Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

A CBR-BASED COST PREDICTION MODEL FOR THE DESIGN PHASE OF PUBLIC MULTI-FAMILY HOUSING CONSTRUCTION PROJECTS

  • TaeHoon Hong;ChangTaek Hyun;HyunSeok Moon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.203-211
    • /
    • 2009
  • Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.

  • PDF

A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage - (설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 -)

  • Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

Knowledge Management System for Machine Tools Design (공작기계 설계를 위한 지식 관리 시스템)

  • Jung, Seung-Hwan;Kang, Mu-Jin
    • IE interfaces
    • /
    • v.13 no.1
    • /
    • pp.60-64
    • /
    • 2000
  • Faced with increasing competitive pressures to reduce time-to-market, many business organizations have recognized that shortening the design cycle by taking full advantage of their intellectual property is inevitable in maintaining their market share. This paper describes a knowledge management system for machine tool design. Product structuring, change management, and complex design knowledge management are possible through the developed system. The system can speed up the design process by making necessary data instantly available as it is needed and keeping track of all the relevant design information and knowledge including individual decisions, design intentions, documents, and drawings.

  • PDF

Research Integrated Change Process for Configuration Management of Construction Nuclear Power Plant (건설원전 형상관리를 위한 통합변경프로세스 연구)

  • Park, Youjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.231-232
    • /
    • 2016
  • Configuration Management (CM) is a process of identifying and documenting the characteristics of a Structures, Systems and Components (SSCs), and of ensuring that changes to these characteristics are properly assessed, approved, issued, implemented and verified. There are requirement management, change control, facility configuration information management for CM activities. In order to improve safety of Nuclear Power Plant(NPP), it is necessary to manage change item systematically. Existing CM concept is focused on the NPP in operation. On the other hand, NPP under construction is difficult to efficiently manage the change because of different change process from varoius stake-holders. This research considers method of consolidation change process for NPP to ensure that approved changes are accurately reflected in the design requirements, facility configuration information, and the physical configuration.

  • PDF

Decision Making Process for Alternative Selection of Proper Design Change in Construction Project (적정 설계변경안 선정을 위한 의시결정 지원 프로세스)

  • Lee, Jong-Sik;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.74-82
    • /
    • 2010
  • A government agency has been announced to increase 23,663 hundred million wons by cost of design change which occurred in the pre-construction and construction phase. As design change is a phenomenon to occur by means of a characteristic of the building design that standardization is difficult, even if it is said that a perfect design is done in design phase, design change is prevented, and it is going to decrease, and there is a limit. Because there are some causes in all of the construction project, it is change order of client, relative system, unfit design and field condition, etc. In this study, we are suggested logic and basic model of the decision making support process model that it should selecting the optimal alternative through complex and quantitative analyzed: that is cost, performance and constructability as respect Owner or CMr is executing project under the CM delivery system construction project which it occurred design change.

Quality Management in a Manufacturing Environment using a 3D Printer (3D 프린터를 이용한 제조 환경에서의 품질경영)

  • Son, Eun-Il;Song, Hae-Keun;Lim, Sung-Uk
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.2
    • /
    • pp.145-152
    • /
    • 2014
  • Purpose: As the number of people directly employed in making things declines, the cost of labour as a proportion of the cost of production and delivery will diminish too. This will make to move the focus of quality management because new manufacturing techniques make it cheaper and faster to respond to changing local tastes Methods: This discussion is induced by understanding that change the point of view of quality. Results: Mark-processing method using a mold of 3D-printer is different from traditional manufacturing methods. Design, rapid prototyping of products produced by the right way, many changes in many industries will be created. Therefore, the design will be more emphasis on the importance of quality. Conclusion: As manufacturing goes digital, a Quality great change is now gathering pace. It will allow things to be made economically in much smaller numbers, more flexibly and with a much lower input of labour, thanks to new materials, completely new processes such as 3D printing. So we must change the vantage point of quality, from process to Design, R&D, and Delivery.

A Classification and Coding System for the Design Information Management in Make-to-Order Manufacturing (수주생산에서의 설계정보 관리를 위한 부품분류와 코딩)

  • 이규용;김재균;문치웅
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.166-170
    • /
    • 1998
  • Classification and Coding(C&C) systems as a core of design information management have been accomplished by many studies in terms of design and manufacturing attribute based on Group Technology. Those are very difficult to apply in make-to-order(MTO) manufacturing because the environment of MTO has various characteristics of product, many licensors, engineering change, insufficiency of integrated management system for codes and so on. This paper presents a suitable C&C system to MTO manufacturing which consider management level and drawing.

  • PDF

The Design of the Workflow Management System for Engineering Change Approval (설계 변경 승인을 위한 Workflow Management System 설계)

  • Lee, Chang-Soo;Kim, Sunn-Ho
    • IE interfaces
    • /
    • v.12 no.1
    • /
    • pp.79-93
    • /
    • 1999
  • As most of information systems developed are data-centric rather than process-centric, it is difficult for users to understand and manage the system from the viewpoint of work processes. To resolve the problem of the data-centric design, we propose a new method to design WFMSs(Workflow Management Systems), which are focused on processes and modified from current information engineering methods. In this research, the drawing approval and engineering change approval process of a K manufacturing company has been analyzed as a sample process. This method takes two steps, i.e., process analysis and system design. In the prosess analysis, data and processes are analyzed, and functions and tasks are derived from the processes. In the system design, a data model for the operation of WFMS is designed, and based on this data model, build-time and run-time functions of WFMS are designed.

  • PDF

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.