• Title/Summary/Keyword: Design project

Search Result 4,019, Processing Time 0.025 seconds

Development of Learner-centered Hybrid Project Learning Program (학생주도 창의융합 프로젝트 교육 모델 개발)

  • Shin, Sun-Kyung
    • The Journal of Korean Institute for Practical Engineering Education
    • /
    • v.4 no.2
    • /
    • pp.53-59
    • /
    • 2012
  • This article reviews the current issues of engineering education: engineering creativity, R&D 3.0 and Education 3.0 and comfirms need of refining quality of engineering education through learner-centered hybrid project learning. this article suggests the Global engineering project(GEP) program as an ideal hybrid project learning model that develop student's creativity and convergence capability. GEP program is learnner-centered interdisciplinary program that whole processes are managed by interdisciplinary students team aiming to global engineers who are globally competent and locally relevant so that they can function effectively in any country by local activity in developing country. The program consist of four main parts: 1)pre activity, 2)local activity from abroad, 3)design and producing prototype and 4)participating in the design contest or academic conference with the products. As a result, students' global competence, teamwork skill and capability of creative problem solving are remarkably improved.

  • PDF

A Comparative Study of Major Constructivist Teaching & Learning Strategies for Developing Learners' Expertise in Architectural Design - With a Focus on Problem-based Learning(PbBL), Case-based Learning(CBL), Project-based Learning(PjBL) - (건축설계 전문성 개발을 위한 구성주의 수업전략 탐색 연구 - 문제중심학습, 사례기반학습, 프로젝트중심학습을 중심으로 -)

  • Lee, Do-Young
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.3
    • /
    • pp.61-72
    • /
    • 2018
  • This study pursued to obtain 3 consecutive purposes. First, a conceptual model for comparing 3 constructivist teaching and learning strategies( problem-based learning[$P_bBL$], case-based learning[CBL] and project-based learning[$P_jBL$]) was developed. Relationships of these constructivist strategies with the development of expertise for learners were discussed. Second, specific differences between $P_bBL$, CBL and $P_jBL$ as applied in architectural design courses were analyzed under each of the teaching and learning category. Some analytical indexes were developed by content analysis, which are applicable effectively to reveal the differences. Based on the previous findings, third, a set of strategic guidelines for use in class were made and suggested in order to develop and improve expertise in architectural design. These guidelines were largely targeted for university design courses as well as education or reeducation of practicing architects. Expecially, combined application of $P_bBL$, CBL and $P_jBL$ was hypothesized and suggested as class management guidelines. In sum, a variety of $P_bBL$ problems, CBL cases and $P_jBL$ projects should be developed for expecting audience based on design subjects and tasks. As working domains of practicing architects, exploring/analyzing, understanding/making applications, and criticizing/self-reflecting should be considered in the development process.

A Study on the Factors Affecting the Detailed Design Price of Road Construction Project (국내 도로공사 실시설계 대가영향요인에 관한 연구)

  • Lee, Mi-Young;Seo, Jung-Hoon;Oh, Se-Wook
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.9
    • /
    • pp.44-54
    • /
    • 2018
  • In the construction project, the design field has a crucial effect on the success or failure of the final product, and it is becoming more important as a core area of national industrial development because it creates high value added by technology. In addition, since the design work is carried out based on professional technical personnel, in order to secure the quality and competitiveness of the design, it is necessary to continuously input the excellent manpower and develop the technology, and above all, the appropriate design cost must be ensured. However, as a result of reviewing the current status of the design cost criterion in Korea, problems such as mixed cost calculation method, inaccuracy of construction cost ratio method, and inactivation of cost plus fixed fee method were analyzed. Therefore, it is difficult to calculate the fair value reflecting the characteristics of the project when calculating the construction design price. Therefore, the price criterion should be improved so that the fair value of the design can be determined according to the contents of the project, By analyzing the correlation and multiple regression analysis of the projects and price information of the completed road construction design, the factors influencing the design price and the level of influence were analyzed.

A Development of Creative Capstone Design Education (창의적 캡스톤 디자인 교육 방법 개발)

  • Yoon, Seok-Beom;Jang, Eun-Young
    • Journal of the Korea Convergence Society
    • /
    • v.5 no.4
    • /
    • pp.15-20
    • /
    • 2014
  • This paper discusses the creative capstone design education in Kongju National University and introduce a new operational capstone design education method. The result products are evaluated by self-evaluation and performance assessment that is based on the operational method and procedure of the project. The capstone design teams are comprised of 2~3 students with a individual major accomplishments. All teams are satisfied the criteria of evaluation. And their's self-satisfaction and questionaries are totally 3.88~4.44 point out of 5. Compared with the conduct of previous capstone design project that was not the industry affiliate, it provides students with industrial experience in design and development of industrial solution. And industrial partner must provide funds for student team to design, fabrication and test in next time.

An Analysis on the Layout Patterns and their Trends in the Apartment Housing Design Competitions of Sejong City (행정중심도시 공동주택 설계공모안의 배치 계획 및 경향 분석)

  • Kim, Hyung-Jin;Kim, Young-Suk;Kim, Sang-Jin;Cho, Jung-Geun;Park, Chan-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.4
    • /
    • pp.1381-1390
    • /
    • 2010
  • This study is to consider a variety design methods and trends applied in the recent apartment housing design competitions for Sejong city. Because the Sejong city project housing design competitions were the most recent and foremost architectural firms and construction companies in Korea were participated in the Sejong city project. Therefore, the new design concepts should be used in the entry works of the design competitions, these analysis and valuations can be utilized for future and advanced housing estate design.

A Study on the PBL Based Teaching-Learning Model Using BIM Tools for Interior Architecture Design Studio (BIM활용 문제중심학습기반 실내건축 설계수업 교수-학습모형에 관한 연구)

  • Han, Young-Cheol
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.3
    • /
    • pp.67-79
    • /
    • 2012
  • The purpose of this study is to suggest the interior architecture design studio through the pedagogical method of educational technology for college students who lack self-directed learning. The pedagogical method has been organized to make a student-centered class based on the operation of existing architectural design studios. This teaching and learning method emphasizes the role of teachers as facilitators to help students lacking in self-directed learning in the design process, the BIM visualization to give students an expression of design project and the critics to give students an experience of working circumstances. The results of this study can be summarized as follows. First, This pedagogical model can improve the self-directed learning of students, accomplish the design process well through teamwork, and provide problem based learning (PBL) to settle obstacles that come up during the project. Second, through this model, students can improve their field design capacity by instructor, design feedback and criticism. Finally, This model can suggest new pedagogical methods for interior architectural design studios and management of student-centered studios.

Development of STAGE-GATE based Evaluation Index for the Improvement of Design Quality of Plant Material (플랜트 기자재 설계품질 향상을 위한 STAGE-GATE 기반 평가항목 개발)

  • Lee, In Tae;Baek, Dong Hyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.2
    • /
    • pp.65-71
    • /
    • 2020
  • Worldwide plant market keeps maintaining steady growth rate and along with this trend, domestic plant market and its contractors also maintain such growing tendency. However, in spite of its external growth, win-win growth of domestic material industry that occupies the biggest share in plant industry cost portion is extremely marginal in reality. Domestic plant material suppliers are required to increase awareness of domestic material brand by securing quality and reliability of international standard through improvement of design quality superior to that of overseas material suppliers. Improvement of design quality of plant material becomes an essential element, not an option, for survival of domestic plant industry and its suppliers. Under this background, in this study, priority and importance by each evaluation index was analyzed by materializing plant design stage through survey of experts and defining evaluation index by each design stage and based on this analysis result, evaluation index of stage-gate based decision-making process that may improve design quality of plant material was suggested. It is considered that by utilizing evaluation index of stage-gate based decision-making process being suggested in this study, effective and efficient decision-making of project decision-makers would be enabled and it would be contributory to improve design quality of plant material.

A study on the integrated data modeling for the plant design management system and the plant design system using relational database (관계형 데이터베이스를 이용한 PDMS/PDS의 통합 데이터 모델링에 관한 연구)

  • 양영태;김재균
    • Journal of Ocean Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.200-211
    • /
    • 1997
  • Most recently, offshore Engineering & Construction field is concerned about integration management technology such as CIM(Computer Integrated Manufacturing), PDM(Product Data Management) and Enterprise Information Engineering in order to cope with the rapid change of engineering and manufacturer specification as per owner's requirement during construction stage of the project. System integration and integrated data modeling with relational database in integration management technology improve the quality of product and reduce the period of the construction project by reason of owing design information jointly. This paper represents the design methodology of system integration using Business Process Reengineering by the case study. The case study is about the offshore plant material information process from front end engineering design to detail engineering for the construction and the basis of monitoring system by integrating and sharing the design information between the 2D intelligent P&ID and 3D plant modeling using relational database. As a result of the integrated data modeling and system integration, it is possible to maintain the consistency of design process in point of view of the material balancing and reduce the design assumption/duration. Near future, this system will be expanded and connected with the MRP(Material Requirement Planing) and the POR (Purchase Order Requisition) system.

  • PDF