• Title/Summary/Keyword: Design project

Search Result 4,021, Processing Time 0.035 seconds

Technical considerations for engineering of crane pedestal operated in North-Western Australia Offshore (North-Western Australia 해상에 운용되는 Offshore Crane Pedestal 설계)

  • Song, Jun-Ho;Kim, Yong-Woon;LEE, Kyung-Seok;Kim, Man-Soo
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2015.09a
    • /
    • pp.34-40
    • /
    • 2015
  • The design, procurement and fabrication of FPSO project ordered by Inpex Browse, Ltd. have been currently carried out by DSME(Daewoo Shipbuilding Marine and Engineering Co.). The unit will be installed and operated in the Ichthys field offshore of North-Western Australia and there are the particular design requirements to do with performance on the environment loads corresponding to max. 10,000 years return period wave. Also, the operational life of FPSO has to be over 40 years. With this background, this paper introduces the structural design procedure of crane pedestal foundation operated in north-western Australia offshore. The design of crane pedestal foundation structure is basically based on international design code (i.e. API Spec. 2C), Classification society's rule and project specifications. The design load cases are mainly divided into the crane normal operating conditions and crane stowed conditions according to environment conditions of the offshore with 1-year, 5-year, 10-year, 200-year and 10,000-year return period wave. This design experience for crane pedestal foundation operated in north-western Australia offshore will be useful to do engineering of other offshore crane structures.

  • PDF

A Study on the Analysis of SE Process Implementation for the Light Rail Transit Project (경량전철사업의 시스템엔지니어링 적용 실태분석 연구)

  • Kim, Chul Whan;Han, Myeung-Duk;Lee, Jae Hong
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.2
    • /
    • pp.1-10
    • /
    • 2012
  • This paper aims to analyze the result of SE Process Implementation on Light Rail Transit(LRT) Project. Currently the Light Rail Transit Project of Korea applies SE to the intermediate phase, that is, E&M phase which is a manufacturing and designing procedure. More seriously, the application effect of SE is not remarkable because it applies to some specific engineering fields like RAMS and it depends on superficial consulting of foreign companies with low SE support capability and investment capital. This study points out that the "Requirement Analysis" and "System Alternative Review" has not been conducted from the initial phase (basic plan and basic design) of the LRT projects. Several projects indicate that the amount of investments for SE activities through the Korea LRT project is relatively very small in comparison with the global capital which is about 10% of total project budget. Furthermore, Korea LRT projects have very few SE professionals and weak SE organization with no government directions and guide book for the efficient implementation of SE for the LRT projects.

Reducing Earthquake Fatalities and Destructions in Iran: A Project Management Perception

  • Tabassi, Amin Akhavan;Bakar, Abu Hassan Abu;Yusof, Nor'Aini
    • Asian Journal of Business Environment
    • /
    • v.4 no.1
    • /
    • pp.25-35
    • /
    • 2014
  • Purpose - Appropriate project management knowledge as well as its effective application in the construction industry increase construction quality and, therefore, reduce fatalities and destruction. Research design, data, and methodology - This study was conducted through a comparative analysis of earthquake fatalities in Iran, Turkey, Pakistan, Indonesia, China, Haiti, Japan, and the United States of America. The data was analyzed using a frequency study. The analysis contrasts the fatalities of some of the strongest earthquakes around the world between 1960 and 2010. Results - Poor quality construction practices and a lack of effective application of project management knowledge play a major role in the vast destruction, high death toll, and dismal tragedies that are associated with earthquakes, especially in Iran. Conclusions - Despite the history of tragic earthquakes and their continuing recurrence, this study attempts to make governments, companies, and disaster management personnel aware of the dangers of poor quality construction and the deficient application of project management knowledge and, further, accentuates effective ways to prevent the probability of serious damage in future. This study contains valuable information on the effects of project management application towards reducing earthquake fatalities and destruction.

Electrical and Communication System Design for the Proton Accelerator Research Center (양성자가속기 연구센터 관련 전기 및 통신설비 설계)

  • Mun, Kyeong-Jun;Lee, Seok-Ki;Jeon, G.P.;Nam, Jung-Min;Jo, Jin-Sam;Kim, Jun-Yeon
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.343-344
    • /
    • 2008
  • 90년대에 들어서면서부터 미래원천기술 개발에 필요한 양성자원 및 중성자원의 중요성이 부각됨으로써, 이에 적합한 고에너지(수백 MeV${\sim}$수 GeV) 및 대전류(수십 mA)의 대형 양성자 가속기가 개발되어 반도체 생산, 의료장비 등 여러 분야에 널리 적용되고 있는 추세이다[1, 2]. 이에 양성자 사업단은 21세기 미래 원천기술을 개발하고 산업경쟁력을 제고하며 공공복지를 증진시킬 수 있는 양성자가속기를 개발하여, NT, BT, IT, ST등 중요 국가과학기술분야의 발전기반을 확충하기 위한 프론티어 사업목표로 하고 있으며 이에 부응할 수 있는 양성자 가속기 연구센터 건설계획을 설정하여 추진 중에 있다. 본 논문에서는 양성자가속기 연구센터 지원시설 건축설계의 일환으로 수행되고 있는 전기, 소방, 통신 및 방범설비 설계과정에서 각 설비설계시의 주요기능 및 특징에 관해 기술하고자 한다.

  • PDF

Design and application of project based mathematics learning on students' attitude toward mathematics and career awareness (수학에 대한 태도 및 진로인식 함양을 위한 프로젝트기반 수학수업 설계 및 적용)

  • Lee, Soo Hyun;Kim, Min Kyeong
    • Journal of the Korean School Mathematics Society
    • /
    • v.19 no.4
    • /
    • pp.329-356
    • /
    • 2016
  • The purpose of the study was to develop project based math learning using future prospective jobs to find out its effects on elementary school student's attitude toward mathematics and career awareness. Also, this study aims at implementation of this project based math learning program in school math education. The project based math learning using future prospective jobs was conducted through 19 lessons for 7 weeks. As a result, the project based math learning using prospective jobs is turned out to be effective on developing attitudes on mathematics and career awareness positively.

SRF LINAC FOR FUTURE EXTENSION OF THE PEFP

  • Kim, Han-Sung;Kwon, Hyeok-Jung;Seol, Kyung-Tae;Jang, Ji-Ho;Cho, Yong-Sub
    • Nuclear Engineering and Technology
    • /
    • v.46 no.2
    • /
    • pp.247-254
    • /
    • 2014
  • A study on the superconducting RF linac is underway in order to increase the beam energy up to 1 GeV by extending the Proton Engineering Frontier Project (PEFP) 100-MeV linac. The operating frequency of the PEFP superconducting linac (SCL) is 700 MHz, which is determined by the fact that the frequency of the existing normal conducting linac is 350 MHz. A preliminary study on the beam dynamics showed that two types of cavities with geometrical betas of 0.50 and 0.74 could cover the entire energy range from 100 MeV to 1 GeV. An inductive output tube (IOT) based RF system is under consideration as a high-power RF source for the SCL due to its low operating voltage and high efficiency. As a prototyping activity for a reduced beta cavity, a five-cell cavity with a geometrical beta of 0.42 was designed and fabricated. A vertical test of the prototype cavity at low temperatures was performed to check the performance of the cavity. The design study and the prototyping activity for the PEFP SCL will be presented in this paper.

Success Factors of Highway Construction Projects in Egypt: AHP Approach

  • El-Maaty, Ahmed Ebrahim Abu;El-Hamrawy, Saad;Akal, Ahmed Yousry
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.7-14
    • /
    • 2016
  • While the idea of the existence of a set of key factors for success in planning, designing and construction of projects is not new, it remains one of the most important issues in the field of construction management. This is due to project success factors are inputs to project management practice which can lead directly or indirectly to project success. This study identifies the success factors which can be used for improving the highway projects performance in Egypt during the project pre-construction and construction phases. Through a detailed literature review 35 success factors are identified. Furthermore, the AHP is adopted to prioritize the studied factors through the application of questionnaire survey. The study establishes that implementing an effective quality control and assurance systems, allow sufficient time for feasibility studies, design, drawing and tender preparation, effective cost control system and frequency of project budget updates, preparing adequate designs and drawings and determining sufficient time to implement the desired scope of work are the most important success factors for enhancing the highway projects performance in Egypt.

Benefits of Early Stakeholder Involvement in Korean Railway Infrastructure Project

  • KANG, SungWook;KIM, DongHee;YU, JaeKyun;LEE, KyungChul;MOON, DaeSup
    • The Journal of Economics, Marketing and Management
    • /
    • v.9 no.5
    • /
    • pp.15-25
    • /
    • 2021
  • Purpose: In the Korean railway infrastructure process, contractors and operators are involved at a later stage, which results in significant inefficiency. This study examines the benefits of early stakeholder involvement in Korean railway infrastructure projects and provides practical guidelines. Design, data and methodology: Literatures and foreign cases are analyzed. Building on the new product development model, we derive propositions explaining the relationship between early stakeholder involvement and the performance of Korean railway infrastructure project. Results: Major propositions include that early involvement of contractor has a positive effect on the project performance by shortening the infrastructure construction period and that early involvement of railway operator has a positive effect on the project performance by improving the effectiveness of railway infrastructure. Four requirements for the success of early stakeholder involvement are addressed. Conclusions: This study suggests that early stakeholder involvement shortens the construction period and improves railway infrastructure effectiveness. Academic contribution is to present the framework on railway infrastructure projects as holistic interactions among stakeholders. Practical contribution is to provide railway policy makers and other business practitioners with policy guidelines to improve railway infrastructure project process and to recommend an open access to relevant data.

Defining Functions for Integrated Information Management System of University Financial Support Project

  • Lee, Hae-Gun;Shin, Seong-Yoon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.10
    • /
    • pp.251-256
    • /
    • 2019
  • In this paper, we analyzed the business process and management characteristics of the university financial support project to define the function for the integrated information management system of the university financial support project. To this end, we reviewed the characteristic and business process of university financial support project and defined six common functions. In order to establish an integrated system applying the derived functions, the first things to be done need to standardize the business management system considering integration and to arrange the accounting regulations. Based on the functions and implications defined from this paper, we think that it will be helpful to design an integrated information management system for university financial support project.

A Study of the Policy Improvement for the Housing Area as the Urban Regeneration of New Deal Project (도시재생 뉴딜사업 주거지 재생을 위한 정책 개선 방안 연구)

  • You, Aram;Yoo, Hae-Yeon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.12
    • /
    • pp.55-64
    • /
    • 2018
  • The purpose of this study is to examine the status and limitations of the activation plan as a result of the change in urban regeneration paradigm. In particular, the change in housing life was considered following the guidelines of the New Deal project. Specifically, the three types - General Neighborhood, Housing Support, and DongneSaligi - were analyzed from the perspective of organization, space and program. In addition, the master plan and unit project, the organization and progress, and the budget plan were reviewed. As a result, the New Deal project for urban regeneration is importance on economic regeneration, which, unlike the integrated and continuous guide proposed by the government, could limit the individual progress of transitional organizations, 2-dimensional planing and various programs. Thus, first, in order to supplement the organization's verticality and inefficiency in progress, the annual business assessment should be discouraged and the permit and progress of the project should be determined at the local government level. Second, integrated and multidimensional planning is necessary to produce synergy effects in the physical environment. Finally, the link between program unit projects and the economic effects can be considered.