• Title/Summary/Keyword: Dam foundation

Search Result 107, Processing Time 0.021 seconds

A Comparative Study on Geotechnical System Response Probabilities of Fill Dams in Korea Using Internal Erosion Toolbox (내부 침식 평가 도구를 이용한 국내 필댐의 지반공학적 시스템 응답 확률에 대한 비교 연구)

  • Kim, Woo-Yong;Lim, Jeong-Yeul;Mok, Young-Jin;Jung, Young-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.245-258
    • /
    • 2016
  • In this study the geotechnical system response probabilities (SRP) of the failure modes caused by the interal erosion in three dams with different histories of defects in Korea were analyzed via the internal erosion toolbox developed by USACE. The calculated values of SRP were compared with the values reported for other dams in worldwide and also the statistics on the past failures of dams and embankments in Korea. The calculated values of SRP related to the internal erosion adjacent to the conduits or spillway structures are as high as in the order of $10^{-5}$ that is significantly greater than the SRP values related to other mechanisms of internal erosion. The statistical data showing that the interal erosion adjacent to the structure is the most frequent cause of the failure of the dam in Korea could be a collateral evidence of this finding. In contrast, the values of SRP related to the internal erosion through foundation, one of the major causes of dam failure in worldwide, are relatively as low as in the order of $10^{-7}$. This result could be comparable with the rareness of the failure cases of dam caused by the internal erosion through foundation in Korea.

Recent Techniques for Design and Construction of CFRD (CFRD의 최근 설계ㆍ시공기술 동향)

  • Park Dong-Soon;Kim Hyoung-Soo;Lim Jeong-Yeul
    • The Journal of Engineering Geology
    • /
    • v.15 no.1
    • /
    • pp.77-86
    • /
    • 2005
  • CFRD(Concrete Faced Rockfill Dam) is in widespread use because this type of dam has superior characteristics in structural, material aspects comparing with earth cored rockfill dam. On this paper, up-to-date re-searches and techniques are summed up to be available for future needs in design and construction of CFRD. For example, such items as embankment using weak rock, experience of sand-gravel fill CFRD, connecting slab applied between plinth and face slab, raising experience of old dm, inverse filtration problem, environmental friendly zone, thickness and reinforcing of face slab, alluvial foundation treatment, and curb element method, are summarized for understanding of related engineers.

Failure Probability Analysis of Concrete Cofferdam Considering the Overflow in Flood Season (홍수시 월류를 고려한 콘크리트 가물막이댐의 파괴확률 산정)

  • Hong, Won Pyo;Song, Chang Geun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.5
    • /
    • pp.30-38
    • /
    • 2020
  • In order to construct a dam, the diversion facility such as cofferdam and a diversion tunnel should be installed in advance. And size of a cofferdam depends on type of a main dam. According to the Korea Dam Design Standard, if the main dam is a concrete dam, design flood of the cofferdam is 1~2 years flood frequency. This means that overflow of the cofferdam occurs one time for 1 or 2 years, therefore, stability of the cofferdam should be secured against any overflow problem. In this study, failure probability analysis for the concrete cofferdam is performed considering the overflow. First of all, limit state function of the concrete cofferdam is defined for overturning, sliding and base pressure, and upstream water levels are set as El. 501 m, El. 503 m, El. 505 m, El. 507 m. Also, after literature investigation research, probabilistic characteristics of various random variables are determined, the failure probability of the concrete cofferdam is calculated using the Monte Carlo Simulation. As a result of the analysis, when the upstream water level rises, it means overflow, the failure probability increases rapidly. In particular, the failure probability is largest in case of flood loading condition. It is considered that the high upstream water level causes increase of the upstream water pressure and the uplift pressure on the foundation. In addition, among the overturning, the sliding and the base pressure, the overturing is the major cause for the cofferdam failure considering the overflow.

Comparison of uniform and spatially varying ground motion effects on the stochastic response of fluid-structure interaction systems

  • Bilici, Yasemin;Bayraktar, Alemdar;Adanur, Suleyman
    • Structural Engineering and Mechanics
    • /
    • v.33 no.4
    • /
    • pp.407-428
    • /
    • 2009
  • The effects of the uniform and spatially varying ground motions on the stochastic response of fluid-structure interaction system during an earthquake are investigated by using the displacement based fluid finite elements in this paper. For this purpose, variable-number-nodes two-dimensional fluid finite elements based on the Lagrangian approach is programmed in FORTRAN language and incorporated into a general-purpose computer program SVEM, which is used for stochastic dynamic analysis of solid systems under spatially varying earthquake ground motion. The spatially varying earthquake ground motion model includes wave-passage, incoherence and site-response effects. The effect of the wave-passage is considered by using various wave velocities. The incoherence effect is examined by considering the Harichandran-Vanmarcke and Luco-Wong coherency models. Homogeneous medium and firm soil types are selected for considering the site-response effect where the foundation supports are constructed. A concrete gravity dam is selected for numerical example. The S16E component recorded at Pacoima dam during the San Fernando Earthquake in 1971 is used as a ground motion. Three different analysis cases are considered for spatially varying ground motion. Displacements, stresses and hydrodynamic pressures occurring on the upstream face of the dam are calculated for each case and compare with those of uniform ground motion. It is concluded that spatially varying earthquake ground motions have important effects on the stochastic response of fluid-structure interaction systems.

Slope Stability Analysis of Filldams by Modified Seismic Intensity Method (수정진도법에 의한 댐사면 안정해석)

  • 신동훈;이종욱
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.223-228
    • /
    • 2000
  • The current slope stability analysis of a filldam is based on the limit equilibrium method, and in calculation of safety factor during earthquake, adopts the seismic intensity method in which it considers a uniform seismic force from dam foundation to crest. However the observed behaviour of filldam during earthquake shows some different behaviour in that at the crest the measured acceleration is usually several times the ground acceleration. In this study, slope stability calculations of a filldam are provided based on the modified seismic intensity method, which can take into account the amplification phenomena of acceleration in the upper part of dam. And also the results of calculations are compared with that of current seismic intensity method.

  • PDF

Existing concrete dams: loads definition and finite element models validation

  • Colombo, Martina;Domaneschi, Marco;Ghisi, Aldo
    • Structural Monitoring and Maintenance
    • /
    • v.3 no.2
    • /
    • pp.129-144
    • /
    • 2016
  • We present a methodology to validate with monitoring data finite element models of existing concrete dams: numerical analyses are performed to assess the structural response under the effects of seasonal loading conditions, represented by hydrostatic pressure on the upstream-downstream dam surfaces and thermal variations as recorded by a thermometers network. We show that the stiffness effect of the rock foundation and the surface degradation of concrete due to aging are crucial aspects to be accounted for a correct interpretation of the real behavior. This work summarizes some general procedures developed by this research group at Politecnico di Milano on traditional static monitoring systems and two significant case studies: a buttress gravity and an arch-gravity dam.

An Effect of Uplift Pressure Applied to Concrete Gravity Dam on the Stress Intensity Factor (중력식 콘크리트 댐에 작용하는 양압력이 응력확대계수에 미치는 영향)

  • Lee Young-Ho;Jang Hee-Suk;Kim Tae-Wan;Jin Chi-Sub
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.6 s.84
    • /
    • pp.841-850
    • /
    • 2004
  • The modeling of uplift pressure within dam, on the foundation on which it was constructed, and on the interface between the dam and foundation is a critical aspect in the analysis of concrete gravity dams, i.e. crack stability in concrete dam can correctly be predicted when uplift pressures are accurately modelled. Current models consider a uniform uplift distribution, but recent experimental results show that it varies along the crack faces and the procedures for modeling uplift pressures are well established for the traditional hand-calculation methods, but this is not the case for finite element (FE) analysis. In large structures, such as dams, because of smaller size of the fracture process zone with respect to the structure size, limited errors should occur under the assumptions of linear elastic fracture mechanics (LEFM). In this paper, the fracture behaviour of concrete gravity dams mainly subjected to uplift Pressure at the crack face was studied. Triangular type, trapezoidal type and parabolic type distribution of the uplift pressure including uniform type were considered in case of evaluating stress intensity factor by surface integral method. The effects of body forces, overtopping pressures are also considered and a parametric study of gravity dams under the assumption of LEFM is performed.

DESIGN CONSIDERATIONS AND MONITORING RESULTS OF AN UNDERWATER EARTH DAM

  • Van Impe, W.F.
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.1210-1224
    • /
    • 2009
  • The present paper illustrates the outcome of the monitoring of the consolidation behavior of a soft foundation soil under a large submerged sand embankment. Measurements of settlements and excess pore water pressures showed a good agreement with predictions evaluated using the large strain consolidation theory. Soft soil improvement by means of deep mixing has been optimized. Moreover, the principles and developments of underwater geosynthetics applications are discussed.

  • PDF

An Experimental Study on Piping Failure of Earth Embankment (토질제체의 Piping 파괴에 대한 실험적 연구)

  • Jeong, Hyeong-Sik;Ryu, Jae-Il;An, Sang-Ro
    • Geotechnical Engineering
    • /
    • v.5 no.4
    • /
    • pp.17-26
    • /
    • 1989
  • The creep ratio, which has been applied as a measure to prevent piping failure in designing embankments, has been originally proposed for the protection of masonry or concrete dam from piping along the boundary surface between the foundation soil and the bottom of the structure. In this study, it has been investigated whether this creep ratio could be applied for the earth embankment through the model test and we reevaluated the required creep ratio in the present design criteria. Based on this research, it was concluded that a piping failure would always occur within the embankment body and not through the boundary surface between the embankment and foundation. Therefore it could be said that the present design criteria are illogical to determine the design creep ratio according to less permeable soil no matter whether the soil forms embankment or foundation.

  • PDF

Quantitative assessment of reclamation-dams from the sea by using combined seismic methods (해안 매립지 탄성파 탐사)

  • Kim Jung-Yul
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2002.09a
    • /
    • pp.85-100
    • /
    • 2002
  • This paper deals with a development of combined seismic methods, based on the application of Televiewer and seismic tomography, for the quantitative assessment of reclaimed body or dam at seashores in our county. The underground structure of reclaimed dam is very complex, mainly due to the unexpected exchange of rock fragments with the marine silty mud in conjunction with S.C.P. (Sand Compaction Pile) foundation, so that for several reasons only the use of Televiewer and seismic tomography for general application might not lead to a desirable resolution. Kinds of upgraded measuring and evaluation techniques for that are needed. For examples, a novel strategy for capturing the returning impulses from the outer side of casing plastic pipe is desired to be developed. For the tomograhy, one should be being more focussed on the study of raw data based on the wave propagation theory. In this paper, it is shown that such multidisciplinary approaches can be, by attempting to compare and jointly interpret the results from two methods, much efficient for understanding the reclaimed dam structure.

  • PDF