• 제목/요약/키워드: Dam construction upstream

검색결과 80건 처리시간 0.03초

Zooplankton and Phytoplankton Dynamics with the Construction of River Mouth Dam in Kum River Estuary, Korea

  • Kim, Say-Wa;Han, Myung-Soo;Lee, Kyung;Choi, Young-Kil;Yoo, Kwang-Il
    • 생태와환경
    • /
    • 제35권2호통권98호
    • /
    • pp.141-144
    • /
    • 2002
  • The construction of river mouth dam has prevented seawater from backwarding to upstream in Kum river estuary since 1990. Field observation on environmental factors, and zooplankton and phytoplankton dynamics have been carried out three times with two month interval in the summer and autumn in 2000 at three selected stations in Kum river estuary. Blockade of seawater flowing backward to upstream caused sharp contrast of zooplankton fauna and phytoplankton flora between upstream and downstream of the river mouth dam. Freshwater cladocerans i.e., Bosmina longisrostris and Daphnia galeata dominated in the upstream, and marine copepods of Acartia omorii and Paracalanus crassirostris occurred abundantly in downstream of the dam. Freshwater diatoms did not distributed in the downstream of the dam except Melosira varians, while marine diatom of Cylidrotheca closterium occurred in benthic waters bath in upstream and downstream of the dam. The construction of the river mouth dam seems to play an ecological role to blockade the input of marine organism into the upstream in Kum river estuary.

군위댐 건설 공사가 저서성대형무척추동물 군집 변동에 미치는 영향 (The Influence of Gunwi Dam Construction on Community Fluctuations of Benthic Macroinvertebrates)

  • 권혁영;이미진;박진영;이종은
    • 한국환경과학회지
    • /
    • 제23권5호
    • /
    • pp.807-817
    • /
    • 2014
  • Benthic macroinvertebrates were seasonally sampled from upstream and downstream of the Gunwi Dam construction site from 2006 to 2012. Totally 148 and 165 species were collected at the upstream and downstream sampling sites, respectively. At the upstream area after dam construction, there was no significant change of the numbers of non-insect taxa, but at the downstream area, the non-insect taxon numbers were increased gradually. The individual ratio of Ephemeroptera and Diptera had higher value than the other taxa in both of up and downstream. The trichopteran individual ratios were increased in upstream sites, but decreased in downstream sites from 2010. Also, non-insects and coleopteran individual ratios were decreased in upstream, but increased in downstream after completion of dam construction. The annual range of fluctuation in community indices narrowed after construction. According to a functional feeding group analysis, the individual ratios of FC (Filtering Collector) were increased, and GC (Gathering Collector) and SC (Scraper) were decreased in upstream sites annually. In contrast, the annual individual ratios of FC were decreased, and GC and SC were increased in the downstream sites.

An alternative upstream method for the Zhelamuqing tailings impoundment construction of a Copper Mine in China

  • Wei, Zuoan;Chen, Yulong;Yin, Guangzhi;Yang, Yonghao;Shu, Weimin
    • Geomechanics and Engineering
    • /
    • 제19권5호
    • /
    • pp.383-392
    • /
    • 2019
  • How to safely and economically dispose mining tailings is a challenge to mine operators. This paper presents an alternative upstream method for tailings dam construction, termed as the template construction method (TCM), which has been successfully implemented at Zhelamuqing tailings impoundment since 2004. By the beginning of 2015, the tailings dam wall had reached 95 m in height for the 46 upstream raises, with the total height of the dam including the starter dyke being 128 m. The proposed TCM is relatively simple and cost-effective and provides a good way for constructing rapidly raising tailings dam based on this case.

수문곡선 분리를 통한 댐 유입량 평가 (Dam Inflow Evaluation using Hydrograph Analysis)

  • 정영훈
    • 한국농공학회논문집
    • /
    • 제60권3호
    • /
    • pp.95-105
    • /
    • 2018
  • Understanding the composition of the dam inflow can improve the efficiency of dam operation considering the seasonal characteristics. Hydrograph analysis is one of the methods to identify the characteristics of dam inflow. In addition, baseflow separation on the dam inflow can be affected by anthropogenic influences depending on dam locations. In this regard, the objectives of this study are 1) to analyze yearly and monthly baseflow contribution to the dam inflow and 2) to compare the baseflow contribution to the inflow in dams located upstream and downstream of the watershed. The result shows that the estimated baseflow index was smaller in the upstream dams compared to the downstream dams. Discharge from the upstream water infrastructure including dams and reservoirs can be a part of inflow into the downstream water infrastructure. Based on this scenario, the discharge regulated from the upstream dam could lead to overestimation of baseflow contribution to inflow into the downstream dam. We expect that the results from this study elucidate the role and function of dams and hence, contribute to the efficient operation of dams located in the upstream and the downstream of the watershed.

남강댐하류의 물리적 하천교란 평가 (Assessment of Physical River Disturbances in the Namgang-dam Downstream)

  • 김기홍
    • 한국환경복원기술학회지
    • /
    • 제11권3호
    • /
    • pp.74-86
    • /
    • 2008
  • To assessment the disturbances of the Namgang caused by dam construction, upstream area was selected for the reference reach and downstream area was selected for the comparison reach. And these reaches were surveyed and analyzed according to the assessment criteria of the river disturbances.The artificial factors of river disturbances were classified as river improvement works, dam construction and aggregate dredging. The indexes were physical factors as like epifaunal (bottom), embeddedness, velocity/depth regime, sediment deposition, channel flow status, channel alteration, frequency of riffles, bank stability, vegetative protection, riparian zone etc.The assessment results showed 46% of the assessment criteria which was serious status in dam downstream area and 89.5% of it which was excellent status in dam upstream.Finally, the results showed that physical river environment in downstream area was disturbed by the discharge control and the interception of sediment discharge by dam, consequently this disturbance give rise to impact of ecosystem in river.

상류 수위관측소 자료를 활용한 하류 지점 수위 예측 (Prediction of Water Level at Downstream Site by Using Water Level Data at Upstream Gaging Station)

  • 홍원표;송창근
    • 한국안전학회지
    • /
    • 제35권2호
    • /
    • pp.28-33
    • /
    • 2020
  • Recently, the overseas construction market has been actively promoted for about 10 years, and overseas dam construction has been continuously performed. For the economic and safe construction of the dam, it is important to prepare the main dam construction plan considering the design frequency of the diversion tunnel and the cofferdam. In this respect, the prediction of river level during the rainy season is significant. Since most of the overseas dam construction sites are located in areas with poor infrastructure, the most efficient and economic method to predict the water level in dam construction is to use the upstream water level. In this study, a linear regression model, which is one of the simplest statistical methods, was proposed and examined to predict the downstream level from the upstream level. The Pyeongchang River basin, which has the characteristics of the upper stream (mountain stream), was selected as the target site and the observed water level in Pyeongchang and Panwoon gaging station were used. A regression equation was developed using the water level data set from August 22th to 27th, 2017, and its applicability was tested using the water level data set from August 28th to September 1st, 2018. The dependent variable was selected as the "level difference between two stations," and the independent variable was selected as "the level of water level in Pyeongchang station two hours ago" and the "water level change rate in Pyeongchang station (m/hr)". In addition, the accuracy of the developed equation was checked by using the regression statistics of Root Mean Square Error (RMSE), Adjusted Coefficient of Determination (ACD), and Nach Sutcliffe efficiency Coefficient (NSEC). As a result, the statistical value of the linear regression model was very high, so the downstream water level prediction using the upstream water level was examined in a highly reliable way. In addition, the results of the application of the water level change rate (m/hr) to the regression equation show that although the increase of the statistical value is not large, it is effective to reduce the water level error in the rapid level rise section. Accordingly, this is a significant advantage in estimating the evacuation water level during main dam construction to secure safety in construction site.

홍수조절댐에서의 배사관 설치에 따른 상류 하천의 하상변동에 관한 수치모의 연구 (Numerical Analysis for Bed Changes in the Upstream Channel due to the Installation of Sediment Release Openings in the Flood Control Dam)

  • 지운;손광익;김문모
    • 한국수자원학회논문집
    • /
    • 제42권4호
    • /
    • pp.319-329
    • /
    • 2009
  • 홍수피해를 경감시키고 홍수조절을 목적으로 계획되는 홍수조절용댐의 경우 홍수 발생 기간 외에는 상류와 하류 하천간의 흐름 차단을 억제하고 상류로부터 유입되는 유사가 댐 상류 부분에 퇴적되는 현상을 방지하기 위해 댐에 상시 개방되어 있는 배사관을 설치하기도 한다. 국내에서는 임진강 유역의 홍수피해 저감을 위해 건설되는 한탄강홍수조절댐에 배사관과 생태통로를 설치하도록 계획되었다. 본 연구에서는 1차원 HEC-6 모형을 이용하여 한탄강홍수조절댐 건설로 인한 댐 상류의 퇴사현상을 댐 건설 전의 현상과 비교 분석하였으며 연평균유량 조건뿐만 아니라 연간 유량변동을 고려한 대표유량수문곡선을 적용하여 퇴사현상을 모의하였다. 수치모의 결과, 댐 건설로 인한 하류단 수위 변화가 발생하더라도 하상변동의 영향은 댐에서 상류 2 km 구간을 넘지 않는 것으로 나타났다. 또한 댐 건설 후 배사관의 설치 유무에 따른 배사관 주변과 댐 상류 하상 변화를 예측하기 위해 2차원 RMA2 및 SED2D 모형을 이용하였으며 한탄강홍수조절용댐의 댐 저부에 설치된 배사관의 배사효과는 저수지 내의 퇴적고를 저감시키는 효과가 있는 것으로 나타났다.

Effect of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam

  • Jun, Byoung-Ho;Shin, Hyun-Suk;Yoon, Jae-Young
    • Korean Journal of Hydrosciences
    • /
    • 제5권
    • /
    • pp.17-31
    • /
    • 1994
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in the country. The other is the DWOPER(Dynamic Wave Operational Model) package conducted on four different scenarios: (1) before the construction of the Keumkangsan-Dam and the Peace-Dam; (2) the exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam); (3) the exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam) ; (4) the exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the Hwachun-Dam need to be modified.

  • PDF

화천댐의 홍수량 및 수위에 미치는 평화댐의 영향 분석 (Influence of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam)

  • 전병호;신현석;이재철;윤용남
    • 물과 미래
    • /
    • 제26권1호
    • /
    • pp.93-101
    • /
    • 1993
  • 화천댐 상류에는 최근 금강산댐과 평화댐이 건설되었으며 이로인해 홍수유출 및 수위에 큰 변화를 보여왔다. 본 연구에서는 가용한 유역 자료를 사용하여 상류조건의 변화에 따른 화천댐으로의 유입량 및 수위 변화를 모의하였다. 모의를 위해서는 수문학적 추적 방법중 저류함수법과 수리학적 홍수 추적 방법중 미국 NWS의 DWOPER(Dynamic Wave Operational Model)Package를 사용하였다. 홍수 추적은 1) 금강산댐과 평화댐 건설전, 2) 금강산댐 유역제외(평화댐 건설전), 3) 금강산댐 유역제외(평화댐 건설후), 4) 평화댐의 수문폐쇄시등의 4가지 경우에 대하여 모의하였다. 그 결과 상류댐의 건설로 인해 화천댐 유역의 유입량과 수위가 감소되는 것으로 나타났다. 이같은 결과는 화천댐의 최적운영을 위하여 새로운 댐 조작기준의 설정이 필요함을 의미한다고 사료된다.

  • PDF

수치해석모형에 의한 홍수추적 (Flood Routing Using Numerical Analysis Model)

  • 이용직;권순국
    • 한국농공학회지
    • /
    • 제31권1호
    • /
    • pp.117-130
    • /
    • 1989
  • In this study, an implicit one-dimensional model, DWRM(Dynamic Wave Routing Model) was developed by using the four-point weighted difference method. By applying the developed model to the Keum River, the parameters were calibrated and the model applicability was tested through the comparison between observed and computed water levels. In addition, the effects of the construction of an estuary dam to the flood wave were estimated as a result of the model application. The results of the study can be summarized as follows; 1. The roughness coefficients were evaluated by comparison between observed and computed water level at Jindu, Gyuam and Ganggyeung station in 1985. The Root Mean Squares for water level differences between observed and computed values were 0.10, 0.11, 0. 29m and the differences of peak flood levels were 0.07, 0.02, 0. 07m at each station. Since the evaluated roughness coefficients were within the range of 0.029-0.041 showing the realistic value for the general condition of rivers, it can be concluded that the calibration has been completed. 2. By the application of model using the calibrated roughness coefficients, the R. M. S. for water level differences were 0.16, 0.24, 0. 24m and the differences of peak flood level were 0.17, 0.13,0.08 m at each station. The arrival time of peak flood at each station and the stage-discharge relationship at Gongju station agreed well with the observed values. Therefore, it was concluded that the model could be applied to the Keum River. 3. The model was applied under conditions before and after the construction of the estuary dam. The 50-year frequency flood which had 7, 800m$^3$/sec of peak flood was used as the upstream condition, and the spring tide and the neap tide were used as the downstream condition. As the results of the application, no change of the peak flood level was showed in the upper reaches of 19.2km upstream from the estuary dam. For areas near 9.6km upstream from the estuary dam, the change of the peak flood level under the condition before and after the construction was 0. 2m. However considering the assumptions for the boundary conditions of downstream, the change of peak flood level would be decreased.

  • PDF