• Title/Summary/Keyword: Decommissioning

Search Result 461, Processing Time 0.027 seconds

Development of the draft guidelines of the decommissioning plan for a nuclear power plant in Korea (국내 원자로시설 해체계획서 세부 작성지침(안) 개발)

  • Lee, Jungmin;Moon, Joohyun
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.11 no.3
    • /
    • pp.213-227
    • /
    • 2013
  • It is essential to prepare the decommissioning plan for a nuclear power plant (NPP) for the safe decommissioning of the NPP, minimization of the generation of decommissioning wastes, and protection of human beings and environment. Although Kori unit 1 and Wolsong unit 1 will be destined to their decommissioning in Korea in the near future. there is no provisons about preparing the decommissioning plan. In this paper, therefore, the draft guidelines of the decommissioning plan for a NPP were developed by considering the domestic situation, based on the comparative analyses of the regulatory guidelines of the decommissioning plan in U.S., U.K. and France. The draft guidelines are expected to play an important role to modify the domestic laws and regulations on the decommissioning of the NPP, and to give a license holder in charge of decommissioning the detailed instructions for preparing it in advance.

Status of Nuclear Power Plant Decommissioning Cost Analysis in USA (미국의 원전해체 비용평가 기초자료 및 동향 분석)

  • Shin, Sanghwa;Kim, Soonyoung
    • Journal of the Korean Society of Radiology
    • /
    • v.12 no.2
    • /
    • pp.139-148
    • /
    • 2018
  • Assessment of NPP(Nuclear Power Plant) decommissioning cost is very important for safe decommissioning of nuclear power plants. In the United States, which has the most NPP decommissioning experience, the cost evaluation study has been conducted since the 1970s in order to decommissioning nuclear facilities. The US NRC has conducted studies on decommissioning technology, safety and cost for a variety of reactor type and nuclear installations. In the total decommissioning costs, the end of operation licenses accounted for the largest portion, followed by spent fuel management and site restoration. In case of immediate decommissioning, spent fuel management cost increased compared to delayed decommissioning, and delayed deocmmissioning increased the cost of terminating the operation license. However, in general, delayed decommissioning does not show any significant benefit as compared with immediate decommissioning. It is necessary to consider the evaluation according to the site conditions when evaluating the cost of decommissioning domestic nuclear power plants. Also, in Korea, IAEA recommendations were applied to reorganize the radioactive waste classification system. Therefore, it is necessary to develop a method to appropriately use the decommissioning data of the preceding US Nuclear Power Plant in the new classification system when estimating the amount of radioactive waste generated during decommissioning. In particular, the establishment of the evaluation methodology for the waste to be disposed of will be an important factor in securing the accuracy of the decommissioning cost. In addition, it is necessary to construct information data that can be applied to facility characteristics and work characteristics in order to evaluate the cost of demolition of domestic nuclear power plants.

UK Civil Nuclear Decommissioning, a Blueprint for Korea's Nuclear Decommissioning Future?: Part I - Nuclear Legacy, Strategies, and the NDA

  • Foster, Richard I.;Park, June Kyung;Lee, Keunyoung;Seo, Bum-Kyoung
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.19 no.3
    • /
    • pp.387-419
    • /
    • 2021
  • The challenges facing companies and institutions surrounding civil nuclear decommissioning are diverse and many, none more so than those faced in the United Kingdom. The UK's Generation I nuclear power plants and early research facilities have left a 'Nuclear Legacy' which is in urgent need of management and clean-up. Sellafield is quite possibly the most ill-famed nuclear site in the UK. This complex and challenging site houses much of what is left from the early days of nuclear research in the UK, including early nuclear reactors (Windscale Piles, Calder Hall, and the Windscale Advanced Gas Cooled Reactor) and the UK's early nuclear weapons programme. Such a legacy now requires careful management and planning to safely deal with it. This task falls on the shoulders of the Nuclear Decommissioning Authority (NDA). Through a mix of prompt and delayed decommissioning strategies, key developments in R&D, and the implementation of site licenced companies to enact decommissioning activities, the NDA aims to safety, and in a timely manner, deal with the UK's nuclear legacy. Such approaches have the potential to influence and shape other such approaches to nuclear decommissioning activities globally, including in Korea.

UK Civil Nuclear Decommissioning, a Blueprint for Korea's Nuclear Decommissioning Future?: Part II - UK's Progress and Implications for Korea

  • Foster, Richard I.;Park, June Kyung;Lee, Keunyoung;Seo, Bum-Kyoung
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.20 no.1
    • /
    • pp.65-98
    • /
    • 2022
  • The nuclear legacy that remains in the United Kingdom (UK) is complex and diverse. Consisting of legacy ponds and silos, redundant reprocessing plants, research facilities, and non-standard or one-off reactor designs, the clean-up of this legacy is under the stewardship of the Nuclear Decommissioning Authority (NDA). Through a mix of prompt and delayed decommissioning strategies, the NDA has made great strides in dealing with the UK's nuclear legacy. Fuel debris and sludge removal from the legacy ponds and silos situated at Sellafield, as part of a prompt decommissioning strategy for the site, has enabled intolerable risks to be brought under control. Reactor defueling and waste retrievals across the Magnox fleet is enabling their transition to a period of care and maintenance; accelerated through the adopted 'Lead and Learn' approach. Bespoke decommissioning methods implemented by the NDA have also enabled the relevant site licence companies to tackle non-standard reactor designs and one-off wastes. Such approaches have potential to influence and shape nuclear decommissioning decision making activities globally, including in Korea.

The training system based on virtual environments to protect workers and to prevent incidents and accidents during decommissioning of nuclear facilities (원자력시설 해체 작업자 보호 및 사고 예방을 위한 가상현실 기반의 훈련 시스템)

  • Jeong, KwanSeong;Moon, Jei-Kwon;Choi, Byung-Seon;Yoon, TaeMan
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2015.11a
    • /
    • pp.294-297
    • /
    • 2015
  • Decommissioning of nuclear facilities should be accomplished by assuring the safety of workers because decommissioning activities of nuclear facilities are under high radioactivity and work difficulty. It is necessary that before decommissioning, the radiation exposure dose of workers has to be evaluated and assessed under the principle of ALARA (as low as reasonably achievable). Furthermore, to improve the proficiency of decommissioning environments, method and system need to be developed. The legacy methods of exposure dose measurement and assessment had the limitations to modify and simulate the exposure dose to workers prior to practical activities because those should be accomplished without changes of working routes under predetermined scenarios. To simulate a lot of decommissioning scenarios, decommissioning environments were designed in virtual reality. To simulate and assess the exposure dose to workers, human model also was designed in virtual environments. These virtual decommissioning environments made it possible to real-time simulate and assess the exposure dose to workers. It can be concluded that this system is able to protect from accidents and enable workers to improve his familiarization about working environments. It is expected that this system can reduce human errors because workers are able to improve the proficiency of hazardous working environments due to virtual training like real decommissioning situations. In the end, the safety during decommissioning of nuclear facilities will be guaranteed under the principle of ALARA.

  • PDF

Classification and consideration for the risk management in the planning phase of NPP decommissioning project

  • Gi-Lim Kim;Hyein Kim;Hyung-Woo Seo;Ji-Hwan Yu;Jin-Won Son
    • Nuclear Engineering and Technology
    • /
    • v.54 no.12
    • /
    • pp.4809-4818
    • /
    • 2022
  • The decommissioning project of a nuclear facility is a large-scale process that is expected to take about 15 years or longer. The range of risks to be considered is large and complex, then, it is expected that various risks will arise in decision-making by area during the project. Therefore, in this study, the risk family derived from the Decommissioning Risk Management (DRiMa) project was reconstructed into a decommissioning project risk profile suitable for the Kori Unit 1. Two criteria of uncertainty and importance are considered in order to prioritize the selected 26 risks of decommissioning project. The uncertainty is scored according to the relevant laws and decommissioning plan preparation guidelines, and the project importance is scored according to the degree to which it primarily affects the triple constraints of the project. The results of risks are divided into high, medium, and low. Among them, 10 risks are identified as medium level and 16 risks are identified as low level. 10 risks, which are medium levels, are classified in five categories: End state of decommissioning project, Management of waste and materials, Decommissioning strategy and technology, Legal and regulatory framework, and Safety. This study is a preliminary assessment of the risk of the decommissioning project that could be considered in the preparation stage. Therefore, we expect that the project risks considered in this study can be used as an initial data for reevaluation by reflecting the detail project progress in future studies.

An Approach to Framework of Dealing with Improving the Complexity and Uncertainty for Decommissioning Safety Assessment of a Nuclear Facility

  • Jeong, Kwan-Seong;Lee, Kune-Woo;Lim, Hyeon-Kyo
    • International Journal of Safety
    • /
    • v.8 no.1
    • /
    • pp.24-31
    • /
    • 2009
  • An effective assessment for decommissioning safety of nuclear facilities requires basic knowledge about possible risks, characteristics of potential hazards, and comprehensive understanding of the associated cause-effect relationships within a decommissioning for nuclear facility. This paper proposes an approach to develop the hierarchical structure and hazards of dealing with improving the complexity and uncertainty for decommissioning safety assessment of nuclear facilities and the resolutions are proposed to improve the complexity and uncertainty for decommissioning safety assessment of nuclear facilities. These resolutions can provide a comprehensive view of the risks in the decommissioning activities of a nuclear facility.