• Title/Summary/Keyword: Dam failure time

Search Result 39, Processing Time 0.024 seconds

Dam Failure and Unsteady Flow Analysis through Yeoncheon Dam Case(I) -Analysis of Dam Failure Time and Duration by Failure Scenarios and Unsteady Flow - (연천댐 사례를 통한 댐 파괴 부정류해석 및 하류 영향 검토(I) -댐 파괴 시나리오와 부정류 해석을 통한 지속시간 및 파괴시간 해석-)

  • Jang, Suk-Hwan
    • Journal of Environmental Science International
    • /
    • v.17 no.11
    • /
    • pp.1281-1293
    • /
    • 2008
  • This study aims at the estimation of dam failure time and dam failure scenario analysis of and applied to Yeoncheon Dam which was collapsed August 1st 1999, using HEC-HMS, DAMBRK-FLDWAV simulation model. As the result of the rainfall-runoff simulation, the lancet flood amount of the Yeoncheon Dam site was $10,324\;m^3/sec$ and the total outflow was $1,263.90\;million\;m^3$. For the dam failure time estimation, 13 scenarios were assumed including dam failure duration time and starting time, which reviewed to the runoff results. The simulation time was established with 30 minutes intervals between one o'clock to 4 o'clock in the morning on August 1, 1999 for the setup standard for each case of the dam failure time estimation, considering the arrival time of the flood, when the actually measured water level was sharply raising at Jeongok station area of the Yeoncheon Dam downstream, As results, dam failure arrival time could be estimated at 02:45 a.m., August 1st 1999 and duration time could be also 30 minutes. Those results and procedure could suggest how and when dam failure occurs and analyzes.

Analysis of Hydrograph by Dam Breach Shapes (댐 파괴형상에 따른 수문곡선 해석)

  • Park, Ki-Bum
    • Journal of Environmental Science International
    • /
    • v.16 no.4
    • /
    • pp.487-493
    • /
    • 2007
  • In this study is analysis which dams breach shapes are effect on peak discharge of dam-failure. The dam breach shapes and failure time are important peak discharge when dam failure. When dam failure times are 1hr, 2hr and 3hr condition for the ECRD and 0.1hr and 0.2hr for the CG and CFRD that breach shapes changed base length $B_b=1Hd,\;B_b=2Hd\;and\;B_b=3Hd$. As the results from DAMBRK(Dam Break model) peak discharge are increase base widths lengthen. As failure time is longer then peak discharge is decrease. So peak discharge is increase more short of dam failure time. Also peak discharge is increase become larger dam breach shapes.

Dam Failure and Unsteady Flow Analysis through Yeoncheon Dam Case(II) - Unsteady Flow Analysis of Downstream by Failure Scenarios - (연천댐 사례를 통한 댐 파괴 부정류해석 및 하류 영향 검토(II) -시나리오에 따른 댐 하류 부정류 해석 및 범랑특성 연구-)

  • Jang, Suk-Hwan
    • Journal of Environmental Science International
    • /
    • v.17 no.11
    • /
    • pp.1295-1305
    • /
    • 2008
  • This study aims at the analyze of unsteady downstream flow due to dam failure along dam failure scenario and applied to Yeoncheon Dam which was collapsed August 1st 1999, using HEC-RAS simulation model. The boundary conditions of this unsteady flow simulation are that dam failure arrival time could be at 02:45 a.m. August 1st 1999 and failure duration time could be also 30 minutes. Downstream 19.5 km from dam site was simulated for unsteady flow analysis in terms of dam failure and non-failure cases. For the parameter calibration, observed data of Jeonkok station were used and roughness coefficient was applied to simulation model. The result of the peak discharge difference was 2,696 to $1,745\;m^3/sec$ along the downstream between dam failure and non-failure and also peak elevation of water level showed meanly 0.6m difference. Those results of these studies show that dam failure scenarios for the unknown failure time and duration were rational because most results were coincident with observed records. And also those results and procedure could suggest how and when dam failure occurs and downstream unsteady flow analyzes.

The Effect of Flood Discharge due to Dam Breach on Downstream Channel (댐붕괴시 홍수가 하천하류에 미치는 영향)

  • Ahn, Sang-Jin;Lee, Jun-Geun;Yeon, In-Sung;You, Hyung-Gyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1666-1670
    • /
    • 2006
  • The purpose of this study is to analyze how a downstream channel is affected in case of hypothetical dam failure. The object of it is Hwacheon dam basin within the basin of North Han river. This study has analyzed the influence on Pyeonghwa(Peace) dam and Hwacheon dam supposing that the Imnam dam in North Korea on the upper stream of North Han river is failed hypothetically at the MFWL(maximum flood water level) by a deluge of rain. The model applied at the main study is NWS(National Weather Service) FLDWAV(Flood Wave Routing Model). Dam breach characteristics data are analyzed by making nine hypothetical scenarios on the basis of other studies on the shape and size of dam breach, time of failure and so on. Expected peak discharge through the breach is verified to have the propriety in comparison with empirical function which is developed on the basis of the case of dam breach in the foreign countries and it is observed that peak discharge is more increasing, as the time of breach gets shorter and the breach width gets bigger. As a result of main study, even though the Imnam dam is hypothetically failed down, there has no influence on the Hwacheon dam of the downstream as the extended Pyeonghwa dam on the downstream controls the volume of discharge properly.

  • PDF

An Analysis of Outflow Hydrograph Resulting from an Earth Dam-Break (Earth Dam의 파괴로 인한 유출수문곡선의 해석)

  • Han, Kun Yeun;Lee, Jong Tae;Lee, Won Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.5 no.2
    • /
    • pp.41-50
    • /
    • 1985
  • The mathematical analysis of the outflow hydrograph resulting from earth dam-break was studied. DBFW(Dam Break Flood Wave) model based on the breach mechanism and reservoir storage equation was developed and was applied to the Teton and Buffalo-Creek dam. The modeling results showed that the shape of outflow hydrograph, peak discharge and failure duration time had a good agreement with the data analyzed by NWS. The breach mechanisms which exert influence on the outflow hydrograph were consisted of geomorphological characteristics of the reservoir, breach mode, breach width and failure duration time. The earth dams in Korea were classified into four types by the reservoir geomorphology, and water surface elevation-failure duration time-peak discharge relationships were also presented. The methodological procedure made in this paper will provide a basic contribution to dam-break study in river system.

  • PDF

Strain-based seismic failure evaluation of coupled dam-reservoir-foundation system

  • Hariri-Ardebili, M.A.;Mirzabozorg, H.;Ghasemi, A.
    • Coupled systems mechanics
    • /
    • v.2 no.1
    • /
    • pp.85-110
    • /
    • 2013
  • Generally, mass concrete structural behavior is governed by the strain components. However, relevant guidelines in dam engineering evaluate the structural behavior of concrete dams using stress-based criteria. In the present study, strain-based criteria are proposed for the first time in a professional manner and their applicability in seismic failure evaluation of an arch dam are investigated. Numerical model of the dam is provided using NSAD-DRI finite element code and the foundation is modeled to be massed using infinite elements at its far-end boundaries. The coupled dam-reservoir-foundation system is solved in Lagrangian-Eulerian domain using Newmark-${\beta}$ time integration method. Seismic performance of the dam is investigated using parameters such as the demand-capacity ratio, the cumulative inelastic duration and the extension of the overstressed/overstrained areas. Real crack profile of the dam based on the damage mechanics approach is compared with those obtained from stress-based and strain-based approaches. It is found that using stress-based criteria leads to conservative results for arch action while seismic safety evaluation using the proposed strain-based criteria leads to conservative cantilever action.

Failure Probability Analysis of Concrete Cofferdam Considering the Overflow in Flood Season (홍수시 월류를 고려한 콘크리트 가물막이댐의 파괴확률 산정)

  • Hong, Won Pyo;Song, Chang Geun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.5
    • /
    • pp.30-38
    • /
    • 2020
  • In order to construct a dam, the diversion facility such as cofferdam and a diversion tunnel should be installed in advance. And size of a cofferdam depends on type of a main dam. According to the Korea Dam Design Standard, if the main dam is a concrete dam, design flood of the cofferdam is 1~2 years flood frequency. This means that overflow of the cofferdam occurs one time for 1 or 2 years, therefore, stability of the cofferdam should be secured against any overflow problem. In this study, failure probability analysis for the concrete cofferdam is performed considering the overflow. First of all, limit state function of the concrete cofferdam is defined for overturning, sliding and base pressure, and upstream water levels are set as El. 501 m, El. 503 m, El. 505 m, El. 507 m. Also, after literature investigation research, probabilistic characteristics of various random variables are determined, the failure probability of the concrete cofferdam is calculated using the Monte Carlo Simulation. As a result of the analysis, when the upstream water level rises, it means overflow, the failure probability increases rapidly. In particular, the failure probability is largest in case of flood loading condition. It is considered that the high upstream water level causes increase of the upstream water pressure and the uplift pressure on the foundation. In addition, among the overturning, the sliding and the base pressure, the overturing is the major cause for the cofferdam failure considering the overflow.

Numerical Analysis of Rainfall Induced Landslide Dam Formation

  • Do, Xuan Khanh;Regmi, Ram Krishna;Jung, Kwansue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.245-245
    • /
    • 2015
  • In the recent years, due to long-lasting heavy rainfall events, a large number of landslides have been observed in the mountainous area of the world. Such landslides can also form a dam as it blocks the course of a river, which may burst and cause a catastrophic flood. Numerical analysis of landslide dam formation is rarely available, while laboratory experimental studies often use assumed shape to analyze the landslide dam failure and flood hydraulics in downstream. In this study, both experimental and numerical studies have been carried out to investigate the formation of landslide dam. Two case laboratory experiments were conducted in two flumes simultaneously. The first flume (2.0 m 0.6 m 0.5 m) was set at $22^{\circ}$ and $27^{\circ}$ slope to generate the landslide using rainfall intensity of 70.0 mm/hr. On the other hand, the second flume (1.5 m 0.25 m 0.3 m) was set perpendicularly at the downstream end of the first flume to receive the landslide mass forming landslide dam. The formation of landslide dam was observed at $15^{\circ}$ slope of the second flume. The whole processes including the landslide initiation and movement of the landslide mass into the second channel was captured by three digital cameras. In numerical analysis, a two-dimensional (2D) seepage flow model, a 2D slope stability model (Spencer method) and a 2D landslide dam-geometry evaluation model were coupled as a single unit. This developed model can determine the landslide occurrence time, the failure mass and the geometry of landslide dam deposited in the second channel. The data obtained from numerical simulation results has good agreement with the experimental measurements.

  • PDF

Nonlinear dynamic behavior of Pamukcay Earthfill Dam

  • Terzi, Niyazi U.;Selcuk, Murat E.
    • Geomechanics and Engineering
    • /
    • v.9 no.1
    • /
    • pp.83-100
    • /
    • 2015
  • Water and energy supplies are the key factors affecting the economic development and environmental improvement of Turkey. Given their important role and the fact that a large part of Turkey is in seismically active zones dams should be accurately analyzed since failure could have a serious impact on the local population environment and on a wider level could affect the economy. In this paper, a procedure is proposed for the static, slope stability, seepage and dynamic analysis of an earth dam and the Pamukcay embankment dam. The acceleration time history and maximum horizontal peak ground accelerations of the $Bing\ddot{o}l$ (2003) earthquake data was used based on Maximum Design Earthquake (MDE) data. Numerical analysis showed that, the Pamukcay dam is likely to experience moderate deformations during the design earthquake but will remain stable after the earthquake is applied. The result also indicated that, non-linear analysis capable of capturing dominant non-linear mechanism can be used to assess the stability of embankment dams.

Derivation of Dimensionless Routing Curves for Dam Failure Flood Wave (댐 붕괴 홍수파 해석을 위한 무차원 홍수추적곡선의 유도)

  • Lee, Jong Tae;Han, Kun Yeun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.2
    • /
    • pp.87-99
    • /
    • 1992
  • The types of dam-break have been classified as instantaneous and gradual failure. Equations for estimating the peak outflow have been derived respectively as a metric unit. New dimensionless routing curves have been deveoloped based on the distance parameter which has been used in SMPDBK and hydro-geometric characteristics of dams and reservoirs in Korea. These suggested curves can be used for any case of the flow of supercritical or subcritical. The computed peak flowrate shows the trend of decreasing dependence on the Froude numbers as it increases. These curves are applied to Hyogi dam. and the results have good agreements with the data observed in the peak discharges, peak elevations and flood travel time. The simplified dam-break model in this study would contribute effectively to forecast the dam-break flood in this country with minimum informations in a short time.

  • PDF