• Title/Summary/Keyword: Demand Forecasts

Search Result 120, Processing Time 0.038 seconds

A Study on Predicting the demand for Public Shared Bikes using linear Regression

  • HAN, Dong Hun;JUNG, Sang Woo
    • Korean Journal of Artificial Intelligence
    • /
    • v.10 no.1
    • /
    • pp.27-32
    • /
    • 2022
  • As the need for eco-friendly transportation increases due to the deepening climate crisis, many local governments in Korea are introducing shared bicycles. Due to anxiety about public transportation after COVID-19, bicycles have firmly established themselves as the axis of daily transportation. The use of shared bicycles is spread, and the demand for bicycles is increasing by rental offices, but there are operational and management difficulties because the demand is managed under a limited budget. And unfortunately, user behavior results in a spatial imbalance of the bike inventory over time. So, in order to easily operate the maintenance of shared bicycles in Seoul, bicycles should be prepared in large quantities at a time of high demand and withdrawn at a low time. Therefore, in this study, by using machine learning, the linear regression algorithm and MS Azure ML are used to predict and analyze when demand is high. As a result of the analysis, the demand for bicycles in 2018 is on the rise compared to 2017, and the demand is lower in winter than in spring, summer, and fall. It can be judged that this linear regression-based prediction can reduce maintenance and management costs in a shared society and increase user convenience. In a further study, we will focus on shared bike routes by using GPS tracking systems. Through the data found, the route used by most people will be analyzed to derive the optimal route when installing a bicycle-only road.

Forecasting Passenger Transport Demand Using Seasonal ARIMA Model - Focused on Joongang Line (계절 ARIMA 모형을 이용한 여객수송수요 예측: 중앙선을 중심으로)

  • Kim, Beom-Seung
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.307-312
    • /
    • 2014
  • This study suggested the ARIMA model taking into consideration the seasonal characteristic factor as a method for efficiently forecasting passenger transport demand of the Joongang Line. The forecasting model was built including the demand for the central inland region tourist train (O-train, V-train), which was opened to traffic in April-, 2013 and run in order to reflect the recent demand for the tourism industry. By using the monthly time series data (103) from January-, 2005 to July-, 2013, the optimum model was selected. The forecasting results of passenger transport demand of the Joongang Line showed continuous increase. The developed model forecasts the short-term demand of the Joongang Line.

A Multiple Variable Regression-based Approaches to Long-term Electricity Demand Forecasting

  • Ngoc, Lan Dong Thi;Van, Khai Phan;Trang, Ngo-Thi-Thu;Choi, Gyoo Seok;Nguyen, Ha-Nam
    • International journal of advanced smart convergence
    • /
    • v.10 no.4
    • /
    • pp.59-65
    • /
    • 2021
  • Electricity contributes to the development of the economy. Therefore, forecasting electricity demand plays an important role in the development of the electricity industry in particular and the economy in general. This study aims to provide a precise model for long-term electricity demand forecast in the residential sector by using three independent variables include: Population, Electricity price, Average annual income per capita; and the dependent variable is yearly electricity consumption. Based on the support of Multiple variable regression, the proposed method established a model with variables that relate to the forecast by ignoring variables that do not affect lead to forecasting errors. The proposed forecasting model was validated using historical data from Vietnam in the period 2013 and 2020. To illustrate the application of the proposed methodology, we presents a five-year demand forecast for the residential sector in Vietnam. When demand forecasts are performed using the predicted variables, the R square value measures model fit is up to 99.6% and overall accuracy (MAPE) of around 0.92% is obtained over the period 2018-2020. The proposed model indicates the population's impact on total national electricity demand.

Robust Capacity Planning in Network Coding under Demand Uncertainty

  • Ghasvari, Hossien;Raayatpanah, Mohammad Ali
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.8
    • /
    • pp.2840-2853
    • /
    • 2015
  • A major challenge in network service providers is to provide adequate resources in service level agreements based on forecasts of future demands. In this paper, we address the problem of capacity provisioning in a network subject to demand uncertainty such that a network coded multicast is applied as the data delivery mechanism with limited budget to purchase extra capacity. We address some particular type of uncertainty sets that obtain a tractable constrained capacity provisioning problem. For this reason, we first formulate a mathematical model for the problem under uncertain demand. Then, a robust optimization model is proposed for the problem to optimize the worst-case system performance. The robustness and effectiveness of the developed model are demonstrated by numerical results. The robust solution achieves more than 10% reduction and is better than the deterministic solution in the worst case.

Probabilistic Generation Modeling in Electricity Markets Considering Generator Maintenance Outage (전력시장의 발전기 보수계획을 고려한 확률적 발전 모델링)

  • Kim Jin-Ho;Park Jong-Bae
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.8
    • /
    • pp.418-428
    • /
    • 2005
  • In this paper, a new probabilistic generation modeling method which can address the characteristics of changed electricity industry is proposed. The major contribution of this paper can be captured in the development of a probabilistic generation modeling considering generator maintenance outage and in the classification of market demand into multiple demand clusters for the applications to electricity markets. Conventional forced outage rates of generators are conceptually combined with maintenance outage of generators and, consequently, effective outage rates of generators are newly defined in order to properly address the probabilistic characteristic of generation in electricity markets. Then, original market demands are classified into several distinct demand clusters, which are defined by the effective outage rates of generators and by the inherent characteristic of the original demand. We have found that generators have different effective outage rates values at each classified demand cluster, depending on the market situation. From this, therefore, it can be seen that electricity markets can also be classified into several groups which show similar patterns and that the fundamental characteristics of power systems can be more efficiently analyzed in electricity markets perspectives, for this classification can be widely applicable to other technical problems in power systems such as generation scheduling, power flow analysis, price forecasts, and so on.

Modeling Generators Maintenance Outage Based on the Probabilistic Method (발전기 보수정지를 고려한 확률적 발전모델링)

  • Kim, Jin-Ho;Park, Jong-Bae;Park, Jong-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.804-806
    • /
    • 2005
  • In this paper, a new probabilistic generation modeling method which can address the characteristics of changed electricity industry is proposed. The major contribution of this paper can be captured in the development of a probabilistic generation modeling considering generator maintenance outage and in the classification of market demand into multiple demand clusters for the applications to electricity markets. Conventional forced outage rates of generators are conceptually combined with maintenance outage of generators and, consequently, effective outage rates of generators are new iy defined in order to properly address the probabilistic characteristic of generation in electricity markets. Then, original market demands are classified into several distinct demand clusters, which are defined by the effective outage rates of generators and by the inherent characteristic of the original demand. We have found that generators have different effective outage rates values at each classified demand cluster, depending on the market situation. From this, therefore, it can be seen that electricity markets can also be classified into several groups which show similar patterns and that the fundamental characteristics of power systems can be more efficiently analyzed in electricity markets perspectives, for this classification can be widely applicable to other technical problems in power systems such as generation scheduling, power flow analysis, price forecasts, and so on.

  • PDF

Cluster Analysis of Daily Electricity Demand with t-SNE

  • Min, Yunhong
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.5
    • /
    • pp.9-14
    • /
    • 2018
  • For an efficient management of electricity market and power systems, accurate forecasts for electricity demand are essential. Since there are many factors, either known or unknown, determining the realized loads, it is difficult to forecast the demands with the past time series only. In this paper we perform a cluster analysis on electricity demand data collected from Jan. 2000 to Dec. 2017. Our purpose of clustering on electricity demand data is that each cluster is expected to consist of data whose latent variables are same or similar values. Then, if properly clustered, it is possible to develop an accurate forecasting model for each cluster separately. To validate the feasibility of this approach for building better forecasting models, we clustered data with t-SNE. To apply t-SNE to time series data effectively, we adopt the dynamic time warping as a similarity measure. From the result of experiments, we found that several clusters are well observed and each cluster can be interpreted as a mix of well-known factors such as trends, seasonality and holiday effects and other unknown factors. These findings can motivate the approaches which build forecasting models with respect to each cluster independently.

The Artificial Neural Network based Electric Power Demand Forecast using a Season and Weather Informations (계절 및 날씨 정보를 이용한 인공신경망 기반 전력수요 예측 알고리즘 개발)

  • Kim, Meekyeong;Hong, Chuleui
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.53 no.1
    • /
    • pp.71-78
    • /
    • 2016
  • This paper proposes the new electric power demand forecast model which is based on an artificial neural network and considers time and weather factors. Time factors are selected by measuring the autocorrelation coefficients of load demand in summer and winter seasons. Weather factors are selected by using Pearson correlation coefficient The important weather factors are temperature and dew point because the correlation coefficients between these factors and load demand are much higher than those of the other factors such as humidities, air pressures and wind speeds. The experimental results show that the proposed model using time and seasonal weather factors improves the load demand forecasts to a great extent.

MAGRU: Multi-layer Attention with GRU for Logistics Warehousing Demand Prediction

  • Ran Tian;Bo Wang;Chu Wang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.18 no.3
    • /
    • pp.528-550
    • /
    • 2024
  • Warehousing demand prediction is an essential part of the supply chain, providing a fundamental basis for product manufacturing, replenishment, warehouse planning, etc. Existing forecasting methods cannot produce accurate forecasts since warehouse demand is affected by external factors such as holidays and seasons. Some aspects, such as consumer psychology and producer reputation, are challenging to quantify. The data can fluctuate widely or do not show obvious trend cycles. We introduce a new model for warehouse demand prediction called MAGRU, which stands for Multi-layer Attention with GRU. In the model, firstly, we perform the embedding operation on the input sequence to quantify the external influences; after that, we implement an encoder using GRU and the attention mechanism. The hidden state of GRU captures essential time series. In the decoder, we use attention again to select the key hidden states among all-time slices as the data to be fed into the GRU network. Experimental results show that this model has higher accuracy than RNN, LSTM, GRU, Prophet, XGboost, and DARNN. Using mean absolute error (MAE) and symmetric mean absolute percentage error(SMAPE) to evaluate the experimental results, MAGRU's MAE, RMSE, and SMAPE decreased by 7.65%, 10.03%, and 8.87% over GRU-LSTM, the current best model for solving this type of problem.

Modeling Planned Maintenance Outage of Generators Based on Advanced Demand Clustering Algorithms (개선된 수요 클러스터링 기법을 이용한 발전기 보수정지계획 모델링)

  • Kim, Jin-Ho;Park, Jong-Bae
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.4
    • /
    • pp.172-178
    • /
    • 2006
  • In this paper, an advanced demand clustering algorithm which can explore the planned maintenance outage of generators in changed electricity industry is proposed. The major contribution of this paper can be captured in the development of the long-term estimates for the generation availability considering planned maintenance outage. Two conflicting viewpoints, one of which is reliability-focused and the other is economy-focused, are incorporated in the development of estimates of maintenance outage based on the advanced demand clustering algorithm. Based on the advanced clustering algorithm, in each demand cluster, conventional effective outage of generators which conceptually capture maintenance and forced outage of generators, are newly defined in order to properly address the characteristic of the planned maintenance outage in changed electricity markets. First, initial market demand is classified into multiple demand clusters, which are defined by the effective outage rates of generators and by the inherent characteristic of the initial demand. Then, based on the advanced demand clustering algorithm, the planned maintenance outages and corresponding effective outages of generators are reevaluated. Finally, the conventional demand clusters are newly classified in order to reflect the improved effective outages of generation markets. We have found that the revision of the demand clusters can change the number of the initial demand clusters, which cannot be captured in the conventional demand clustering process. Therefore, it can be seen that electricity market situations, which can also be classified into several groups which show similar patterns, can be more accurately clustered. From this the fundamental characteristics of power systems can be more efficiently analyzed, for this advanced classification can be widely applicable to other technical problems in power systems such as generation scheduling, power flow analysis, price forecasts, and so on.