• Title/Summary/Keyword: Design project

Search Result 4,024, Processing Time 0.039 seconds

A Case Study on a Programming Subject through Project-Based Learning in the COVID-19 Environment (코로나-19 환경에서의 프로젝트 교수법을 통한 프로그래밍 지도 사례)

  • Lee, Sungock;Yang, SeungEui;Jung, Hoekyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.25 no.11
    • /
    • pp.1655-1662
    • /
    • 2021
  • The purpose of this study is to draw implications through a case study on the curriculum operation of a professor who operated a programming subject as a PBL(project-based learning) method in an untact situation due to COVID-19. A survey was conducted for first-year freshmen students to determine their learning condition before project implementation. Based on the results of the questionnaire, individual interviews were conducted to identify the needs for education, and then, basic grammar for project completion and lectures that segmenting each stage of the project were composed. Repeated learning was induced through weekly quizzes, and feedback was given by giving time in advance until the project deadline. 23 students (40 students in total) completed the project. The remaining 17 students took the exam but did not complete the project. The purpose of this study is significant in that it investigated whether a project can be carried out through instructional design, execution, and interaction while operating a programming subject through PBL in the COVID-19 environment.

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.

A Study on the Meaning of Prototypes and Prototyping Strategy in User Interface Design (사용자 인터페이스 디자인에서 프로토타입의 의미와 프로토타이핑 전략에 대한 연구)

  • 박정순
    • Archives of design research
    • /
    • v.13 no.3
    • /
    • pp.145-152
    • /
    • 2000
  • Since interactive systems that the user interaction is important factor can be very complex, its design process may have various testing and feedback based on continuous prototyping. The prototypes in this process function as medium to explore design problem and communicate opinions with another expert of project team. So prototyping strategy may be needed to enhance the design quality by focusing on the goals of project. This study clarifies critical issues around the prototypes and characteristics of interactive system to understand broad meaning of prototypes. And prototype model proposes as a framework for establishment of prototyping stategy.

  • PDF

The Development of the Rotorcraft Multidisciplinary Design Optimization Framework and Conceptual Design Using the KHP-SDM RMDO (회전익비행체 다분야통합 최적설계 프레임워크 개발 및 KHP-SDM RMDO를 이용한 회전익비행체 개념설계)

  • Choi, Won;Hwang, Yu-Sang;Kim, Cheol-Ho;Kim, Sang-Hun;Lee, Dong-Ho;Park, Chan-Woo
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.37 no.7
    • /
    • pp.685-692
    • /
    • 2009
  • This paper dealt with the development of the Framework for Multidisciplinary Design Optimization for the rotorcraft design concept and the building process of KHP(Korea Helicopter Project) - SDM(Simulation Data Management) system to manage various analysis data, which are used in the rotorcraft development phase. KHP-SDM RMDO(Rotorcraft Multidisciplinary Design Optimization) framework, which applied optimization modules of KHP-SDM and integrated the developed Multidisciplinary analysis modules, was constructed in the KHP-SDM. The results of the rotorcraft conceptual design using KHP-SDM RMDO showed that the framework was evaluated to be successfully constructed.

Establishment of Collaborative Decision Making Support Process in Pre-Final Design Step (건축 중간설계단계의 협력 의사결정 지원 프로세스 구축)

  • Oh Seung-Jun;Kwon Won;Kim kyung-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.315-318
    • /
    • 2003
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. Therefore The final object of this study is to propose the establishment method of decision support process for the cooperative design in order to provides improved design coordination and optimize the building system.

  • PDF

Comparative numerical analysis for cost and embodied carbon optimisation of steel building structures

  • Eleftheriadis, Stathis;Dunant, Cyrille F.;Drewniok, Michal P.;Rogers-Tizard, William;Kyprianou, Constantinos
    • Advances in Computational Design
    • /
    • v.3 no.4
    • /
    • pp.385-404
    • /
    • 2018
  • The study investigated an area of sustainable structural design that is often overlooked in practical engineering applications. Specifically, a novel method to simultaneously optimise the cost and embodied carbon performance of steel building structures was explored in this paper. To achieve this, a parametric design model was developed to analyse code compliant structural configurations based on project specific constraints and rigorous testing of various steel beam sections, floor construction typologies (precast or composite) and column layouts that could not be performed manually by engineering practitioners. Detailed objective functions were embedded in the model to compute the cost and life cycle carbon emissions of the different material types used in the structure. Results from a comparative numerical analysis of a real case study illustrated that the proposed optimisation approach could guide structural engineers towards areas of the solution space with realistic design configurations, enabling them to effectively evaluate trade-offs between cost and carbon performance. This significant contribution implied that the optimisation model could reduce the time required for the design and analysis of multiple structural configurations especially during the early stages of a project. Overall, the paper suggested that the deployment of automated design procedures can enhance the quality as well as the efficiency of the optimisation analysis.

Development of the Technical Calculation System for Transmission Line in Myanmar (미얀마 송전선로 설계 기술계산시스템 개발)

  • Baik, Seung-Do;Min, Byeong-Wook;Kim, Jong-Hwa;Shin, Tai-Woo;Kim, Sae-Hyun;Park, Jae-Ung
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.632-634
    • /
    • 2005
  • Korea takes part in overseas business by use of accumulated advanced technology through construction of the worlds first 765kV double circuit transmission system designed with pure local technology. 'Development Study on the Power System Network Analysis in Myanmar' was received in the year 2001 and was completed in the year 2002. The following project,'Feasibility Study and Basic Designs for the 500kV Transmission System in Myanmar' has been in progress since January, 2004. With regards to this project the master plan for the Myanmar long term power system was submitted in January 2005, and now the basic designs for the 500kV transmission system construction are in progress. Technical data for the design of the transmission line is calculated using a very complex numerical formula that is almost impossible to be completed by hand. So the transmission technical calculation system was developed to calculate and support Myanmar technical data for the design of transmission line with respect to factors such as wind prossure load, tower design data conductor design data and insulator design data on the basis of weather conditions for the Myamar transmission line design area of the Myanmar 500kV trans- mission line construction basic design.

  • PDF

Analysis of Cost Variation of Piping Equipment Design of a Steel Manufacturing Plant by Simulation (시뮬레이션을 통한 제철플랜트 배관장치 설계비용의 변동 범위 분석)

  • Bae, Kyung-Suk;Heo, Ki-Moo;Yoon, Sung-Hoon;Moon, Yoon-Jae;Yoo, Ho-seon;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.10 no.4
    • /
    • pp.29-34
    • /
    • 2014
  • In this consideration, this research investigated the piping design items and drew out key design items through interview with experts and surveys to apply them to actual project examples and look into piping design item-specific significance and cost variation ranges. Based on this investigation, the Monte-Carlo simulation was employed herein to analyze the cost variation range for the entire piping design costs with a view to presenting a way to calculate a reasonable bidding price for any similar project and verify the appropriateness of joining a bid.

  • PDF

Analysis of Reliability and Suggestion on BIM design at Daegu Expressway Lot No.5 (대구순환고속도로 제5공구 BIM 시범설계의 신뢰성분석 및 제언)

  • Seol, Un-Ho;Bae, Byung-Hoon;Park, Jong-Seo;Shin, Jae-Choul;Lee, Geun-Il
    • Journal of KIBIM
    • /
    • v.4 no.4
    • /
    • pp.1-12
    • /
    • 2014
  • As interest for visualization and real time processing of construction management information was heightened recently, a diversity of management tools have been developed and corresponding systems also have been changed. In the case of BIM(Building Information Modeling) which is being spotlighted as such kind of management tool, its outcome such as technical innovation and time saving through overseas success case, reducing effect of unnecessary work, and so forth has continuously been established. The BIM in which various information related with life cycle of project are managed with the base of 3D object is useful as an information management tool of construction project which becomes complex and large in its scale. The aim of this paper is analysis or reliability on BIM design for expressway. To solve these issues, this study analyzes the design document, road design handbook, guide. Also this paper performed analysis of reliability 2D vs. BIM quantity calculation. This pilot projects "BIM design at Daegu expressway Lot No.5" lays the foundation for future work on BIM based civil engineering design.

Design considerations for teleoperation systems operating in gas-tight argon cells

  • Yu, Seungnam;Lee, Jongkwang;Park, Byungsuk;Cho, Ilje;Lee, Hyojik
    • Nuclear Engineering and Technology
    • /
    • v.49 no.8
    • /
    • pp.1717-1726
    • /
    • 2017
  • In the nuclear industry, mechanical engineers spend a significant portion of their time designing equipment such as manipulators, bogies, mechanical grippers, and so on. Some customized designs can be considered as standard mechanical equipment in this area, although it is not unusual to find that an existing design cannot simply be copied from one project to another. Varied performance requirements can dictate that redesign, often quite extensive redesign, is required. However, if something similar has been done before, engineers could use that as a starting point for the new project. In this regard, this study presents several guidelines inspired by previous design knowledge for similar development cases. Moreover, this study presents more detailed suggestions such as design guidelines for an argon-based hot cell atmosphere and design experience for a large-scale practical hot cell facility. Design considerations and case studies dealt with in this study are dedicated to teleoperation manipulators that are used at a large-scale argon cell facility for pyroprocess integrated inactive demonstration (PRIDE), at the Korea Atomic Energy Research Institute. In particular, for case studies to support the suggested recommendations, a fabricated telemanipulator system for PRIDE is introduced, and several kinds of experimental results associated with it are presented.