• Title/Summary/Keyword: Dam reservoirs

Search Result 193, Processing Time 0.022 seconds

The Study of Reservoir Operation for Drought Period (가뭄기간의 저수지 운영방안에 관한 연구)

  • Park Ki-Bum;Lee Soon-Tak
    • Journal of Environmental Science International
    • /
    • v.13 no.12
    • /
    • pp.1041-1048
    • /
    • 2004
  • In this study the results of optimal water supply analysis by operating constraints of reservoirs during drought period are as follows. During drought period, water supply reliability is possible about $97\~61{\%}$ by CASE 1-CASE 5. Water supply reliability is possible about $97.3{\%}$ in case of the Andong dam and $87.7{\%}$ in case of the Imha dam by CASE 3. Also, under the constraints of CASE 4, water supply reliability is possible about $87.5{\%}$ in case of the Andong dam and $73.3{\%}$ in case of the Imha dam. The reason what low of available water supply ratio is decreased inflow of Imha dam. When compare standard deviation of average storage with standard deviation of storage, stable storage can be secured during successive drought period. And it also can minimize shortage of water during drought. therefore, it is impossible that reservoir supply sufficient water but change of operating condition is better than pervious on that followed by full reservoir level. It is need that the study for optimal water supply during drought period has to be continued.

Overtopping Model Experiments and 3-D Seepage Characteristics of the Embankment of Deteriorated Homogeneous Reservoirs (노후화된 균일형 저수지 제체의 월류모형실험과 3차원 침투특성)

  • Lee, Young Hak;Lee, Tae Ho;Lee, Dal Won
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.2
    • /
    • pp.13-23
    • /
    • 2019
  • In this study, an overtopping model experiments and three dimensional seepage characteristics at the deteriorated homogeneous reservoirs were performed to investigate the behavior of failure for embankment and spillway transitional zone due to overtopping. The failure pattern, pore water pressure, earth pressure and settlement by overtopping were compared and analyzed. The pattern of the failure by overtopping was gradually enlarged towards reservoirs crest from the spillway transition zone at initial stage. In the rapid stage and peak stage, the width and depth of failure gradually increased, and the pattern of the failure appeared irregular and several direction of the erosion. In the early stage, the pore water pressure at spillway transitional zone was more affected as its variation and failure width increased. In the peak stage, the pore water pressure was significantly increased in all locations due to the influence of seepage. The earth pressure increased gradually according to overtopping stage. The pore pressure by the numerical analysis was larger than the experimental value, and the analysis was more likely to increase steadily without any apparent variation. The horizontal and vertical displacements were the largest at the toe of slope and at the top of the dam crest, respectively. The results of this displacement distribution can be applied as a basis for determining the position of reinforcement at the downstream slope and the crest. The collapse in the overtopping stage began with erosion of the most vulnerable parts of the dam crest, and the embankment was completely collapsed as the overtopping stage increased.

Experimental evaluation of crack effects on the dynamic characteristics of a prototype arch dam using ambient vibration tests

  • Sevim, Baris;Altunisik, Ahmet Can;Bayraktar, Alemdar
    • Computers and Concrete
    • /
    • v.10 no.3
    • /
    • pp.277-294
    • /
    • 2012
  • The aim of the study is to determine the modal parameters of a prototype damaged arch dam by operational modal analysis (OMA) method for some damage scenarios. For this purpose, a prototype arch dam-reservoir-foundation model is constructed under laboratory conditions. Ambient vibration tests on the arch dam model are performed to identify the modal parameters such as natural frequency, mode shape and damping ratio. The tests are conducted for four test-case scenarios: an undamaged dam with empty reservoir, two different damaged dams with empty reservoirs, and a damaged dam with full reservoir. Loading simulating random impact effects is applied on the dam to crack. Cracks and fractures occurred at the middle of the upper part of the dams and distributed through the abutments. Sensitivity accelerometers are placed on the dams' crests to collect signals for measurements. Operational modal analysis software processes the signals collected from the ambient vibration tests, and enhanced frequency domain decomposition and stochastic subspace identification techniques are used to estimate modal parameters of the dams. The modal parameters are obtained to establish a basis for comparison of the results of two techniques for each damage case. Results show that approximately 35-40% difference exists between the natural frequencies obtained from Case 1 and Case 4. The natural frequencies of the dam considerably decrease with increasing cracks. However, observation shows that the filled reservoir slightly affected modal parameters of the dam after severe cracking. The mode shapes obtained are symmetrical and anti-symmetrical. Apparently, mode shapes in Case 1 represent the probable responses of arch dams more accurately. Also, damping ratio show an increase when cracking increases.

Comparison of flood inundation simulation between one- and two-dimensional numerical models for an emergency action plan of agricultural reservoirs

  • Kim, Jae Young;Jung, Sung Ho;Yeon, Min Ho;Lee, Gi Ha;Lee, Dae Eop
    • Korean Journal of Agricultural Science
    • /
    • v.48 no.3
    • /
    • pp.515-526
    • /
    • 2021
  • The frequency of typhoons and torrential rainfalls has increased due to climate change, and the concurrent risk of breakage of dams and reservoirs has increased due to structural aging. To cope with the risk of dam breakage, a more accurate emergency action plan (EAP) must be established, and more advanced technology must be developed for the prediction of flooding. Hence, the present study proposes a method for establishing a more effective EAP by performing flood and inundation analyses using one- and two-dimensional models. The probable maximum flood (PMF) under the condition of probable maximum precipitation (PMP) was calculated for the target area, namely the Gyeong-cheon reservoir watershed. The breakage scenario of the Gyeong-cheon reservoir was then built up, and breakage simulations were conducted using the dam-break flood forecasting (DAMBRK) model. The results of the outflow analysis at the main locations were used as the basis for the one-dimensional (1D) and two-dimensional (2D) flood inundation analyses using the watershed modeling system (WMS) and the FLUvial Modeling ENgine (FLUMEN), respectively. The maximum inundation area between the Daehari-cheon confluence and the Naeseong-cheon location was compared for each model. The 1D flood inundation analysis gave an area of 21.3 km2, and the 2D flood inundation analysis gave an area of 21.9 km2. Although these results indicate an insignificant difference of 0.6 km2 in the inundation area between the two models, it should be noted that one of the main locations (namely, the Yonggung-myeon Administrative and Welfare Center) was not inundated in the 1D (WMS) model but inundated in the 2D (FLUMEN) model.

Water Quality Assessment for pre and post-Impoundment of 6 Multipurpose Dam Reservoirs in Korea (국내 6개 다목적댐 저수지의 담수 전·후 수질 비교평가)

  • Park, Jae-Chung;Shin, Jae-Ki;Song, Young-Il;Jeong, Yong-Moon;Song, Sang-Jin
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.1
    • /
    • pp.89-96
    • /
    • 2011
  • This study was carried out to assess the variations of water quality caused by the dam construction on the river. Six dams-Yongdam, Miryang, Hoengseong, Boryeong, Jangheung and Buan- constructed recently in Korea were selected for the study. Chemical oxygen demand(COD) was increased in the initial stage of water storage at dams compared to the lotic(river) environment, but after 3 years it was maintained lower and stabilized concentrations. Five dams except for Jangheung Dam were maintained Ia~Ib grade conditions under the water quality criteria of Korea. The concentrations of total nitrogen(T-N) were decreased under the lentic(reservoir) environment compared to the river status. Total phosphorus(T-P) was decreased 13~63% at the reservoir condition. We concluded that increase of COD concentration was due to the debris organic materials of the land, but temporary phenomenon. T-N and T-P concentrations were decreased at the lentic condition compared to the lotic.

Analysis of Greenhouse Gas Research Trends of Hydropower Dams: Focusing on Foreign Cases (수력발전댐에서 온실가스 연구 동향 분석 : 국외 사례를 중심으로)

  • Park, Kyoung-deok;Jo, Won Gi;So, Yoon Hwan;Kang, Dong-hwan
    • Journal of Environmental Science International
    • /
    • v.31 no.2
    • /
    • pp.195-213
    • /
    • 2022
  • This research summarizes the generating factors of greenhouse gas (carbon dioxide, methane, nitrous oxide) in hydropower dams and related domestic/foreign researches. Microorganisms and eutrophication are the main factors in greenhouse gases in hydropower dam reservoirs. The greenhouse gas emission from the hydropower dam is affected by meteorological factors and dam operation periods, and greenhouse gases are also emitted from the outlets. The fluxes of greenhouse gas emission from the hydropower dams were -926~180,806 mg CO2 m-2d-1, -0.19~3800 mg CH4 m-2d-1, and 0.01~16.1 mg N2O m-2d-1. In South Korea, the study on the greenhouse gas emission from Korean hydropower dams has been rarely, and therefore it is inquired. This research suggested the methods on the greenhouse gas emission from Korean hydropower dams and flux calculation.

A Study on Design Factors of Air Diffuser Systems in Reservoirs: Application of Field Conditions to the CFD Simulation (산기식 물순환장치 설계인자 연구: 현장 댐 조건을 고려한 CFD 해석 중심)

  • Shin, Sang-Min;Lee, Seung-Jae;Lee, Sang-Eun;Park, Hee-Kyung;Yum, Kyung-Taek
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.2
    • /
    • pp.161-169
    • /
    • 2011
  • This study aims at examining the design factors of the air diffuser system in a particular view of field conditions, and thus improving the procedures currently applied to design the system. First, the CFD model is built for an air diffuser system suitable for field conditions of real reservoirs. Then, the design factors, including destratification number, destratification radius and efficiency of the air diffuser system, are analyzed after a series of simulations over various field conditions. The result shows successful correlations of design factors with DN at the condition, and they lead to estimate of the destratification radius and efficiency of air diffuser system based on DN. It is finally concluded that the design factors are improved such that the air diffuser system is suitable for the field conditions of dam reservoirs.

Improvement of Quantitative Condition Assessment Criteria for Reservoir Embankment Safety Inspection Considering Characteristics of Small Reservoirs in Korea (소규모 저수지의 특성을 고려한 제체 안전진단의 정량적 상태평가 기준 개선)

  • Jeon, Geonyeong;Bang, Donseok
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.63 no.5
    • /
    • pp.27-38
    • /
    • 2021
  • The physical condition assessment criteria of fill dam safety inspection are now weakly regulated and inappropriate for small agricultural reservoirs since these criteria have fundamental backgrounds suitable for large-scale dams. This study proposes the degree (critical values) of defects for the quantitative condition assessment of the embankment in order to prepare the condition assessment criteria for a small reservoir with a storage capacity of less than one (1) million cubic meters. The critical values of defects were calculated by applying the method that considers the size ratios based on the dimensional data of reservoirs, and the method of statistical analysis on the measured values of the defect degree which extracted from comprehensive annual reports on reservoir safety inspection. In comparison with the current criteria, the newly proposed critical values for each condition assessment item of the reservoir embankment are presented in paragraphs 4 and 6 of the conclusion. In addition, this study presents a method of displaying geometric figures to clarify the rating classification for condition assessment items with the two defect indicators.

Evaluation of impact of climate variability on water resources and yield capacity of selected reservoirs in the north central Nigeria

  • Salami, Adebayo Wahab;Ibrahim, Habibat;Sojobi, Adebayo Olatunbosun
    • Environmental Engineering Research
    • /
    • v.20 no.3
    • /
    • pp.290-297
    • /
    • 2015
  • This paper presents the evaluation of the impact of climate change on water resources and yield capacity of Asa and Kampe reservoirs. Trend analysis of mean temperature, runoff, rainfall and evapotranspiration was carried out using Mann Kendall and Sen's slope, while runoff was modeled as a function of temperature, rainfall and evapotranspiration using Artificial Neural Networks (ANN). Rainfall and runoff exhibited positive trends at the two dam sites and their upstream while forecasted ten-year runoff displayed increasing positive trend which indicates high reservoir inflow. The reservoir yield capacity estimated with the ANN forecasted runoff was higher by about 38% and 17% compared to that obtained with historical runoff at Asa and Kampe respectively. This is an indication that there is tendency for water resources of the reservoir to increase and thus more water will be available for water supply and irrigation to ensure food security.

The Analysis of Potential Discharge by Dam in Han River Basin at Dry Season (한강 팔당하류의 갈수 시 댐 용수공급 가능유하량 분석)

  • Kim, Young-Kyu;Choi, Gye-Woon;Ham, Myeong-Soo;Kim, Nam-Won
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.11
    • /
    • pp.1143-1152
    • /
    • 2008
  • Korea is located in a monson area, so that 2/3 of precipitation is fallen down in rainy season and dry season has few rainfall. Also, water quality gets worse during dry season by shortage of water. In this paper, the method, which is a physical way to improve water quality by dilution through over supplied water from big reservoir or dam, is analyzed at Han-river basin. For the sake of the analysis, the basin is divided in 33 catchments and each catchments' natural flow is simulated by SWAT-K and the future water demand is estimated by using statistics data. It is considered that Han-river basin has two big reservoirs(Chung-ju dam, So-yang gang dam) and potential discharge by dam is calculated through case of supply water from each dam and supply water from both dams.