user is ambiguous and the needs is multi aspects. Byker housing project have a good approach to define ambiguous and many aspects of residence' need. In this view points, Byker redvelopment project show the process of resident' participation as a new customers, and design process architect with people, in spite of the early 1970s' project in terms of the user participations. This approach of residence participation is a good lesson how to communicate with recidence, how to identify the need, and its design is satisfied in the residence. And its project are discussed with residence how to manage of rehabilitation.

TAGUCHI OPTIMIZATION OF DISPLACEMENTS DURING THE DESIGN PHASE OF A CONSTRUCTION PROJECT

  • E.S. N. Telis;G. J. Besseris
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.721-728
    • /
    • 2007
  • The prediction of quality characteristics during the design phase of a construction project was fragmented, because no particular method exists. One of the most important key responses is the total displacements (horizontal and vertical). A brainstorming session produces the quality parameters i.e. the control factors which here are identified as: the steel joint, the pile's length, the excavation depth and angle, the distance between the piles, the anchor stretch and length to name just some of the most engaging in the design. The purpose of this study is to optimise these parameters to minimize the total displacements following a methodology based on Taguchi method. For this reason, a 2-level, L8 orthogonal array has been employed to organize the experimentation. Data is obtained from a real-life excavation project designed on the Plaxis v.8 CAE package. Taguchi analysis is performed in the statistical package Minitab.

  • PDF

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

A Study on the Change of Learning Satisfaction and Comprehension of Team Project Instruction Using Creative Capstone Design (창의적 캡스톤 디자인을 활용한 팀 프로젝트수업 운영에 따른 학습만족도 및 이해도 변화에 관한 연구)

  • Kim, Changhee
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.13 no.4
    • /
    • pp.179-191
    • /
    • 2017
  • The purpose of this study is to investigate the change of comprehension degree about learning satisfaction and capstone class by applying the subject which draws idea for team project task in college to creative capstone design program. The Capstone Design Program is designed to train fieldworkers with creative problem solving skills and is widely applied as a problem-solving course in team-based projects. In this paper, based on the case study of the 'fusion capstone design' operated in the first semester of 2015 ~ 2017, the capstone design course was established in the course of designing ideas for problem solving. The results of this study are as follows: First, the questionnaire about capstone design instruction process, instruction method, and learning achievement satisfaction were analyzed. As a result, understanding of capstone design was found to be higher than that of class before class, and satisfaction of performance course, method of teaching performance and learning outcome were obtained.

Comparison Analysis of BIM Level in the Domestic and Overseas BIM Projects - Focused on BIM Journals and Award Winning Projects - (국내·외 BIM 적용 프로젝트의 BIM 적용수준 비교분석 - BIM 저널 및 Awards 수상작 사례를 중심으로 -)

  • Koh, Sung-Hoon;Ham, Nam-Hyuk;Lee, Joo-Sung;Yoon, Su-Won;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.25-35
    • /
    • 2017
  • Building information modeling (BIM) can improve to communicate with project participants by early construction involvement (ECI) from the beginning of the project. Therefore, they can minimize design changes and improve design quality and construction. However, because there is insufficient research on the scope and application level of BIM according to project delivery system and project characteristics, construction companies have efficiently not been using the BIM. Therefore, this study intends to conduct basic research as a basis for confirming appropriate BIM application and level according to project delivery system and project characteristics. To do this, we investigated the project delivery system and project characteristics of domestic and foreign projects that have successfully applied BIM, and compare and analyze them based on BIM application and BIM level framework derived from theory reviews and experts. Therefore, this study can be used as a basis for strategically establishing the scope and level of BIM according to project delivery system and project characteristics through the result of this study.

Operation System of Capstone Design Based on Continuous Industry Related Project (지속적인 기업체 연계 프로젝트 기반의 캡스톤 설계 운영시스템)

  • Kwon, Soon-Kak;Kim, Seong-Woo;Park, Yoo-Hyun
    • Journal of Engineering Education Research
    • /
    • v.16 no.3
    • /
    • pp.61-68
    • /
    • 2013
  • Capstone design course has been opened in order to improve students' practical project in undergraduate courses. This paper presents the efficient operation method for capstone design course. The proposed capstone design is operated such as outside outsourcing institute of industry, that is, the industry suggests the topics and fourth grade students work on this project during this year, and third grade students take over same project and proceed to improve in next year, so it is the continuous operating. Based on this system, industry can get the desired project outputs, and the university can give practical team project experience for students, so a mutual benefit between the industry and university can be possible. The proposed operating system is actually applied to the department of computer engineering, the questionnaire surveys are performed to participated students and corporate mentors, and then the operating results of the proposed system are analyzed.

Document Management for Jordan Research and Training Reactor Project by ANSIM (원자력 통합안전경영시스템을 이용한 요르단연구로사업의 문서관리)

  • Park, Kook-Nam;Choi, Min-Ho;Kwon, Yongse
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.2
    • /
    • pp.113-118
    • /
    • 2016
  • Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users' rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI's long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.

A Simple Interactive 3D Interior Design Application for Living Room - Cost Management

  • Winnie, Chin;Hui, Saw Seow;Gee, Yap Seok
    • Journal of Multimedia Information System
    • /
    • v.4 no.3
    • /
    • pp.157-162
    • /
    • 2017
  • The title of this project is "A Simple Interactive 3D Interior Design Application for Living Room - Cost Management", focusing on developing an application that enables costing and designing to be executed concurrently in interior design phases. This is because any changes made at costing phase after design phase is completed, it will potentially lead to unnecessary increase in cost and time. Therefore, the objective of this project is aimed to devise a cost management module to be included in the proposed application, allowing interior designer to make cost-based decision at the designing phase itself. This can be achieved through its proposed functions which include total cost update, budget management, cost estimator calculator and material list generation. The methodology being proposed in this project is Prototyping Development, categorized under Rapid Application Development (RAD), by starting off with planning, analysis, design and implementation phases are performed concurrently and repeatedly in a cycle to produce a prototype until the application is completed. In the end of this project, the developed prototype is expected to contribute a better solution towards cost management in interior design.