• Title/Summary/Keyword: Dam construction

Search Result 708, Processing Time 0.025 seconds

An Analysis of Groundwater Level Fluctuation Caused by Construction of Groundwater Dam (지하댐 건설에 따른 유역 내 지하수위 변화 특성 해석)

  • Kim, Jong-Tae;Kim, Man-Il;Chung, Il-Moon;Kim, Nam-Won;Jeong, Gyo-Cheol
    • The Journal of Engineering Geology
    • /
    • v.19 no.2
    • /
    • pp.227-233
    • /
    • 2009
  • Most of hydrological processes of groundwater recharge generally are occupied a rainfall, and recharged an aquifer along infiltrate into subsurface. These processes mainly have an influence by hydrological characteristics and topographic gradient of the aquifer. Development of water resources and its management is not good because of temporal and spatial disproportion in local rainfall. In order to deal with insufficiency of water resources from now on, development of groundwater dam requires a plan of a sustainable of new water resources. These are necessary that investigation of construction area of groundwater dam, effective groundwater development interconnected with surface water and groundwater, and assessment of an application of groundwater dam for utilization of water resources. Tn this study we were derived the input data by geological survey, hydraulic and hydrological analysis around Hoengchun-river, located in Hadong-gun, Gyeongsangnam Province where is a plan area for construction of groundwater dam. Based on input data we were carried out the interconnected analysis of surface water and groundwater using the SWAT-MODFLOW, and predicted groundwater fluctuation of its construction before and after.

Study on Design and Construction of CFRD under Unfavorable Conditions (불리한 조건에서의 콘크리트 표면차수벽형 석괴댐 설계 및 시공)

  • Park Dong-Soon;Kim Hyoung-Soo
    • The Journal of Engineering Geology
    • /
    • v.16 no.1 s.47
    • /
    • pp.97-107
    • /
    • 2006
  • Or this study, prevailing design and construction methods of dam under various unfavorable conditions are summarized. for example, foundation treatment with large scale alluvium site or weathered rock mass, dam constructing techniques with unfavorable topographic conditions are studied for the better understanding of relating engineers. Also, zoning by using weak rocks and sand-gravel fill techniques are summed up.

Coupled thermal and structural analysis of roller compacted concrete arch dam by three-dimensional finite element method

  • Bayagoob, Khaled H.;Noorzaei, Jamaloddin;Abdulrazeg, Aeid A.;Al-Karni, Awad A.;Jaafar, Mohd Saleh
    • Structural Engineering and Mechanics
    • /
    • v.36 no.4
    • /
    • pp.401-419
    • /
    • 2010
  • This paper focuses on the development, verification and application of a three-dimensional nite element code for coupled thermal and structural analysis of roller compacted concrete arch dams. The Ostour Arch dam located on Ghezel-Ozan River, Iran, which was originally designed as conventional concrete arch dam, has been taken for the purpose of verication of the nite element code. In this project, RCC technology has been ascertained as an alternative method to reduce the cost of the project and make it competitive. The thermal analysis has been carried out taking into account the simulation of the sequence of construction, environmental temperature changes, and the wind speed. In addition, the variation of elastic modulus with time has been considered in this investigation using Concard's model. An attempt was made to compare the stresses developed in the dam body five years after the completion of the dam with those of end of the construction. It was seen that there is an increase in the tensile stresses after five years over stresses obtained immediately at the end of construction by 61.3%.

A change of local meteorological environment according to dam construction of Nakdong-River -II. Estimation using numerical model- (낙동강 수계 중의 댐 건설에 의한 주변의 국지기상환경 변화 -II. 수치모델을 이용한 추정-)

  • 전병일;이영미
    • Journal of Environmental Science International
    • /
    • v.11 no.4
    • /
    • pp.281-288
    • /
    • 2002
  • This study was carried out for reading the change of local meteorological environment according to dam construction of Nakdong-river using numerical model. The study used PSU/NCAR Mesoscale Model version5(MM5) for inquiring effect of formation of artificial lake after dam construction. The colleague simulated temperature mixing ratio, latent heat flux and sensible heat flux in two cause of existing lake and not. Temperature and mixing ratio in southwest of Andong lake increased because of the air that was warm and moist above the lake moved to southwest due to the northeasterly wind. In the case of existing lake around Andong, latent heat flux increased much in the daytime after sunrise. However, sensible heat flux decreased but it didn't change distinctly in southwest of Andong like the other values.

A Case Study on Deformation Behaviors of CFRD with Water Level Change (수위변화에 따른 CFRD의 변형거동 사례분석)

  • Yun, Jung-Mann;Yea, Geu-Guwen;Kim, Hong-Yeon;Lee, Jae-Yeon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.1
    • /
    • pp.21-31
    • /
    • 2018
  • This paper analyzes the displacements of CFRD which was completed by field measurement. It is to understand the deformation behavior of the dam body according to the water level change from the impounding time. And it was compared with numerical analysis results. As a result of measuring the behavior of the dam crest and downstream slope according to impounding, horizontal displacements in axis direction of the dam, upstream and downstream displacements and settlements occurred mostly when the water level reaches about half of the dam height. The displacements continued until the water level reached its maximum. After that, it showed a constant convergence regardless of the water level. Horizontal displacements of the face slab which is the most important in CFRD were similar at all locations. The Horizontal displacements of the face slab showed the trends of increasing in winter and decreasing in summer due to the effect of the outside temperature before impounding. Also, the displacements increased until the water level reached about half of the dam height. After that, they decreased with rising in water level. As a result, the face slab behaviors according to seasonal change after impounding as well as water level condition. It is judged because of the material characteristics of the concrete slab. Numerical analysis showed slightly different maximum settlement and depth of occurrence from the measuring data after construction of the dam. It is considered that this is due to various design and construction differences such as the estimation of input parameters in analysis, construction period, and the layer thickness of construction. For the overall period of the dam, the settlements were mostly completed during the construction period and some settlements occurred in the early days of impounding and then converged.

Change of Fish Habitat in a Downstream Reach of a Stream Due to Dam Construction (댐 건설에 따른 하류 하도 어류 서식처 변화 분석)

  • Kim, Seung Ki;Choi, Sung-Uk
    • Ecology and Resilient Infrastructure
    • /
    • v.1 no.2
    • /
    • pp.61-67
    • /
    • 2014
  • Dam construction changes flow regime and stream morphology in the downstream reach. These affect the ecosystem of downstream reach. This study provides the assessment of the impact of dam construction on the downstream fish habitat. For this, physical habitat simulations are carried out. The quasi-steady model is used for hydraulic simulation, The hydraulic model used in the present study is capable of simulating the morphological change due to sediment transport. The change of the fish habitat condition is investigated using the flow scenarios before and after the dam construction. Simulation results indicate that the habitat suitability decreases frequently due to hydropeaking after dam construction. In addition, erosion is expected to occur in a reach downstream of dam. This is a long term effect due to the shut-down of sediment supply from the upstream reach.

Hydrological Stability Analysis of the Existing Soyanggang Multipurpose Dam

  • Ko, Seok-Ku;Shin, Yong-Lo
    • Korean Journal of Hydrosciences
    • /
    • v.7
    • /
    • pp.37-49
    • /
    • 1996
  • This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.

  • PDF

Ecological Impact Analysis of a Stream on the Dam Construction Using Species Biotic Index (SBI) as a Tool of Ecosystem Health Assessment

  • An, Kwang-Guk;Kim, Jai-Ku
    • Korean Journal of Ecology and Environment
    • /
    • v.40 no.4
    • /
    • pp.495-502
    • /
    • 2007
  • Species biotic index (SBI), based on a fish assemblage, was applied to a stream assessment using long-term ecological fish data set (1996 to 2001) in Boryong dam area, which is located in the mainstream of Ungchun Stream of Chungnam province, Korea. According to the methods of Hilsenhoff (1988), the scores of tolerance guild assigned 10 classes to each species by its habitat and feeding guild, but modified current 7 criteria to 5 scoring standards due to unclear borderline among species. Relative abundance in the species number of upper stream guilds was only 7% of the total, whereas the abundance in the species number of middle to downstream upper stream guilds was 64%. Mean SBI, based on dataset in Site 1 during 1995-2001 averaged 5.10, which was judged as a "good" condition by the rank criteria of SBI. Before the dam construction, mean SBI in the Site 1 was 4.61, indicating a "good" condition, but after the dam construction, mean SBI was 5.60, indicating a "fair" condition. Trajectory analysis in the Site 1 showed significantly (One-way ANOVA, $F_{6,21}=3.26$, p=0.02) different among years, reflecting the changes of fish composition and population density by the dam construction, whereas Site 2 showed no significant changes ($F_{6,21}=1.00$, P =0.45) difference among years. Mean SBI prior to the dam construction in the Site 3 was 4.52 but after the construction, the value was 6.30, indicating a distinct difference between the pre- and post-dam construction. Trajectory analysis at the Site 3 supported this fact: Values of SBI showed significantly ($F_{6,21}$=14.37, p<0.01) different. Mean SBI was 4.67 in the Site 4, indicating a "good" condition in the health and the health rank was same as the sampling sites 1, 2, and 4. Trajectory in the Site 4 showed no significant ($F_{6,21}=2.35$, p=0.07) difference among the years. Overall, our trajectory analysis indicated that three of four sampling sites (sites 1, 3, 4) showed significant decreases (n=7, p<0.05) and that the proportions of sensitive species declined evidently in the sites 1 and 2 and the tolerant species increased in the dam sites. Our outcomes may be used as a key data for diagnosis of the long-term ecological impact in the future in the watershed.

Assessment of the Effect of Sand Dam on Groundwater Level: A Case Study in Chuncheon, South Korea

  • Yifru, Bisrat;Kim, Min-Gyu;Chang, Sun Woo;Lee, Jeongwoo;Chung, Il-Moon
    • The Journal of Engineering Geology
    • /
    • v.30 no.2
    • /
    • pp.119-129
    • /
    • 2020
  • Sand dam is a successful water harvesting method in mountainous areas with ephemeral rivers. The success is dependent on several factors including material type, hydrogeology, slope, riverbed thickness, groundwater recharge, and streamflow. In this study, the effect of a sand dam on the groundwater level in the Chuncheon area, South Korea was assessed using the MODFLOW model. Using the model, multiple scenarios were tested to understand the groundwater head before and after the construction of the sand dam. The effect of groundwater abstraction before and after sand dam construction and the sand material type were also assessed. The results show, the groundwater level increases substantially after the application of a sand dam. The comparison of model outputs, simulated groundwater head before and after sand dam application with and without pumping well, shows a clear difference in the head. The material type has also an effect on the groundwater head. As the conductivity of the material increases, the head showed a significant rise.

An Analysis of Streambed Changes Downstream of Daecheong Dam

  • Seo, Hyeong-Deok;Jeong, Sang-Man;Kim, Lee-Hyung;Choi, Kyu-Ho
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.1
    • /
    • pp.103-108
    • /
    • 2008
  • Riverbed change is greatly influenced by artificial factors such as dam construction, gravel collection, and river improvement. This study simulated a long-term bed change based on the GSTARS3 model using actual data from the area downstream of the Geum River Daecheong Dam and compared the estimation with a section of the actual measurement. As a result, it was found that the section of the actual measurement was far lower than the result of the simulation in terms of long-term bed change. While the area downstream of Daecheong Dam displayed approximately an average of 2.29 m of streambed degradation on average while the upper stream area showed approximately 0.63 m of bed degradation over 24 years. In the simulation of the area downstream of Daecheong Dam based on the GSTARS3 model, similar bed degradation was observed. However, a great difference was detected between the result and the actual measurement. According to the cause analysis, the riverbed in the area downstream of Daecheong Dam has continuously degraded due to the dam construction and mass collection of gravel. The mass collection of gravel was the main cause of riverbed change. It was found that about 76% of all riverbed degradation was caused by the mass collection of gravel.