• Title/Summary/Keyword: Decision Cost

Search Result 1,971, Processing Time 0.027 seconds

Establishment of QC Target based on Quality Cost

  • Lee, Dong-choon;Kim, Jeong-mann;Hong, Sung-ill;Park, Yeong-ho
    • Journal of Korean Society for Quality Management
    • /
    • v.16 no.1
    • /
    • pp.59-66
    • /
    • 1988
  • On-line QC by Taguchi has two approaches of: the cost-oriented (cost-emphasis) QC and the process-oriented (quality-emphasis) QC. The main concern of this paper is to estabilish and recommend a desirable one as a QC target. Simulation is employed to solve the question, and the failure cost (A), appraisal cost (B), and prevention cost (C) are adopted as decision variables. In conclusion, the process-oriented QC is the recommendable approach as far as there is no remarkable cost difference between the two approaches and possible to apply on.

  • PDF

An unwanted facility location problem with negative influence cost and transportation cost (기피비용과 수송비용을 고려한 기피시설 입지문제)

  • Yang, Byoung-Hak
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.1
    • /
    • pp.77-85
    • /
    • 2013
  • In the location science, environmental effect becomes a new main consideration for site selection. For the unwanted facility location selection, decision makers should consider the cost of resolving the environmental conflict. We introduced the negative influence cost for the facility which was inversely proportional to distance between the facility and residents. An unwanted facility location problem was suggested to minimize the sum of the negative influence cost and the transportation cost. The objective cost function was analyzed as nonlinear type and was neither convex nor concave. Three GRASP (Greedy Randomized adaptive Search Procedure) methods as like Random_GRASP, Epsilon_GRASP and GRID_GRASP were developed to solve the unwanted facility location problem. The Newton's method for nonlinear optimization problem was used for local search in GRASP. Experimental results showed that quality of solution of the GRID_GRASP was better than those of Random_GRASP and Epsilon_GRASP. The calculation time of Random_GRASP and Epsilon_GRASP were faster than that of Grid_GRASP.

Probability- based Life Cycle Cost Analysis of Railroad Structures (확률적 방법에 의한 철도시설물의 LCC 분석)

  • Sho Byung-Choon;Choi Young-Min;Cho Sun-Kyu;Shin Kyung-Chul;Jung Jae-Dong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.971-976
    • /
    • 2004
  • The management of railroad structures is more difficult and complicate because there are many structures such as rail, bridge, tunnel, station, and so on. Therefore, LCC(Life Cycle Cost) analysis of railroad structures as public infrastructure must contain a maintenance cost as well as an initial cost in order to make a more effective management during the life cycle on the design phase. This paper presents a cost classification scheme considering user costs such as value of delayed time of passenger and freight. Also, in this study it is developed a probabilistic life cycle cost(PLCC) analysis model of railroad structures taking into account uncertainties and variations of input variables in order to analyze LCC. It may be stated that the model proposed in this study can greatly contribute to the making optimal decision, the estimate of the maintenance cost and the allocate of budget in the project of railroad structures.

  • PDF

Optimal Operating Strategy of Distributed Generation Considering Hourly Reliability Worth (시간별 신뢰도 가치를 고려한 분산전원의 최적 운영전략)

  • 배인수;신동준;김진오
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.8
    • /
    • pp.457-462
    • /
    • 2003
  • This paper presents an optimal operating strategy of distributed generation (DG) with reliability worth evaluation of distribution systems. Using DG for peak-shaving unit could reduce the overall system operating cost, and using DG for standby power unit could reduce the customer interruption cost. If DG operating cost is less than utility power cost in peak time, DG should be running to reduce the overall system operating cost. When customer interruption cost enlarges, however, standby power strategy may be the better operating strategy than peak-shaving strategy. Selection of whether DG should be operated for peak-shaving or for standby power, needs the accurate reliability worth evaluation and the accurate power cost evaluation. Instead of using annual average reliability worth, the concept of hourly reliability worth is introduced in this paper to determine the optimal operating decision of DG. Applying suggested hourly reliability worth, the distribution companies that possess DG could set up the optimal operating strategy of DG.

A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • v.71 no.2
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.

An Efficient Decision Maki ng Method for the Selectionof a Layered Manufacturing (3차원 조형장비 선정을 위한 효율적인 의사결정 방법)

  • Byun, Hong-Seok
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.18 no.1
    • /
    • pp.59-67
    • /
    • 2009
  • The purpose of this study is to provide a decision support to select an appropriate layered manufacturing(LM) machine that suits the application of a part. Selection factors include concept model, form/fit/functional model, pattern model far molding, material property, build time and part cost that greatly affect the performance of LM machines. However, the selection of a LM is not an easy decision because they are uncertain and vague. For this reason, the aim of this research is to propose hybrid multiple attribute decision making approaches to effectively evaluate LM machines. In addition, because subjective considerations are relevant to selection decision, a fuzzy logic approach is adopted. The proposed selection procedure consists of several steps. First, we identify LM machines that the users consider After constructing the evaluation criteria, we calculate the weights of the criteria by applying the fuzzy Analytic Hierarchy Process(AHP) method. Finally, we construct the fuzzy Technique of Order Preference by Similarity to Ideal Solution(TOPSIS) method to achieve the ranking order of all machines providing the decision information for the selection of LM machines.

Decision-making of alternative pylon shapes of a benchmark cable-stayed bridge using seismic risk assessment

  • Akhoondzade-Noghabi, Vahid;Bargi, Khosrow
    • Earthquakes and Structures
    • /
    • v.11 no.4
    • /
    • pp.583-607
    • /
    • 2016
  • One of the main applications of seismic risk assessment is that an specific design could be selected for a bridge from different alternatives by considering damage losses alongside primary construction costs. Therefore, in this paper, the focus is on selecting the shape of pylon, which is a changeable component in the design of a cable-stayed bridge, as a double criterion decision-making problem. Different shapes of pylons include H, A, Y, and diamond shape, and the two criterion are construction costs and probable earthquake losses. In this research, decision-making is performed by using developed seismic risk assessment process as a powerful method. Considering the existing uncertainties in seismic risk assessment process, the combined incremental dynamic analysis (IDA) and uniform design (UD) based fragility assessment method is proposed, in which the UD method is utilized to provide the logical capacity models of the structure, and the IDA method is employed to give the probabilistic seismic demand model of structure. Using the aforementioned models and by defining damage states, the fragility curves of the bridge system are obtained for the different pylon shapes usage. Finally, by combining the fragility curves with damage losses and implementing the proposed cost-loss-benefit (CLB) method, the seismic risk assessment process is developed with financial-comparative approach. Thus, the optimal shape of the pylon can be determined using double criterion decision-making. The final results of decision-making study indicate that the optimal pylon shapes for the studied span of cable-stayed bridge are, respectively, H shape, diamond shape, Y shape, and A shape.

Fast and Efficient Macroblock Mode Decision Algorithm in H.264/AVC (H.264/AVC 고속의 효율적인 매크로블록 모드 결정 알고리즘)

  • Park, Seong-Bin;Kim, Yong-Kwan
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.48 no.3
    • /
    • pp.42-49
    • /
    • 2011
  • In this paper, we propose a fast macroblock mode decision algorithm in H.264/AVC, based on the image sequence statistics. Specically, considering the directional characteristics of image sequences, we eliminate sub$8{\times}4$ or sub$4{\times}8$ mode decision process based on the rate-distortion cost of Inter$16{\times}8$ or Inter$8{\times}16$ mode respectively. Additionally, exploiting the optimal modes of submacroblock in inter$8{\times}8$ mode, we propose an algorithm to eliminate Intra$4{\times}4$ or Intra$16{\times}16$ mode decision process selectively. From the simulation results, the proposed method reduce the encoding time by maximum 70% of total, compared with the other conventional methods.

A Conceptual Analysis of Household Migration Decisions (가구의 이동결정에 관한 개념적고찰)

  • 김헌민
    • Korea journal of population studies
    • /
    • v.14 no.1
    • /
    • pp.26-34
    • /
    • 1991
  • Migration studies that assume that decision making is done on an individual basis is overlooking the importance of the family factor. Considering that must people belong to families, it is more appropriate to view migration decision from the perspective of the family. This study analyzes the household migration decision whereby the alternatives are to stay, 10 undertake family migration or to undertake single migration of a member. In developing a conceptual model of household migration decision, it is assumed that the household's objective is to maximize household income which is a function of individual members' earnings. The benefits and costs of household migration and individual migration are identified and the household chooses the migration strategy that maximizes expected household income. When household members have conflicting earning prospects in the potential destination, the household considers single migration of the member with the best earning potentials. However, lone migration by a household member involves cost of family separation which is both monetary and psychic, and this study shows that lone migration is undertaken only when its net gains to the family are greater than the separation cost of the family. The major benefit of choosing single migration is the retention of home base in the place of origin which can serve as an insurance against the uncertainty of obtaining a job in the destination, the benefit that is unavailable in family migration. The conceptual analysis shows how a household's migration decision would depend on its members' economic roles and prospects in the destination. Besides the economic variables, social and life cycle variables of the family translate into separation costs and benefits of migration. This study indicates that one - earner family in low economic status but with good earning prospects and high separation costs is more likely to choose family migration over single migration.

  • PDF

Constitutional Directions of Decision Support System for Cooperative Design in Architectural Design Phase (건축협력설계 의사결정 지원시스템 구축방안)

  • Chun Jae-Youl;Oh Seung-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.91-98
    • /
    • 2003
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. Therefore The final object of this study is to propose the establishment method of decision support model for the cooperative design in order to provides improved design coordination and optimize the building system.