• Title/Summary/Keyword: Design project

Search Result 4,019, Processing Time 0.028 seconds

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

Industry Joint Engineering Education Via Interdisciplinary Team-based Product Development Project (학제간 팀별 설계프로젝트 기반 산학공동 공학설계교육)

  • Jee, Haeseong
    • Journal of Engineering Education Research
    • /
    • v.16 no.3
    • /
    • pp.51-60
    • /
    • 2013
  • The paper addresses an issue of industry-joint engineering education paradigm with the purpose of setting a new standard for engineering education by development and support of competitive curriculum for the interdisciplinary team-based product development, a specialized and innovative engineering education program. In the department of MSDE (Mechanical and System Design Engineering), students are educated via three major courses for targeting engineering design, Creative Engineering Design (freshman), Design Process (Senior), and Creative Product Development (Junior). All these courses are based on personal tool exercises for design software and hardware and team-project group activities of the students with other team members. This paper will briefly discuss the main focuses of these courses and case studies of the teaching results targeting the development of telecommunication device.

Study on the Application of RAMS for Rolling Stock (철도차량 RAMS 적용에 관한 연구)

  • Oh, Ji-Eun;Kang, Chan-Yong;Kim, Chul-Ho
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.206-212
    • /
    • 2004
  • This paper is application of System Assurance(SA) for the rolling stock. As railway systems become more complex, design teams are increasingly under pressure to deliver, design solutions, which integrate both technical and Systems Assurance(SA). Systems Assurance is the application of management methods and analysis techniques to ensure that a design meets Reliability, Availability, Maintainability and Safety (RAMS) criteria. It should be clearly understood that the intent of System Assurance is not just to provide analytical techniques as a metric on performance, but more importantly it should provide a management tool with which to co-ordinate and assure the whole design. System Assurance encompasses the ongoing requirement to consider safety, and RAM through each stage of a Project, from feasibility study through to commissioning and operation. If System Assurance is undertaken properly at feasibility study at the design stages of a Project, the benefits of such analyses can be significant in identifying potential problems early enough for action to be taken before manufacture or installation. At commissioning, RAMS demonstration activities are undertaken to validate the predictive and analytical techniques undertaken during the design.

  • PDF

Comparison of Database Models for Developing a Pavement Performance Analysis System

  • Choi Jae-ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.79-86
    • /
    • 2004
  • One of the most difficult tasks in pavement management information systems is establishing the links between performance measures of a structure and the design and construction inputs. In-situ pavement performance can be considered a response variable to many project input variables, such as design, construction, and traffic loading effects. If we are to fully understand the component of pavement performance and specify the inputs through design and construction specifications to achieve that performance we must develop quantitative relationship between input and response variables through a scientific, fully integrated Pavement Performance Analysis System (PPAS). Hence, the objective of this study is to design a database model required for developing an effective database template that will allow analysis of pavement performance measures based on design and construction information linked by location. In order to select the most appropriate database model, a conceptual database model (Entity Relationship Model) and dimensional model, which is believed to be the most effective modeling technique for data warehouse project, are designed and compared. It is believed that other state highway agencies could adopt the proposed design strategy for implementing a PPAS at the discretion of the state highway agencies.

A Study on Service Marketing Strategies in Interior Projects (인테리어프로젝트의 서비스마케팅적 전략에 관한 연구)

  • 전미자;박성희;허범팔
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2001.05a
    • /
    • pp.168-172
    • /
    • 2001
  • An applied art, business project for consumers, pursues aesthetic objectives. Therefore it is required to approach the concept of service marketing for consumer satisfaction. The purpose of this paper is to verify the effectiveness of concepts for service marketing in processing interior design project. The contribution of this research is the refined checklists for interior design projects which can be applied to actual business as well as the introduction of service marketing concept into interior design industry. This paper proposes an advanced business in interior design industry and is expected to increase consumer satisfaction in living space as their needs and life styles are being more diversified.

  • PDF

The Experiment of BIM application for Design Education - In the Elementary School Project - (교육을 위한 BIM 적용 실험 연구 - 초등학교 설계를 중심으로 -)

  • Kim, Yong-Il
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.21 no.5
    • /
    • pp.23-29
    • /
    • 2014
  • It is evident that the education of architecture is being transformed under the influence of technological, environmental, social, and financial challenges. BIM application for design education is innovative responses that are expected to provide the high ground for the AEC industry. So the purpose of this paper introduces that application of BIM for design education of students is efficiency and effectiveness through an actual experiment by elementary school project. The results by actual experiment elaborate the role of BIM in architectural education and its appropriate place in the curriculum. Also they state that increasingly complex nature of professional world that is reliant on design teams, joint development efforts, and more complex design projects makes obsolete the designer who is trained as solo artist engaging in competitive and individual pursuits.

"G" Oriental Clinic in Gumho-dong (금호동 "G" 한의원)

  • Lee, Jong-Sook;Park, Hyun-Ok
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2008.05a
    • /
    • pp.78-81
    • /
    • 2008
  • The number of clinics for Oriental Clinic is increasing sharply in Korea after the inception of National Health Insurance System in 1987. However there have been many troubles in making efficient plans for oriental clinic facilities because of the lack of proper guidelines related to the design of them. This research was conducted as part of the planning project for the "G" Oriental Clinic. The purpose of this project Is to place a optimal number of beds in a small oriental clinic and medical-environmental friendly design After arranging necessary spaces, such as the Director's Office, Herbal Medicine Preparation Room, Multipurpose Room, Medicine Cabinet, and Waiting Room in the clinic, partitions are used to differentiate the spaces and the storage area.

  • PDF

DEVELOPMENT OF DESIGN FOR AUTOMATION (DFA) BASED ON QUALITY FUNCTION DEPLOYMENT

  • Tae-Hoon Kim;Yoonseok Shin;Wi Sung Yoo;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1075-1080
    • /
    • 2009
  • Recently, the building construction industry has been forced to cope with lack of skilled labor. A robot-based construction automation system should help overcome crucial troubles which may be caused by this phenomenon. In particular, it is vital to propose design for automation (DFA). Quality function deployment (QFD) is applied a systematic aid in determining the design reflecting customer's needs. This study employs the QFD approach to plan the component designs of an effective automation process, and presents the development process of DFA with an illustrative project. As a result, the study identifies the developers' design requirements for automated construction and weights them by their importance indices.

  • PDF

NPV-BASED 3D ARRAY DESIGN SYSTEM OF ROOF-TOP PHOTOVOLTAICS

  • Kim Se-Jong;Cho Dong-Hyun;Park Hyung-Jin;Yoon Hee-Ro;Koo Kyo-Jin
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.300-303
    • /
    • 2013
  • On BIPV systems, especially roof-top PV systems, the power generation is easier to be reduced due to the shades of facilities nearby, or roof itself. To secure profitability of roof-top PV systems, the optimal design of solar arrays through the precise shading analysis is an important item of design considerations. In this paper, an optimization system for array design of roof-top PVs is to be developed using three-dimensional Geospatial Information System(GIS). The profitability of income and expense is considered through the shading analysis of entire roofs. By applying the system to project for validation, the adequacy and the improvement of NPV of the system were verified compared to expert's design. The system has significance by reason that PV modules are placed through rules established with expert knowledge and geometric rules were applied to reflect the constructability and maintainability.

  • PDF

A study on the status and improvement of construction management in Gwangjin-Gu Culture & Sports Center (광진구민회관의 건설사업관리 적용현황과 개선방향에 관한 연구)

  • Jung Jae-Jin;Yoo Byeong-Gi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.32-39
    • /
    • 2003
  • Owners, local autonumous entities, have a burden on operating project for the lack of their management capacity such as specialty and human resources. In this reason, they want to perform project with CM methods. But there have been only a few case of CM operation and application in a huge construction project. The complex formations of CM and responsible management are used in those project. This situation originates in the lack of CM specialist. Because the CM service used in those case is generally performed as the mixture of responsible management service and design management service, it is not the prototype of CM. The purposes of this study are to present the solutions to the problems concerned with the design development phase management, design phase VE, the application of Fast-Track, PMIS operation and CM execution, etc, and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Gwangjin-Gu Culture & Sports Center.

  • PDF