• Title/Summary/Keyword: Design phase

Search Result 6,224, Processing Time 0.033 seconds

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

A Study on the Application of Design Process in the Architectural Design Practice (건축설계 실무과정에서 디자인 프로세스의 적용에 관한 연구)

  • Kang, Mi-hyun;Kim, So-ra;Shin, Byeong-uk
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.3
    • /
    • pp.59-66
    • /
    • 2022
  • This study aims to find out how architectural designers applied the design process and what content is applied in the practical process of architectural design in Korea, and to improve it if there is a problem. So the study is carried out by investigating 13 architects(Including one person who wants to keep his work private) with extensive experience in architectural design. The architects were questioned on how and what content the design process was used for their representative works that had been designed. And interviews and field surveys were conducted on other matters to be improved. The survey was conducted from November 2021 to July 2022. According to the conclusion of this study, First, Most architects were applying the design process in the architectural design practice. These are caused by an impact on education, but there was also an aspect of preparation in terms of guidelines such as the Architects Association and storage rights. Second, Although the design process differed in each name and phase, it was generally carried out in the order of the start phase, the planning work phase, the basic design phase, the intermediate design phase, the implementation quarterly, and construction. Third, The step-by-step work of the design process differed slightly depending on the architect, but counseling and contract work were mainly performed at the start-up phase, and field surveys, legal investigations, and case studys were conducted at the planning phase. In the basic design phase, some contents related to architectural programming, basic drawings, images, and models were used as main work contents. In the intermediate design phase, secondary contents such as licensed books and facility facilities were the main tasks. In the implementation design phase, detailed maps and various frost facilities were finally inspected. Since then, construction and supervision have been carried out in the order of progress. Forth, As for the contents to be improved in the future, the architect's ability, the designer's knowledge of the overall architecture, the design supervision system, and the expansion of time for the initial design process were answered.

The Design of Rotor Bars of Single-Phase Line-Start Permanent Magnet Motor for Improving Starting Characteristics (단상 유도동기전동기의 기동 특성 개선을 위한 회전자 바 형상 설계)

  • Lee Chul-kyu;Kwon Soon-hyo;Yang Byung-yull;Kwon Byung-il
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.54 no.8
    • /
    • pp.370-376
    • /
    • 2005
  • The single-phase induction motor is simple and durable, but the efficiency is low. Therefore, electric motors like HLDC and LSPM(line-start permanent magnet motor) that use the permanent magnet have been studied. The most advantages of single-phase LSPM is having the same stator as the stator of the single-phase induction motor and permanent magnets are just inserted in the squirrel cage rotor of the single-phase induction motor. But the characteristics of single-phase LSPM synchronous motor has very complex characteristics until the synchronization and if the design is not suitable, the single-phase LSPM synchronous motor cannot be synchronized. We designed a single-phase LSPM using the same stator and winding as the conventional single-phase induction motor, but newly designed the permanent magnets considering air gap magnetic flux density. The transient characteristics of the single-phase LSPM is not good because of a magnetic breaking torque, however, it can be improved by redesigning the rotor bars. We are proposed the design method of rotor bar for the single-phase LSPM to start softly and to make synchronization easily.

A CBR-BASED COST PREDICTION MODEL FOR THE DESIGN PHASE OF PUBLIC MULTI-FAMILY HOUSING CONSTRUCTION PROJECTS

  • TaeHoon Hong;ChangTaek Hyun;HyunSeok Moon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.203-211
    • /
    • 2009
  • Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.

  • PDF

The Design Conditions of Single Phase SRM Pole-Arcs for Blower Drives (송풍기 구동용 단상 SRM의 극호 설계 조건)

  • Lee, Jong-Han;Lee, Eun-Woong
    • Proceedings of the KIEE Conference
    • /
    • 2003.10b
    • /
    • pp.125-127
    • /
    • 2003
  • The single phase switched reluctance motor(SRM) is more simpler and robust in the structure than poly phase SRM. It has the merits that it reduces the switching elements and the energy density per volume is very high. Recently, it has been researched and developed in various types and starting method due to the technique of power electronics and the computer added design. The single phase SRM is tried to apply to many industrial appliance field to substitutethe the induction motor by the single phase SRM. On the previous studies, we decided the design parameters of the single phase SRM for the blower driver to adapt the design method of the conventional machine and the poly phase SRM. In this studies, it is proposed the conditions to decide the optimal pole arcs because the stator and rotor pole arcs is very important in the characteristics of the single phase SRM. For this reason, it is analysed the characteristics of current on/off angle vs. pole arc, pole arcs vs. average torque.

  • PDF

Phase noise spectrum distribution design of remote controller using BPSK mode (BPSK 모드를 사용하는 원격제어 장치의 위상잡음 스펙트럼 분포 설계)

  • Kim, Young-Wan
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.8
    • /
    • pp.1805-1810
    • /
    • 2014
  • The phase noise spectrum distribution for remote controller using the BPSK mode and low data rate of 50 kbps was designed and proposed in this paper. In case of applying the BPSK that transmission performance is superior to FSK method, the performance degradations due to phase noise are generated. To minimize the phase noise effect, it is important to dispatch the digital signal in channel environment with required phase noise characteristics. To provide the terminal design technique and the proper channel environment with required phase noise characteristics, the phase noise spectrum distribution was designed for required phase noise characteristics. By analyzing the phase noise effects for damping factor and noise bandwidth of the carrier recovery circuit, the phase noise spectrum design that consider the damping factor and noise bandwidth was performed. Based on the IESS-308 standards, also, the phase noise effects was analyzed. The phase noise spectrum design techniques and phase noise spectrum that is suitable to remote controller were proposed.

A Note on Complex Two-Phase Sampling with Different Sampling Units of Each Phase

  • Lee, Sang Eun;Jin, Young;Shin, Key-Il
    • Communications for Statistical Applications and Methods
    • /
    • v.22 no.5
    • /
    • pp.435-443
    • /
    • 2015
  • Two phase sampling design is useful to increase estimation efficiency using deep stratification, improved non-response adjustment and reduced coverage bias. The same sampling units are commonly used for the first and the second phases in complex two-phase sampling design. In this paper we consider a sampling scheme where the first phase sampling units are clusters and the second phase sampling units are list samples. Using selected clusters in first phase requires that we list up elements in the selected clusters from the first phase and then use the list as a secondary sampling frame for the second phase sampling design. Then we select second phase samples from the listed sampling frame. We suggest an estimator based on the complex two-phase sampling design with different sampling units of each phase. Also the estimated variances of the estimator obtained by using classic and replication variance methods are considered and compared using simulation studies. For real data analysis, 2010 Korea Farm Household Economy Survey (KFHES) and 2011 Korea Agriculture Survey (KAS) are used.

Analysis of Improvement Methods of Safety Management Guidelines with Design for Safety

  • Kim, Minjung;Park, Moonseo;Lee, hyun-soo;Lee, Dowan;Lee, seul bi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.602-603
    • /
    • 2015
  • Despite all efforts to reduce construction disaster, construction site accident rate has steadily increased in Korea since 2008. As a different approach from traditional research, there is a growing issue about design for safety concept to prevent construction disaster. The notion is that construction worker's safety need to be considered at design phase, not only at construction phase. Globally, the notion has been noted that to improve the safety of the worker and used in practice. However, in Korea, most of safety management guidelines are limited to construction phase. From recent statistics, only 1.4 percent of designer feel responsible for safety accident at construction site. In this circumstance, this research find out safety guidelines through literatures reviews and practical experience of safety management in other country which apply design for safety concept. Selected guidelines are verified by survey which is evaluated with risk, function, cost, time and aesthetic view categories. Through the survey, define guidelines which could be effectively applied in Korea. By using proposed safety guidelines for design phase, preventing construction accident and improving designer's recognition of safety issue at design phase are expected.

  • PDF

A Study on the Design-Phase Checklist for Office Project Management (업무공간 프로젝트 매니지먼트의 디자인 단계 체크리스트 개발에 관한 연구)

  • Hwang, Hye-Jeong;Lyu, Ho-Chang
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.5
    • /
    • pp.208-216
    • /
    • 2012
  • The importance of applying project management in interior design has been increased due to recent changes in construction business environment along with market opening which demands more systematized and organized project management system. Yet, project management has not been utilized for interior design industry in Korea. This study intends to define the concept of project management in interior design, categorize tasks of each phase in office design project, and establish a table of elements which should be considered in each task. The table can be utilized as a checklist at the designing site. An in-depth analysis was conducted on the tasks in the Designing phase. In short, this study demonstrates five management phases and nine tasks. The differentiated checklist for office design is discussed in the project management of the Design phase. The checklist established in this study can be used as a practical guideline not only for the clients who are not familiar with management of design project, but also for existing project managers and interior designers. Further studies on management of design projects and development of checklist other than office design is needed.

  • PDF

Application Period and Participants for Construction Engineering at the Design Phase in Tall Building Construction (초고층 건축공사 설계단계에서의 시공엔지니어링 업무 적용시기 및 수행주체 분석)

  • Lee, Jin Woong;Cho, Kyuman;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.179-180
    • /
    • 2017
  • In order to improve the constructability of tall building construction, there is increasing needs to derive the design output by performing construction engineering at the design phase. It contributes to minimizing wastes such as design changes and reworks as well as improving project performance. Therefore, in this study, we analyzed the application period and participants for engineering tasks derived from a previous study, and then regrouped to efficiently reflect them at the design phase. Considering similarity of application period and attributes, the existing 22 engineering tasks, which were classified into 5 factors, were reclassified into 13 groups. The results of this study can be used as basic data for efficient construction engineering execution at the design phase.

  • PDF