Design of Seawall at Jang-Hang Area
군장국가산단(장항지구) 호안 설계
- Published : 2007.02.22
Abstract
This project is the 1st. stage for the foreshore reclamation at Jang-Hang area and its scope is to construct a seawall as outer facilities, road adjacent to the seawall and drainage gate. for the safe protections of the facilities at the reclaimed land hereafter, we adopted the mild slope rubble mound type for the seawall structure which was excellent in interrupting the wave overtopping, as a result of numerical & hydraulic model test about alternative 4 sections. For the flooding prevention of the reclaimed land, we planned the drainage system that could make the flood water level lower than the reclaimed land level. Also, we planned the eco-friendly waterfront area with 8 nature themes through the whole seawall sections.