• Title/Summary/Keyword: Dam process

Search Result 293, Processing Time 0.029 seconds

Multi-objective Optimization of BMPs for Controlling Water Quality in Upper Basin of Namgang Dam (남강댐 상류유역 수질관리를 위한 BMPs의 다목적 최적화)

  • Park, Yoonkyung;Lee, Jae Kwan;Kim, Jeongsook;Kim, Sangdan
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.6
    • /
    • pp.591-601
    • /
    • 2018
  • Optimized BMP plans for controlling water quality using the Pareto trade-off surface curve in upper basin of Namgang Dam is proposed. The proposed alternatives consist of BMP installation scenarios in which the reduction efficiency of non-point pollutants is maximized in a given budget. The multi-objective optimization process for determining the optimal alternatives was performed without direct implementation of a watershed model such as SWAT analysis, thereby reducing the time taken. The shortening of the calculation time further enhances the applicability of the multi-objective optimization technique in preparing regional water quality management alternatives. In this study, different types of BMP are applied depending on the land use conditions. Fertilizer input control and vegetative filter strip are considered as alternatives to applying BMP to the field but only control of fertilizer input can be applied to rice paddies. Fertilizer input control and vegetative filter strip can be installed separately or simultaneously in a hydrologic response unit. Finally, 175 BMP application alternatives were developed for the water quality management of the upper river basin of Namgang dam. The proposed application alternative can be displayed on the map, which has the advantage of clearly defining the BMP installation location.

Analysis of Unfinished Work and Queue Waiting Time for the M/G/1 Queue with D-policy

  • Park, Yon-Il;Chae, Kyung-Chul
    • Journal of the Korean Statistical Society
    • /
    • v.28 no.4
    • /
    • pp.523-533
    • /
    • 1999
  • We consider the M/G/1 queueing model with D-policy. The server is turned off at the end of each busy period and is activated again only when the sum of the service times of all waiting customers exceeds a fixed value D. We obtain the distribution of unfinished work and show that the unfinished work decomposes into two random variables, one of which is the unfinished work of ordinary M/G/1 queue. We also derive the distribution of queue waiting time.

  • PDF

Potential of River Bottom and Bank Erosion for River Restoration after Dam Slit in the Mountain Stream

  • Kang, Ji-Hyun;So, Kazama
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.46-46
    • /
    • 2011
  • Severe sediment erosion during floods occur disaster and economic losses, but general sediment erosion is basic mechanism to move sediment from upstream to downstream river. In addition, it is important process to change river form. Check dam, which is constructed in mountain stream, play a vital role such as control of sudden debris flow, but it has negative aspects to river ecosystem. Now a day, check dam of open type is an alternative plan to recover river biological diversity and ecosystem through sediment transport while maintaining the function of disaster control. The purpose of this paper is to verify sediment erosion progress of river bottom and bank as first step for river restoration after dam slit by cross-sectional shear stress and critical shear stress. Study area is upstream reach of slit check dam in mountain stream, named Wasada, in Japan. The check dam was slit with two passages in August, 2010. The transects were surveyed for four upstream cross-sections, 7.4 m, 34 m, 86 m, and 150 m distance from dam in October 2010. Sediment size was surveyed at river bottom and bank. Sediment of cobble size was found at the wetted bottom, and small size particles of sand to medium gravel composed river bank. Discharge was $2.5\;m^3/s$ and bottom slope was 0.027 m/m. Excess shear stress (${\tau}_{ex}$) was calculated for hydraulic erosion by subtracting the values of critical shear stress (${\tau}_{c}$) from the value of shear stress (${\tau}$) at river bottom and bank (${\tau}_{ex}=\tau-{\tau}_c$). Shear stress of river bottom (${\tau}_{bottom}$) was calculated using the cross-sectional shear stress, and bank shear stress (${\tau}_{bank}$) was calculated from the method of Flintham and Carling (1988). $${\tau}_{bank}={\tau}^*SF_{bank}((B+P_{bed})/(2^*P_{bank}))$$ where $SF_{bank}=1.77(P_{bed}/p_{bank}+1.5)^{-1.4}$, B is the water surface width, $P_{bed}$ and $P_{bank}$ are wetted parameter of the bed and bank. Estimated values for ${\tau}_{bottom}$ for a flow of $2.5\;m^3/s$ were lower as 25.0 (7.5 m cross-section), 25.7 (34 m), 21.3 (86 m) and 19.8 (150 m), in N/$m^2$, than critical shear stress (${\tau}_c=62.1\;N/m^2$) with cobble of 64 mm. The values were insufficient to erode cobble sediment. In contrast, even if the values of ${\tau}_{bank}$ were lower than the values for ${\tau}_{bottom}$ as 18.7 (7.5 m), 19.3 (34 m), 16.1 (86 m) and 14.7 (150 m), in N/$m^2$, excess shear stresses were calculated at the three cross-sections of 7.5 m, 34 m, and 86 m distances compare with ${\tau}_c$ is 15.5 N/$m^2$ of 16mm gravel. Bank shear stresses were sufficient for erosion of the medium gravel to sand. Therefore there is potential to erode lateral bank than downward erosion in a flow of $2.5\;m^3/s$. Undercutting of the wetted bank can causes bank scour or collapse, therefore this channel has potential to become wider at the same time. This research is about a potential of sediment erosion, and the result could not verify with real data. Therefore it need next step for verification. In addition an erosion mechanism for river restoration is not simple because discharge distribution is variable by snow-melting or rainy season, and a function for disaster control will recover by big precipitation event. Therefore it needs to consider the relationship between continuous discharge change and sediment erosion.

  • PDF

Prior Eco-preserve Zoning through Stream Ecosystem Evaluation on Dam Basin -A Case of Yongdam-dam Watershed, Jeollabukdo Province- (댐유역 하천생태계평가를 통한 생태보전우선지역설정 -용담다목적댐 유역을 사례로-)

  • Lim, Hyun-Jeong;Lee, Myung-Woo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.2
    • /
    • pp.103-112
    • /
    • 2011
  • The purpose of this study is to specify the prior eco-preserve zone by establishing the eco-landscape unit on the stream corridor and evaluating the stream ecosystem in the dam basin. The fundamental ecological data was surveyed and collected through "the ecosystem project on Yongdam multipurpose dam watershed" from 2008 to 2009. The Yongdam Dam Watershed has several streams, Jujacheon, Jeongjacheon and Guryangcheon, of which the area is $930km^2$, stretching to Jinangun, Jangsugun and Mujugun Jellabukdo. In spite of being used for drinking purpose, the dam water quality and ecosystem is threatened by in-watershed pollution produced by development, golf course grounds and sports complex, etc. The landscape unit of stream corridor was zoned across by 250m, 500m, and 750m from the vicinity line of stream, which was decided to the accuracy of mapping and surveying. Types of evaluation are the Stream Corridor Evaluation(SCE) and the Vegetated Area Evaluation(VAE). In the process of SCE, several indices were analysed, fish species diversity, species peculiarity, and stream naturality. Indices for VAE were forest stand map, vegetation protection grade, species diversity and peculiarity for wild bird and mammal life. The importance of the ecological items is categorized into three levels and overlapped for specifying the prior preserve zone. The area at which legally protecting species appeared is categorized as absolute preserve area. This study might be meaningful for proposing the evaluation process of a stream corridor ecosystem, which can synthesize a lot of individual ecological surveys. We hope further research will be actively performed about the ecotope mapping which is based on a individual wildlife territory and habitats and also their relationships.

Comparison of Conflict in Saemankum and Dong River Dam (정책인식프레이밍 관점에서 새만금 사례와 동강댐 사례의 갈등 비교 연구)

  • Ahn, Hye-Won;Park, Dae-Woon;Kim, Hak-Don
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.3
    • /
    • pp.270-277
    • /
    • 2009
  • As social diversity is increased recently, conflict between government and non-government organizations is also being increased. This conflict disturbs social development and also social cost to solve the conflict is very high. Therefore, it is necessary to set up a mediation organization which can draw reasonable decision making while minimizing social conflict. In this study, we compares Samangeum reclamation project and Youngweol dam case to find out how their recognition framings are formed, confronted, or adjusted and also how the process affects their conflict.

A Study on the Material Circulation System of Ecovillage - Focused on the Cristalwaters Ecovillage in Australia - (생태마을의 물질순환체계에 관한 연구 - 호주 크리스탈워터스 생태마을을 중심으로 -)

  • Choi, Young-Ho;Shim, Woo-Gab
    • KIEAE Journal
    • /
    • v.4 no.2
    • /
    • pp.49-56
    • /
    • 2004
  • This study intends to propose the fundamentals of 'Ecovillage' design by researching into the cycle system of material of 'Crystalwaters' which is having been in charge of a leading role of GEN since 1996 (GEN was formed in 1996) as Ecovillage in Australia. First, to secure the water resources, we can store up rain and the water of valley, and dam. Second, we are able to use the natural filter apparatus, do tree-planting of roof to gain better quality of water. Third, it is to save the energy as supplying water. For it, we make the best of a gravity that is one of the cycle principle of water. Forth, to build a Dam can make a site of scenic beauty, do the role of recreation place and provide against emergencies (a fire, drought) as well as make a mild climate. Fifth, it can reduce the environment load because of sewage and garbage as making it compost. This is possible by treating biologically using composting apparatus of the dry or wet process. Sixth, it is to reduce the environmental pollution as to discharge seperating a recycable waste, an organic matter being able to make it compost. Finally, first of all, environmentally friendly inhabitant consciousness from lifestyle and production style plays an importent part for water cycle and the ecological cycle of waste and sewage.

Seismic response analysis of embankment dams under decomposed earthquakes

  • Nasiri, Fatemeh;Javdanian, Hamed;Heidari, Ali
    • Geomechanics and Engineering
    • /
    • v.21 no.1
    • /
    • pp.35-51
    • /
    • 2020
  • In this study, the seismic response analysis of embankment dams was investigated through numerical modeling. The seismic behavior of dams under main earthquake records and wavelet-based records were studied. Earthquake records were decomposed using de-noising method (DNM) and down-sampling method (DSM) up to five levels. In decomposition process, low and high frequencies of the main earthquake record were separated into two signals. Acceleration response, spectral acceleration, and Fourier amplitude spectrum at the crest of embankment dams under different decomposition levels were evaluated. The seismic behavior under main and decomposed earthquake records was compared. The results indicate an acceptable agreement between the seismic responses of embankment dams under wavelet-based decomposed records and main earthquake motions. Dynamic analyses show that the DNM-based decomposed earthquake records have a better performance compared to DSM-based records. DNM-based records up to level 4 and DSM-based records up to level 2 have a high accuracy in assessment of seismic behavior of embankment dams. The periods corresponding to the maximum values of acceleration spectra and the frequencies corresponding to the maximum values of Fourier amplitude spectra of embankment dam crest under main and decomposed records are in good agreement. The results demonstrate that the main earthquake records can be replaced by wavelet-based decomposed records in seismic analysis of embankment dams.

Implementation of an Export System for GIS Arrester Facilities (GIS 피뢰설비 전문가 시스템 구현)

  • Kim, Il-Kwon;Song, Jae-Yong;Moon, Seung-Bo;Cha, Myung-Soo;Rhyu, Keel-Soo;Kil, Gyung-Suk
    • Proceedings of the KIEE Conference
    • /
    • 2006.07c
    • /
    • pp.1465-1466
    • /
    • 2006
  • The monitoring and diagnosing technique for lightning arresters is important to assure the reliability of power supply in GIS-substation. In this paper, we described the implementation of an expert system for GIS arrester facilities. The proposed system consists of a data acquisition module (DAM), a wireless communication module, and a personal computer. The DAM detects system voltages, total leakage currents and its harmonic components, and includes an algorithm to calculate the resistive leakage current by the principle that the magnitudes of resistive leakage current are equal at the same level of the system voltage applied to the arrestor. Also, we designed a surge event detection circuit which can acquire the date, the polarity, and the amplitude of surge events. All the acquired data are transmitted after correction by many algorithms to the remote station through the ZigBee protocol. The expert system is based on the Jave Expert System Shell (JESS) and make more reliable decision by using an exclusive inference process.

  • PDF

Noise and Operating Properties of Si Vertical Hall Device (Si 종형 Hall 소자의 동작과 잡음 특성)

  • Ryu, Ji-Goo;Kim, Nam-Ho
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.12 no.10
    • /
    • pp.1890-1896
    • /
    • 2008
  • In this paper, the Si vertical Hall devices ale fabricated by using standard bipolar process and investigated in terms of the opeating and noise properties. The sensitivity of device with P+ isolation dam(type B) has been increased up to about 1.2 times compared to that device without the dam also noise has been increased. With the condition of f=I[KHz], band-width 1[Hz], the resolution of magnetic-field detection were about $0.97[{\mu}T]$/ type B and $1.25[{\mu}T]$/ type A, respectively, thus we must consider correlation the low noise or good resolution and high sensitivity in the situation for device geometry design or even for the materials.