• Title/Summary/Keyword: Design project

Search Result 4,019, Processing Time 0.033 seconds

A Case Study of Information System Auditing of CBD Project (CBD프로젝트의 정보시스템감리 사례연구)

  • 조남재;박기호;전순천;박준호
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.2
    • /
    • pp.167-178
    • /
    • 2004
  • Different from traditional development methodologies like waterfall model, the CBD (component based development) methodology relies on a building block approach in the design and development of information system. The audit procedure and checklist for the traditional IS development methodology are required to be modified to be suitable for CBD. This research reviewed IS audit guidelines for the existing development process and analyzed multiple projects that employed the by component based development process. For the purpose of this study, we chose a governmental project and a next-generation IS project of a financial agency as sample cases. By comparing existing IS audit checklists and items actually reviewed in audit projects, this study identified appropriate check items for the CBD-centric audit program. New items were proposed as additional items such as project control in management phase, usage case and conceptual model establishment, component evaluation and design, in implementation phase, and so forth. The result of the research provides new guidelines for the audit CBD projects for the purposed of increased efficiency and qualify of application development projects.

  • PDF

Introduction to SE Process Application on the development project of the Korean High-speed Train(HSR 350-x) (한국형 고속열차(HSR 350-x) 개발사업의 시스템엔지니어링 프로세스 적용사례 소개)

  • Park, Choonsoo;Lee, Tae Hyung;Choi, Sunghoon;Kim, Kihwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.15-26
    • /
    • 2008
  • The Korean High-speed train was developed during 1996 to 2007. This development project consists of many sub-projects and the train-system includes a lot of sub-systems. In order to promote the project on planned cost and time effectively, we tried to apply systems engineering process during the whole life-cycle. The purpose of this paper is to introduce the systems engineering process applied to this project. Activities carried out in each phase such as pre-design, detailed-design, integration & verification are described.

  • PDF

Standard Classifications and Project Numbering System for Integrated Construction Management of Modernized Korean Housing (Hanok) (신한옥 건설통합정보화를 위한 표준정보분류 및 사업번호체계)

  • Jung, Young-Soo;Kim, Woo-Joong;Ha, Ji-Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.4
    • /
    • pp.225-233
    • /
    • 2012
  • A comprehensive research effort in order to develop and disseminate modernized Korean housing (Hanok) has recently been initiated by Korean government. This large scale research project encompasses a wide spectrum of housing development including public policy, architectural plans, modules, construction materials and methods, prefabricated assemblies, automated production, construction management, and advanced information systems. For the purpose of integrating and automating the whole processes from an industry perspective, it is of great importance to develop a standard classification system and project numbering system (PNS) for the modernized Korean housing. This paper focuses on the standard classification systems and PNS for cost and schedule control. The distinct characteristics and managerial requirements were explored and embedded into the proposed classifications for modernized Hanok.

The DB structure for Standard Criteria of Urban Transit Facilities (도시철도시설 표준화기준을 위한 DB구축방안 연구)

  • Lee, Woo-Dong;Kim, Jin-Ho;Han, Seok-Youn;Sin, Won-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2008.10c
    • /
    • pp.213-214
    • /
    • 2008
  • Since standardization project is composed of complicate system, such as vehicle, signal, electric power and railway, how to build management system of the project has influence on the success of the project for the first stage of the project. The computer system design tool supports to carry out requirement analysis, DB construction, and history and follow-up management efficiently. Therefore, the aim of this study is to investigate the method to optimize schema using computer system design tool.

  • PDF

Technical Management Planning Process of Engineering Project (개발 프로젝트의 기술관리 계획 프로세스)

  • Yoo, Il Sang;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.

  • PDF

Design Direction of a Big Data based Performance Monitoring System using Quality Function Deployment (QFD를 이용한 빅 데이터 기반 성과 모니터링 시스템의 설계방향 도출)

  • Kim, Chang-Won;Kim, Taehoon;Seo, Junghoon;Lim, Hyunsu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.255-256
    • /
    • 2021
  • The performance measurement of construction projects has traditionally been evaluated as a prerequisite for successful project completion. Considering this importance, the UK and the US are operating quantitative performance measurement systems for construction projects. However, in the case of Korea, there is a limit to the use of existing methods due to the limitation of data collection. Recently, in consideration of the domestic situation, research is being conducted to measure the quantitative performance of a project by using big data including progress and project attribute information. Therefore, this study aims to present the design direction of a performance monitoring system using Quality Function Deployment.

  • PDF

Profession and strategy of BIM managers in Japan

  • Kaneta, Takashi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.167-175
    • /
    • 2017
  • Building Information Modeling (BIM) comes to be implemented into architectural design, construction, and maintenance in Japan in order to convert design information thoughout a construction project. However, various problems are taking place in data transaction. It is not also clear about the role and the responsibility of the architects and the enginners in charge.There is a movement to establish a BIM manager as a general coordinator concerning BIM in Singapore and other countries, though it is not yet popular in Japan. This paper deals a BIM manager as a new profession in a construction project. The function and skills necessary to a BIM manager is analyzed, and the strategy of Japanese general contractors is discussed. General contractors from Japan are operating BIM in Singapore compatible with open system of supply chain. This style is different from the one in Japan even they belong to the same company. In this paper it is analyzed based on the survey in detail.

  • PDF

Review of Construction Business Intelligence Research

  • Baek, Seungwon;Han, Seung Heon;Yun, Sungmin;Jung, Wooyong
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.371-380
    • /
    • 2020
  • With the 4th industrial revolution, many advanced information technologies are being applied to the area of construction engineering and project management. These applications are usually focusing on design, construction and operation stage and are producing many meaningful fruits. Even though these studies are very important for the development of the construction industry, this study insists that the other stage perspective such as construction business also should be emphasized. Because business phase has significant impacts on the success of a construction project as well as design, construction and operation phase. So, this study reviewed the intelligent-approach papers in planning and marketing, estimation and bid, contract and claim, and project financing fields. This study provides some insights such as values, difficulties, limitations and future directions of business intelligence application.

  • PDF

A Study on the Process of Estimating the Amount of Materials for Client's Decision-Making Support in Space Programming Stage of Pre-design BIM -focusing on Building Interior Finishing- (건축 기획 BIM의 공간 프로그래밍 단계에서 발주자 의사결정지원을 위한 물량예측 방법론에 관한 연구 -건축마감을 중심으로-)

  • Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.19-28
    • /
    • 2010
  • The construction projects are recently having changes in their magnitude and complexity. Therefore, the amount of information created and managed by participants over project phases is enormous and this may cause difficulties in consistent and integrated data management. Because of the change in construction projects, there is a need to apply more logical and systematic ways to deal integrated data management. For the solution to this, BIM(Building Information Modeling), a new paradigm for integrated management of the information over project life-cycle, has been seriously considered. Also, the Korean Public Procurement Service announced that project over 50 billion Korean Won should introduce BIM into procurement starting from 2012. However, the studies and development have lack on studies of applying BIM and managing the data made using BIM in pre-design and maintenance stage. In pre-design stage, the concept of schematic design model is made to support for making major decisions concerning the size, shape and cost of the project. To decide the cost for the building in this stage by making use of BIM, estimating the amount of building materials used for constructing should be preceded. In this study, the pre-design BIM is explained to gain a better understanding of its process, since this paper focused on space programming stage. Finally, the paper suggests the concept process of estimating the amount of materials in building interior finishing from selecting the type for the elements of each space made to support the client for making decisions in space programming stage based on pre-design BIM.