• Title/Summary/Keyword: Dam overflow

Search Result 45, Processing Time 0.024 seconds

Characteristics of Reservoir Behavior According to Establishment Range of Waterproof Mat During Overflow (차수매트 포설 범위에 따른 저수지 월류시 거동 특성)

  • Kim, Young-Ik;Lee, Ik-Sang;Choi, Don-Hwan;Im, Eun-Sang;Kim, Yong-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.2
    • /
    • pp.59-66
    • /
    • 2010
  • This study was performed to develop the embankment protection method that can reduce demage by prevention of embankment loss and collapse from overflow due to heavy rain and flood. For overflow test, model dam was prepared and embankment behaviors were monitored with the established piezometer and strain meter during overflow. As a result of overflow test for model dam, in case of embankment without waterproof mat, the lower end of embankment was collapsed within 40 seconds after beginning of overflow. On the other hand, in case of embankment with waterproof mat, embankment collapse didn't occurred during overflow. Accordingly, establishment of waterproof mat for embankment showed that be absolutely effective for the embankment protection during overflow in reservoir. Also, it showed that the minimum establishment range of waterproof mat to prevent embankment collapse in reservoir is from maximum storage level to the lower end of embankment.

Failure Probability Analysis of Concrete Cofferdam Considering the Overflow in Flood Season (홍수시 월류를 고려한 콘크리트 가물막이댐의 파괴확률 산정)

  • Hong, Won Pyo;Song, Chang Geun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.5
    • /
    • pp.30-38
    • /
    • 2020
  • In order to construct a dam, the diversion facility such as cofferdam and a diversion tunnel should be installed in advance. And size of a cofferdam depends on type of a main dam. According to the Korea Dam Design Standard, if the main dam is a concrete dam, design flood of the cofferdam is 1~2 years flood frequency. This means that overflow of the cofferdam occurs one time for 1 or 2 years, therefore, stability of the cofferdam should be secured against any overflow problem. In this study, failure probability analysis for the concrete cofferdam is performed considering the overflow. First of all, limit state function of the concrete cofferdam is defined for overturning, sliding and base pressure, and upstream water levels are set as El. 501 m, El. 503 m, El. 505 m, El. 507 m. Also, after literature investigation research, probabilistic characteristics of various random variables are determined, the failure probability of the concrete cofferdam is calculated using the Monte Carlo Simulation. As a result of the analysis, when the upstream water level rises, it means overflow, the failure probability increases rapidly. In particular, the failure probability is largest in case of flood loading condition. It is considered that the high upstream water level causes increase of the upstream water pressure and the uplift pressure on the foundation. In addition, among the overturning, the sliding and the base pressure, the overturing is the major cause for the cofferdam failure considering the overflow.

Behavior of Fill Dam Subjected to Continuous Water Level Change and Overflow (지속적 수위변동 및 월류에 따른 저수지 제체의 거동 연구)

  • Lee, Chungwon;Maeng, Youngsu;Kim, Yongseong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.6
    • /
    • pp.41-48
    • /
    • 2014
  • In this study, the behavior of fill dam with continuous water level change considering velocity changes via centrifugal model test was investigated. In addition, the collapse of fill dam due to the overflow was also experimentally simulated. The experimental results demonstrate that the pore water pressures and displacements vary in proportion to the water-level-change velocity, and the displacement increment is independent to the water-level-change velocity. Also, it is confirmed that the continuous water level change induces to the progress of fill-dam deformation due to displacement accumulation and the fill-dam stability dramatically degrades owing to the overflow. Hence, the real-time monitoring of pore water pressures and displacements of fill dam, and the control of water level in heavy rain through the countermeasure such as opening sluice gates are needed to ensure the stability of fill dam.

A Study on Model Test for Spilway of Fill Dam (Fill Dam의 방수로모형실험에 관한 고찰)

  • 강병익
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.12 no.4
    • /
    • pp.2090-2123
    • /
    • 1970
  • This paper is a report on the research of experimental model test of Andong Fill Dam, which has been planned by the Government of Korea as a project, of its over-flowing capacity in spillway, creation of minus pressure and structure of anti-water impulse in over-flow weir. Andong Fill Dam is one of the project of master development plant for water resources, locating at Nakdong River side of Korea, and is aimed to have a multi-purpose dam for flood-control, irrigation, water power, urban and industrial water supply. This dam is planned to erect in fill-dam type due to the improper soil foundation and condition for concrete dam. The refore for the proper and advantageous points, this is designed as center core fill dam. By a model minimized of Andong Fill Dam, held an experimental model test on water quentity of reservir, discharges of overflow part, low pressure and anti-water impulse of overflow part, which was conducted an experiment by flowing aspects through each section of spillway to find the changes of water pressure and that of water level, and corrected the section of each part in order to conduct a check on the creation of minus pressure not to be over acted to the allowable bundary of the section structure; and for the prevention of concentated scouring at the down stream side of flow.

  • PDF

A Study on Hydraulic Characteristics for Labyrinth Weir of Triangle Single Type (삼각형 단일 Labyrinth 위어의 수리특성 연구)

  • Im, Jang-Hyuk;Park, Young-Jin;Baek, Kyung-Won;Song, Jai-Woo
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.191-194
    • /
    • 2008
  • Labyrinth weir is a hydraulic structure that can maintain constant water depth and increase overflow rate by increasing overflow width of weir through complicated displacement of its cross section. The labyrinth weir can be widely applied to various hydraulic facilities such as dam spillway, irrigation facilities, and canal structures. To date, however, few labyrinth weirs were applied to hydraulic facilities in Korea. Hence, in-depth research on labyrinth weir is highly required to efficiently apply the labyrinth weir to hydraulic facilities. This study was performed to analyze the hydraulic characteristics according to triangle labyrinth weir using hydraulic model experiments. The hydraulic characteristics provided in this study, which make it feasible to increase the overflow rate, and are expected to be widely applied to design of hydraulic facilities such as dam spillway and irrigation system.

  • PDF

Stability Analysis of Embankment Overtopping by Initial Fluctuating Water Level (초기 변동수위를 고려한 제방 월류에 따른 안정성 분석)

  • Kim, Jin-Young;Kim, Tae-Heon;Kim, You-Seong;Kim, Jae-Hong
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.8
    • /
    • pp.51-62
    • /
    • 2015
  • It is not possible to provide resonable evidence for embankment (or dam) overtopping in geotechnical engineering, and conventional analysis by hydrologic design has not provided the evidence for the overflow. However, hydrologic design analysis using Copula function demonstrates the possibility that dam overflow occurs when estimating rainfall probability with rainfall data for 40 years based on fluctuating water level of a dam. Hydrologic dam risk analysis depends on complex hydrologic analyses in that probabilistic relationship needs to be established to quantify various uncertainties associated with modeling process and inputs. The systematic approaches to uncertainty analysis for hydrologic risk analysis have not been addressed yet. In this paper, the initial level of a dam for stability of a dam is generally determined by normal pool level or limiting the level of the flood, but overflow of probability and instability of a dam depend on the sensitivity analysis of the initial level of a dam. In order to estimate the initial level, Copula function and HEC-5 rainfall-runoff model are used to estimate posterior distributions of the model parameters. For geotechnical engineering, slope stability analysis was performed to investigate the difference between rapid drawdown and overtopping of a dam. As a result, the slope instability in overtopping of a dam was more dangerous than that of rapid drawdown condition.

Two - Dimensional analysis in Dam Downstream due Spill Condition (방류조건에 따른 댐 하류부의 2차원 수치해석)

  • Lee, Jong-Hyeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.2
    • /
    • pp.911-918
    • /
    • 2013
  • Two - dimensional numerical analysis model(RMA2), is mainly applied to analyze the flood water levels, velocities and change of river bed at the downstream of Dam. The analysis result be able to influence to Gwangchon bridge from Juam dam, freeboard be insufficient 0.7m to left bank 300m section of dam downstream. Bank overflow is appear to all section of Bosung river to PMF spill condition. Inundated district is appear to river confluence to 200year frequency and is expand to bank overflow to PMF spill condition. Velocity in the channel was simulated high velocity to the bridge and narrow reach and appear to riverbed degradation.

Estimation of Discharge Coefficient for Triangle Shape Labyrinth Weir (삼각형 래버린스 위어의 유량계수 산정)

  • Song, Jai-Woo;Lee, Jin-Eun;Im, Jang-Hyuk
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.2
    • /
    • pp.87-93
    • /
    • 2009
  • The labyrinth weir can be defined that the plane shape of overflow part is not straight line and is a kind of weir having overflow length increased by changing its plane shape. Recently, the labyrinth weir can be widely applied to various hydraulic facilities such as dam spillway, irrigation facilities, and canal structures by increasing precipitation. This study was performed to analyze the hydraulic characteristics according to triangle labyrinth weir using hydraulic model experiments and finally estimate the discharge coefficients for triangle labyrinth weirs. The formulae of discharge coefficient provided in this study, which make it feasible to calculate the overflow rate by a coefficient of correlation. sum of residuals, MAPE(Mean Absolute Percentage Error), are expected to be widely applied to design of hydraulic facilities such as dam spillway and irrigation system.