• Title/Summary/Keyword: Design Flood Level

Search Result 129, Processing Time 0.024 seconds

Assessment of Flood Flow Conveyance for Urban Stream Using XP-SWMM (XP-SWMM을 이용한 도시하천에서의 홍수소통능력 평가)

  • Hong, Jun-Bum;Kim, Byung-Sik;Seoh, Byung-Ha;Kim, Hung-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.2 s.163
    • /
    • pp.139-150
    • /
    • 2006
  • In recent, increasing of the impervious area gives rise to short concentration time and high peak discharge comparing with natural watershed and it is a cause of urban flood damage. Therefore, we have performed for structural and non-structural plans to reduce the damage from inundation. The Gulpo-cheon basin had been frequently inundated and damaged due to the water level of Han river. So, the Gulpo-cheon floodway was constructed with 20 meters width for flood control in the basin but it was not enough for our expectation and now we have a plan to expand the floodway to 80 meters. We use a XP-SWMM model developed based on EPA-SWMM version for analyzing the capacity of flood conveyance by the expansion of Gulpo-cheon floodway with the same 100 years return period design storm and the same tidal conditions of the Yellow sea. The flood conveyance after the expansion of floodway becomes three times comparing it with before the expansion. Also we simulate the flood discharge at the diversion point of Gulpo-cheon for the expanded condition of floodway and know that the discharge of about 300 m3/sec is flowing backward to the expanded floodway. Therefore we may need some kinds of hydraulic structures to prevent the back water.

Estimating the compound risk integrated hydrological / hydraulic / geotechnical uncertainty of levee systems (수문·수리학적 / 지반공학적 불확실성을 고려한 제방의 복합위험도 산정)

  • Nam, Myeong Jun;Lee, Jae Young;Lee, Cheol Woo;Kim, Ki Young
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.4
    • /
    • pp.277-288
    • /
    • 2017
  • A probabilistic risk analysis of levee system estimates the overall level of flood risk associated with the levee system, according to a series of possible flood scenarios. It requires the uncertainty analysis of all the risk components, including hydrological, hydraulic and geotechnical parts computed by employing MCMC (Markov Chain Monte Carlo), MCS (Monte Carlo Simulation) and FOSM (First-Order Second Moment), presents a joint probability combined each probability. The methodology was applied to a 12.5 km reach from upstream to downstream of the Gangjeong-Goryeong weir, including 6 levee reaches, in Nakdong river. Overtopping risks were estimated by computing flood stage corresponding to 100/200 year high quantile (97.5%) design flood causing levee overflow. Geotechnical risks were evaluated by considering seepage, slope stability, and rapid drawdown along the levee reach without overflow. A probability-based compound risk will contribute to rising effect of safety and economic aspects for levee design, then expect to use the index for riverside structure design in the future.

Application of Urban Hydrologic Monitoring System for Urban Runoff Analysis (도시유출해석을 위한 도시수문 모니터링 기법 적용)

  • Seo, Kyu-Woo
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.5 no.2 s.17
    • /
    • pp.37-44
    • /
    • 2005
  • It reflects well feature of slope that is characteristic of urban river basin of Busan local. In this study, process various hydrological data and basin details data which is collected through basin basis data, hydrological monitoring system(EMS-DEU) and automatic water level equipment(AWS-DEU) for urban flood disaster prevention and use as basin input data of ILLUDAS, SWMM and HEC-HMS in order to examine outflow feature of experiment basin and then use in reservoir design of experiment basin through calibration and verification about HEC-HMS. Inserted design rainfall for 30 years that is design criteria of creek into HEC-HMS and then calculated design floods according to change aspect of the impermeable rate. Capacity of reservoir was determined on the outflow mass curve. Designed detention pond(volume $54,000m^3$) at last outlet upper stream of experiment basin, after designing reservoir. It could be confirmed that the peak flow was reduced resulting from examining outflow aspect. Designing reservoir must decrease outflow of urban areas.

Applying the Polder Levee of the Stream Specific by Using Hydordynamic Model (수치해석을 이용한 윤중제 흐름특성해석 적용성)

  • Choi, Han-Kuy;Kim, Jang-Uk;Baek, Hyo-Sun
    • Journal of Industrial Technology
    • /
    • v.28 no.B
    • /
    • pp.193-198
    • /
    • 2008
  • When the existing polder levee was constructed, the river's numerical analysis decided the bank raise by applying the planned flood stage or by using the result from the sectional 1st dimensional numerical analysis. But, it was presented that there is a limitation in the 1st dimensional value analysis when the structure like the polder levee obstructs the special shaped running water flow. Therefore, in order to verify the numerical value applicability when the polder levee is constructed, this report compared each other through the 1st and 2nd dimensional numerical analysis and the mathematical principle model laboratory. In case of the polder levee construction through the numerical analysis and the mathematical principle model laboratory, it was decided that there was no big problem in the 1st dimensional numerical analysis applied design, considering the uncertainty of mathematical principle analysis though the first dimensional numerical analysis was calculated a little bigger than the second. But, after construction, it was found that the water level deviation of the 1st, 2nd occurred biggest at the place where the flow was divided into two. Also, as a result of comparing the 1st, 2nd dimensional numerical analysis with the mathematical principle model laboratory, it was confirmed that the 1st numerical analysis applied design decreased the modal safety largely, as the left side water level was calculated smaller more than 0.5m in case of the 1st dimensional numerical analysis.

  • PDF

A Comparison and Analysis of the Levee Height Determination Methods in Korea and the USA (우리나라와 미국의 제방고 산정 기법에 대한 비교 분석)

  • Kang, Tae-Uk;Lee, Sang-Ho;Yu, Kwon-Kyu
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.6
    • /
    • pp.497-510
    • /
    • 2011
  • A levee height is determined by adding a deterministic freeboard to a flood water level in Korea. In the USA, a levee height is determined by choosing a value conditionally among the freeboard criteria and the levels resulted from a probabilistic method. The probabilistic method adopts a conditional non-exceedance probability (CNP) which is the probability that the target stage will not be exceeded given a specific flood event. The purpose of the study is to compare Korean criterion for levee height estimation with that of the USA. Levee heights were determined according to the above two criteria at twenty-five cross sections in five streams. The results show that Korean criterion on average yields levee heights 20 cm higher than those calculated by the criterion of the USA. The larger the flood discharges become, the higher the levee height differences are usually. It is caused by the freeboard estimation criterion of Korea that the larger design flood is, the higher freeboard is given. Korean criterion, however, resulted in lower levee heights for smaller streams than those by the criterion of the USA. To sum it up, the Korean levee height criteria can result in overestimation or underestimation depending on flood discharge amount, being compared with the criteria of the USA. The Korean freeboard especially needs to be increased for smaller flood discharges.

Comparison of the flow estimation methods through GIUH rainfall-runoff model for flood warning system on Banseong stream (반성천 홍수경보 시스템을 위한 GIUH기반 한계홍수량 산정기법 비교연구)

  • Seong, Kiyoung;Ahn, Yujin;Lee, Taesam
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.5
    • /
    • pp.347-354
    • /
    • 2021
  • In the past few years, various damages have occurred in the vicinity of rivers due to flooding. In order to alleviate such flood damage, structural and non-structural measures are being established, and one of the important non-structural measures is to establish a flood warning system. In general, in order to establish a flood warning system, the water level of the flood alarm reference point is set, the critical flow corresponding thereto is calculated, and the warning precipitation amount corresponding to the critical flow is calculated through the Geomorphological Instantaneous Unit Hydrograph (GIUH) rainfall-runoff model. In particular, when calculating the critical flow, various studies have calculated the critical flow through the Manning formula. To compare the adequacy of this, in this study, the critical flow was calculated through the HEC-RAS model and compared with the value obtained from Manning's equation. As a result of the comparison, it was confirmed that the critical flow calculated by the Manning equation adopted excessive alarm precipitation values and lead a very high flow compared to the existing design precipitation. In contrast, the critical flow of HEC-RAS presented an appropriate alarm precipitation value and was found to be appropriate to the annual average alarm standard. From the results of this study, it seems more appropriate to calculate the critical flow through HEC-RAS, rather than through the existing Manning equation, in a situation where various river projects have been conducted resulting that most of the rivers have been surveyed.

The Study on Hydraulic Model Experiment of Discharge Channel and Spillway (여수토 방수로의 수리모형검시에 관한 연구)

  • 김시원
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.8 no.2
    • /
    • pp.1124-1140
    • /
    • 1966
  • 'This hydraulic experiment have been practised Juk an Reservoir spillway and discharge 'channel which the province Kyong Buk was constructed and designed U. hook, for seizing all state of hydraulic. As result of the experimellt planning and making the model test, it has gained the necessary data at the amendment, projection of the most rational and economical result. 1. Project (1) Experiment project....1/30 of the discharge (2) project flood....0.01945 $m^3$/sec (rapidly) 2. Design Experiment It were sighted the water level for the nine point (L. & R. sides of No. O, L. & R. of No.1, L. side of NO.2, NO.3, No. 4 and NO.5), but it appeared each other that the lowest water level was 0.63 m at spillway (No.5) and the highest water level 0.735m less than planning water level O.75 m at No. 0. It was regarded as the phenomena appearing the difference from the calculation of the rational formular and coefficient of discharge. 3. Experiment examine E. ${\circled1}$ As a table (2) it had not a difference in comparision with design and was some lower value than design experiment's. E ..${\circled2}$) !twas same table (3) in a consequence of Experiment contracted Rocky cutting. E.${\circled3}$. ${\circled4}$ It was done amend.ment Experiment by elevating G.H. in only control point, but was not sure result as a table (2)(3)(4), and so it was changed largely in ${\circled5}$ Experiment. E. ${\circled5}$ Increasing water level was understanded to be proportion to $V^2$ in consideration of centrifugal force in the curve part and showed velocity contracting in curve the effect order's being regular in consequence of 1/6 sloped extending G.H. attached from 5 No. 0 to 1. 50 m, to S No. 0+5m. (S; discharge channel number).

  • PDF

Numerical Simulation for River Safety of Saemangeum Basin according to Master Plan (새만금 종합개발계획에 따른 새만금 유역 치수 안전성 수치모의)

  • Jeong, Seok il;Yoo, Hyung Ju;Ryu, Kwang Hyun;Lee, Seung Oh
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.5
    • /
    • pp.127-133
    • /
    • 2018
  • The Saemangeum master plan includes dredging and waterproofing materials, construction projects that can change the hydraulic characteristics of the Saemangeum and Mangyeong and Dongjin River basins. In this study, the river safety of 2030 when the Saemangeum master plan was completed for 100 year frequency, 500 year frequency and 100 year frequency applied RCP 8.5 scenario was examined using Delft3D. As a result of the analysis, it was confirmed that there was no overflowing point at the 100 year frequency, but the difference between the flood level and the river bank elevation was relatively small at the curved and river joint part. At the 100-year frequency with the 500-year frequency and the RCP 8.5 scenario, the possibility of overflowing at several locations was confirmed. The possibility of river bed loss due to fast velocity appears in the upstream part of Mankyung River and it is necessary to monitor the safety of hydraulic structures continuously. In addition, it is expected that the expansion of the area showing the characteristics of the lake due to dredging will affect the sediment mechanism and water quality, so detailed and diverse studies will be needed.

Design of Seawall at Jang-Hang Area (군장국가산단(장항지구) 호안 설계)

  • Kwon, O-Gi;Ko, Jang-Hee;Nam, Se-Hyun;Kim, Seong-Goo
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.399-402
    • /
    • 2007
  • This project is the 1st. stage for the foreshore reclamation at Jang-Hang area and its scope is to construct a seawall as outer facilities, road adjacent to the seawall and drainage gate. for the safe protections of the facilities at the reclaimed land hereafter, we adopted the mild slope rubble mound type for the seawall structure which was excellent in interrupting the wave overtopping, as a result of numerical & hydraulic model test about alternative 4 sections. For the flooding prevention of the reclaimed land, we planned the drainage system that could make the flood water level lower than the reclaimed land level. Also, we planned the eco-friendly waterfront area with 8 nature themes through the whole seawall sections.

  • PDF

Determination of Surge Tank Scale for Dam Safety Management (댐 안전관리를 위한 조압수조의 규모 결정)

  • Lee, Ho Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.2
    • /
    • pp.164-174
    • /
    • 2007
  • Phenomena of hydraulic transient such as water hammer should be analyzed to design the pipeline systems effectively in dam. Surge tanks generally are used to reduce change in pressure caused by hydraulic transient from load changes on the turbines. In this study, the appropriate scale of surge tank with chamber is investigated for dam safety management. The variation of water level in the surge tank are computed using governing equation. Using the Thoma-Jaeger's stability condition, static and dynamic stability are investigate for the cases of flood water level, normal high water level, rated water level and low water level. Finally appropriate diameters of shaft and chamber are determined in the surge tank with chamber.