• Title/Summary/Keyword: Design Validation

Search Result 1,286, Processing Time 0.024 seconds

An Analysis on Relations between Design Errors Detected during BIM-based Design Validation and the Impacts Using Logistic Regression (로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.264-265
    • /
    • 2017
  • This paper aims to analyze relations between design errors prevented by building information modeling (BIM)-based design validation and their impacts in order to identify critical consideration factors for successfully implementing BIM-based design validation in the architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to its causes and work types. The relations between causes and work types of design errors and project delay, cost overrun, low quality, and rework generation that can be caused by the errors are analyzed through conducting logistic regression. Characteristics of each design error are analyzed by conducting face-to-face interviews with practitioners in the two BIM-based projects. As the results, the impacts of design error causes on predicting project delay, cost overrun, low quality, and rework generation were the highest.

  • PDF

An Analysis of Design Errors Detected During BIM-based Design Validation - Case Studies in South Korea (BIM 설계 검토를 통해 발견된 설계 오류 분석 -한국 BIM 프로젝트 사례 분석)

  • Won, Jongsung;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.158-159
    • /
    • 2016
  • This paper aims to analyze design errors prevented by building information modeling (BIM)-based design validation to identify consideration factors for successfully implementing BIM-based design validation in the architecture, engineering, and construction (AEC) projects. More than 1,300 design errors detected by BIM-based design validation in three BIM-based projects in South Korea are categorized according to its causes, work types, and likelihoods to cause project delay and cost overrun. Each design error is analyzed by conducting face-to-face interviews with practitioners in the three projects.

  • PDF

A Study on the Statistical Model Validation using Response-adaptive Experimental Design (반응적응 시험설계법을 이용하는 통계적 해석모델 검증 기법 연구)

  • Jung, Byung Chang;Huh, Young-Chul;Moon, Seok-Jun;Kim, Young Joong
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.347-349
    • /
    • 2014
  • Model verification and validation (V&V) is a current research topic to build computational models with high predictive capability by addressing the general concepts, processes and statistical techniques. The hypothesis test for validity check is one of the model validation techniques and gives a guideline to evaluate the validity of a computational model when limited experimental data only exist due to restricted test resources (e.g., time and budget). The hypothesis test for validity check mainly employ Type I error, the risk of rejecting the valid computational model, for the validity evaluation since quantification of Type II error is not feasible for model validation. However, Type II error, the risk of accepting invalid computational model, should be importantly considered for an engineered products having high risk on predicted results. This paper proposes a technique named as the response-adaptive experimental design to reduce Type II error by adaptively designing experimental conditions for the validation experiment. A tire tread block problem and a numerical example are employed to show the effectiveness of the response-adaptive experimental design for the validity evaluation.

  • PDF

Validation of the Control Logic for Automated Material Handling System Using an Object-Oriented Design and Simulation Method (객체지향 설계 및 시뮬레이션을 이용한 자동 물류 핸들링 시스템의 제어 로직 검증)

  • Han Kwan-Hee
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.12 no.8
    • /
    • pp.834-841
    • /
    • 2006
  • Recently, many enterprises are installing AMSs(Automated Manufacturing Systems) for their competitive advantages. As the level of automation increases, proper design and validation of control logic is a imperative task for the successful operation of AMSs. However, current discrete event simulation methods mainly focus on the performance evaluation. As a result, they lack the modeling capabilities for the detail logic of automated manufacturing system controller. Proposed in this paper is a method of validation of the controller logic for automated material handling system using an object-oriented design and simulation. Using this method, FA engineers can validate the controller logic easily in earlier stage of system design, so they can reduce the time for correcting the logic errors and enhance the productivity of control program development Generated simulation model can also be used as a communication tool among FA engineers who have different experiences and disciplines.

Basic Principles of the Validation for Good Laboratory Practice Institutes

  • Cho, Kyu-Hyuk;Kim, Jin-Sung;Jeon, Man-Soo;Lee, Kyu-Hong;Chung, Moon-Koo;Song, Chang-Woo
    • Toxicological Research
    • /
    • v.25 no.1
    • /
    • pp.1-8
    • /
    • 2009
  • Validation specifies and coordinates all relevant activities to ensure compliance with good laboratory practices (GLP) according to suitable international standards. This includes validation activities of past, present and future for the best possible actions to ensure the integrity of non-clinical laboratory data. Recently, validation has become increasingly important, not only in good manufacturing practice (GMP) institutions but also in GLP facilities. In accordance with the guideline for GLP regulations, all equipments used to generate, measure, or assess data should undergo validation to ensure that this equipment is of appropriate design and capacity and that it will consistently function as intended. Therefore, the implantation of validation processes is considered to be an essential step in a global institution. This review describes the procedures and documentations required for validation of GLP. It introduces basic elements such as the validation master plan, risk assessment, gap analysis, design qualification, installation qualification, operational qualification, performance qualification, calibration, traceability, and revalidation.

A Strategy for Validation in Preliminary Design Stage using The Simulation of Model Behavior (모델 행동 양식의 시뮬레이션을 이용한 초기 디자인 검증 방법)

  • Shin, Seung-Hun;Park, Seung-Kyu;Choi, Kyung-Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.19 no.1
    • /
    • pp.153-160
    • /
    • 2010
  • Most part of errors in software development process are included during the stage of requirements definition and design. And correction or elimination of errors from those stages requires much more efforts and costs than those from the later part of software development process. However, despite of the importance of the validation of requirement definition and design stages, several kinds of problem have made it hard to be done successfully. Therefore, in this paper, we introduce a novel validation process for the preliminary design stage. The validation process is based on simulations of model and it can be used to validate requirements and model simultaneously. Models in the validation process will take only the behavior of software and be built on Ptolemy framework. The usability of our validation process is confirmed with a case study over DNS system environment. And the result of simulation shows well-known errors or vulnerabilities can be found with simulations of model which has the behavior of software. This means our validation process can be used as a process to validate requirements and models during the early stage of software development process.

Analytical Validation of the SDL Metrics Set (SDL 메트릭 집합의 분석적 검증)

  • Hong, Ui-Seok;Jeong, Myeong-Hui
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.4
    • /
    • pp.1112-1121
    • /
    • 2000
  • Design metrics that quantify the design phase play an important role in reducing system development cost because the problems in early phases of software development seriously affected the quality of the late products. Real-time systems such as telecommunication systems are so large that design quantification is more important in real-time system design. Although many metrics have been proposed, few of them are correctly validated. This paper revises the SDL metrics set proposed in earlier study [9] and perform an analytical validation o the metrics set. Axiomatic approach and dimensional analysis are used for metrics validation and the old metrics are revised ot satisfy the validation criteria.

  • PDF

Analysis of the Relations between Design Errors Detected during BIM-based Design Validation and their Impacts Using Logistic Regression (로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석)

  • Won, Jong-Sung;Kim, Jae-Yeo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.535-544
    • /
    • 2017
  • This paper analyzes the relations between design errors, prevented by building information modeling (BIM)-based design validation, and their impacts in order to identify critical consideration factors for implementing BIM-based design validation in architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to their causes (illogical error, discrepancy, and missing item) and work types (structure, architecture, and mechanical, electrical, and plumbing (MEP)). The probabilistic relations among the independent variables, including the causes and work types of design errors, and the dependent variables, including the project delays, cost overruns, low quality, and rework generation that can be caused by these errors, are analyzed using logistic regression. The characteristics of each design error are analyzed by means of face-to-face interviews with practitioners. According to the results, the impacts of design error causes in predicting the probability values of project delays, cost overruns, low quality, and rework generation were statistically meaningful.

Introduction to the Validation Module Design for CMDPS Baseline Products

  • Kim, Shin-Young;Chung, Chu-Yong;Ou, Mi-Lim
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.146-148
    • /
    • 2007
  • CMDPS (COMS Meteorological Data Processing System) is the operational meteorological products extraction system for data observed from COMS (Communication, Ocean and Meteorological Satellite) meteorological imager. CMDPS baseline products consist of 16 parameters including cloud information, water vapor products, surface information, environmental products and atmospheric motion vector. Additionally, CMDPS includes the function of calibration monitoring, and validation mechanism of the baseline products. The main objective of CMDPS validation module development is near-real time monitoring for the accuracy and reliability of the whole CMDPS products. Also, its long time validation statistics are used for upgrade of CMDPS such as algorithm parameter tuning and retrieval algorithm modification. This paper introduces the preliminary design on CMDPS validation module.

  • PDF

Fire design of concrete encased columns: Validation of an advanced calculation model

  • Zaharia, R.;Dubina, D.
    • Steel and Composite Structures
    • /
    • v.17 no.6
    • /
    • pp.835-850
    • /
    • 2014
  • The fire resistance of composite steel and concrete structures may be determined by using the simplified methods provided in EN 1994-1-2. For the particular situations not covered by the standard, an advanced calculation model might be applied, using special purpose programs for the analysis of structures in fire. The validation of these programs has always been an important issue for software developers, but also for designers and authorities. Clause 4.4.4 from EN 1994-1-2 refers to the validation of the advanced calculation models and states that these models must be validated through relevant test results. The paper presents the calculation of fire resistance of the composite columns in a high-rise building built in Romania, and focusses on the validation of the calculation model (computer program SAFIR), for this particular case. This validation, asked by the Romanian authorities, considers the available experimental results of a fire test, performed on a similar composite steel-concrete column.