Kim Sung-Kyun;Park Hee-Sung;Lee Kune-Woo;Jung Chong-Hun
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.4
no.3
/
pp.265-273
/
2006
In the decommissioning and decontamination(D&D) planning stage, it is important that the scenarios are evaluated from an engineering point of views because the decommissioning work has to be executed economically and safely by following the best scenarios. Therefore, we need to develope several modules to evaluate the decommissioning scenarios. In this paper, the digital mock-up system is constructed in the virtual space to simulate the whole decommissioning process. The schedule evaluating equation and cost evaluation equation are derived to calculate the working time and the expected cost. And in order to easily identify the radiation level about the activated objects, the radiation visualization module is developed. Finally, on the basis of the obtained results from the Digital Mock-up and other important factors, the evaluating method of the scenarios that can indicate the best scenario is described.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.16
no.4
/
pp.441-454
/
2018
Since the permanent shutdown of Kori Unit 1 in 2017, a full-scale decommissioning project for a commercial nuclear reactor has been approaching. It is estimated that about 160,000 t of low-activity concrete waste will be produced from decommissioning of one unit of this commercial nuclear power reactor. Accordingly, it is necessary to review whether the effectiveness of the current regulatory framework for clearance waste (i.e. waste stream that meets activity concentration guidelines or dose criteria for clearance set forth in NSSC Notice No. 2017-65) can be maintained for the clearance of a bulk amount of concrete waste. In this regard, the IAEA SRS No. 44, which was used as a basis for revision of the Korean clearance regulations, is thoroughly analyzed and the radiological effects from four different clearance scenarios, along with input values and parameters derived from industrial practices in Korea, were evaluated. Though it is shown that the maximum annual dose from most recycling scenarios will be less than the clearance dose criterion for the normal scenario (i.e. an order of magnitude of $0.01mSv{\cdot}y^{-1}$), the radiation dose, estimated with conservative assumptions for the banking scenario, may exceed the above clearance dose criteria. Therefore, for safe and sustainable clearance of the bulk amount of concrete waste, it is required to diversify the concrete waste processors, perform more detailed site-specific assessment, and apply limiting conditions to the banking scenario.
Proceedings of the Korean Radioactive Waste Society Conference
/
2004.06a
/
pp.52-57
/
2004
In order to analyze key parameters of important radionuclides in dose evaluation model of decommissioning site, a sensitivity analysis was performed. This analysis assumed a resident farmer for an exposure scenario and 0.037Bq/g for the concentration of radionuclides. As a result of sensitivity analysis, the key parameters of radionuclides considered were the area of contaminated zone, external gamma shielding factor and indoor time fraction for Cs-137 and Co-60. The key parameters for C-14 were the environmental parameters and hydrological parameters of unsaturated zone. Also, the key parameter for Sr-90 was the density of contaminated zone.
Park, Sang June;Byon, Jihyang;Ban, Doo Hyun;Lee, Suhee;Sohn, Wook;Ahn, Seokyoung
Nuclear Engineering and Technology
/
v.52
no.6
/
pp.1231-1242
/
2020
The Kori Unit 1 will be decommissioned after a permanent shutdown in June 2017. South Korea has a 0.1 mSv/yr exposure limit standard for limited or unlimited site release. This is South Korea's first commercial NPP; therefore, if the containment building is reused as a memorial hall, it will contribute to the improvement of public understanding and enhance the public's acceptance of NPPs. Also, existing Kori Unit 1 nuclear power plant manpower resources can be reused after decommissioning and resident staff and memorial hall visitors can activate nearby commercial areas. Therefore, such a reuse scenario may also prevent an economic recession. The exposure dose was calculated using the following scenarios: worker in the containment building, visitor in the containment building, and worker in buildings other than the containment building. The exposure dose in the buildings was calculated by the RESRAD-BUILD developed by the Argonne National Laboratory (ANL). The preliminary exposure dose and derived concentration guideline level (DCGL) were derived.
Hyung-Woo Seo;Gang-Woo Ryu;Young-Il Na;Chan-Geun Park;Jin-Won Son;Cheon-Woo Kim
Nuclear Engineering and Technology
/
v.56
no.8
/
pp.3359-3368
/
2024
In the calculation of DCGLs using RESRAD code, the selection of input parameter values is paramount, which is basically possible when specific measures for selecting reuse scenarios and probabilistic evaluation methods are established. When referring to the impact of the age group considered in the environmental impact assessment among the existing operations of the plant, it may also need to be applied in the decommissioning project, and there will be considerations along with site reuse scenarios and probabilistic evaluations. Therefore, the main purpose of this study is to distinguish the types of exposure affected by residual radioactivity contamination during the process of deriving DCGL to be used in the final site release stage of NPPs and to evaluate them by reasonably assigning age group parameter values. In addition, the case of entering a single value for parameter values by age group and the case of entering probabilistic distributions were compared and analyzed.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.15
no.4
/
pp.355-367
/
2017
The decommissioning of Kori unit 1, which was permanently shut down in June of 2017, will be the first instance of the dismantling of a commercial nuclear power plant in Korea. The disposal of waste during the dismantling process accounts for a large part of the total decommissioning cost. Therefore, structures consisting of activated and contaminated concrete must be economically and safely dismantled by establishing a proper dismantling strategy. This study focuses on optimized dismantling and disposal scenarios pertaining to a biological shield. Several dismantling cases, regulations and technologies related to waste treatment as these practices pertain to nuclear power plants are analyzed. To minimize the amount of waste from the biological shield dismantling process, an optimized dismantling scenario is presented and disposal alternatives for dismantled concrete waste are proposed.
In the research or project planning for the decommissioning of a nuclear power plant, one of several preparations will be the establishment of a list of potential radionuclides to be considered at the time of characterization or final status surveys. Reliable data for selection of potential radionuclides during the transition period to prepare for decommissioning will depend heavily on historical data at the site or, where possible, sampling analysis. However, during the transition period, direct sampling can be challenging, depending on the circumstances of the site or national regulation. A methodology of selecting potential radionuclides for nuclear facility sites which largely consists of three major processes: production of initial list of radionuclides, selection of the insignificant radionuclide that will be eliminated, and consideration of site characterization or sampling. For developing a preliminary list of potential radionuclides for Kori Unit 1 decommissioning, the list of initial radionuclides was made referring to the technical documents applied at decommissioned NPPs in the U.S and additional reference materials applied until the operation of NPPs in Korea. For the screening of insignificant radionuclides, we applied criterion of less than 0.1% of the amount of radioactivity inventory and confirmed the dose fraction using the RESRAD code. The final suit of radionuclides was established, which should be supplemented by reflecting site characterization and sampling process in the future. Thus, the methodology and results for the selection of potential radionuclides suggested in this paper can give an insight as a future reference to deriving DCGLs in relation to site remediation of decommissioning nuclear plants.
We analyze economic effects of GHG reduction measures of the generation industry to meet 2030 GHG reduction target using the scenario based approach. We estimate the GHG emission of the Korean power industry in 2030 based on both the $7^{th}$ Electricity Supply & Demand Plan and the GHG emission coefficients issued by IAEA. We set up three scenarios for reduction measures by replacing the coal fired plants with nuclear power, renewable energy and carbon capture and storage. Once and for all, the nuclear power scenario dominates the other energy technologies in terms of GHG reduction quantities and economic effects.
The Kori Unit 1 nuclear power plant, which is planned to be dismantled after permanent shutdown, is expected to generate a large amount of various types of radioactive waste during the dismantling process. For the disposal of Very-low-level waste, which is expected to account for the largest amount of generation, the Korea Radioactive waste Agency (KORAD) is in the process of detailed design to build a 3-phase landfill disposal facility in Gyeongju. In addition, a large container is being developed to efficiently dispose of metal and concrete waste, which are mainly generated as Very low-level waste of decommissioning. In this study, based on the design characteristics of the 3-phase landfill disposal facility and the large container under development, radiation exposure dose evaluation was performed considering the normal and accident scenarios of radiation workers during operation. The direct exposure dose evaluation of workers during normal operation was performed using the MCNP computer program, and the internal and external exposure dose evaluation due to damage to the decommissioning waste package during a drop accident was performed based on the evaluation method of ICRP. For the assumed scenario, the exposure dose of worker was calculated to determine whether the exposure dose standards in the domestic nuclear safety act were satisfied. As a result of the evaluation, it was confirmed that the result was quite low, and the result that satisfied the standard limit was confirmed, and the radiational disposal suitability for the 3-phase landfill disposal facility of the large container for dismantled radioactive waste, which is currently under development, was confirmed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.