• 제목/요약/키워드: Dam Discharge

검색결과 401건 처리시간 0.028초

횡성댐 상류유역에 대한 수질관리모형의 적용 (Application of Water-Quality Management Model for Upstream Basin of Hoengsung Dam)

  • 김상호;이을래
    • 한국물환경학회지
    • /
    • 제24권2호
    • /
    • pp.239-246
    • /
    • 2008
  • In this study, an optimized deterministic water-quality model was constructed to estimate water quality of a river and lake in the upstream basin of a dam. A stochastic water-quality analysis using reliability analysis technique was applied to the model. The model was tested in the 13.9 km reach from Maeil stage station of Kyechun to Hoengsung Dam of Sum River. After finding hydraulic characteristics from nonuniform flow analysis, Broyden-Fletcher-Goldfarb-Shanno (BFGS) optimization technique for model calibration was applied to determine optimum reaction parameters, and model verification was performed based on these. The stochastic model, using Mean First­Order Second­-Moment (MFOSM) and Monte-Carlo methods, was applied to the same reach as the deterministic study. Variations of discharge and water quality in headwater were considered, as well as variations of hydraulic coefficients and reaction coefficients. The statistical results of output variables from MFOSM were similar to those from the Monte-Carlo method. Risk analysis using MFOSM and Monte-Carlo methods presented the probabilities of some locations in the Hoengsung Lake violating existing water-quality standards in terms of DO and BOD.

간편법에 의한 소규모저수지의 수문학적 안전성 평가 (Hydrologic Safety Evaluation of Small Scale Reservoir by Simplified Assesment Method)

  • 이주헌;양승만;김성준;강부식
    • 한국농공학회논문집
    • /
    • 제53권2호
    • /
    • pp.9-17
    • /
    • 2011
  • Based on the statistical annual report, there are 17,649 reservoirs are operating for the purpose of agricultural water supply in Korea. 58 % of entire agricultural reservoirs had been constructed before 1948 which indicate the termination of required service life and rest of those reservoirs have also exposed to the dam break risk by extreme flood event caused by current ongoing climate change. To prevent damages from dam failure accident of these risky small size dams, it is necessary to evaluate and manage the structural and hydrological safety of the reservoirs. In this study, a simplified evaluation method for hydrologic safety of dam is suggested by using Rational and Creager formula. Hydrologic safety of small scale dams has evaluated by calculating flood discharge capacity of the spillway and compares the results with design frequency of each reservoir. Applicability and stability of suggested simplified method have examined and reviewd by comparing the results from rainfall-runoff modeling with dam break simulation using HEC-HMS. Application results of developed methodology for three sample reservoirs show that simplified assessment method tends to calculate greater inflow to the reservoirs then HEC-HMS model which lead lowered hydrologic safety of reservoirs. Based on the results of application, it is expected that the developed methodology can be adapted as useful tool for small scale reservoir's hydrologic safety evaluation.

자연하천 유량산정 프로그램 개발 (Development of a Stream Discharge Estimation Program)

  • 이상진;황만하;이배성;고익환
    • 한국농공학회논문집
    • /
    • 제48권1호
    • /
    • pp.27-38
    • /
    • 2006
  • In this study, we developed a program to estimate discharge efficiently considering major hydraulic characteristic including water level, river bed, water slope and roughness coefficient in a natural river. Stream discharge was measured at Gongju gauge station located in the down stream of the Daechung Dam during normal and dry seasons from 2003 to 2004. The developed model was compared with the results from the existing rating curve at T/M gage stations, and was used for runoff analyses. Evaluating the developed river discharge estimation program, it was applied during 1983-2004 that base flow separation method and RRFS (Rainfall Runoff Forecasting System) which is based on SSARR (Streamflow Synthesis And Resevoir Regulation). The result presents the stage-discharge curve creator range at the Gong-ju is overestimated by approximately $10-20\%$, especially at the low stage. It is attributed to the hydraulic characteristics at the study. The discharge simulated by the RRFS and base flow separation, which is calibrated using the measurement at the early spring and late fall season during relatively d]v season, shows the least errors. The coefficient of roughness at Gongju station varied with the high and low water level.

Modifications of nutrient regime, chlorophyll-a, and trophic state relations in Daechung Reservoir after the construction of an upper dam

  • Ingole, Neha P.;An, Kwang-Guk
    • Journal of Ecology and Environment
    • /
    • 제40권1호
    • /
    • pp.24-33
    • /
    • 2016
  • Background: Previous numerous studies on watershed scale demonstrated that the constructions of upper dams may influence the below dams due to modifications of flow regime and nutrient inputs. Little is known about how the dam constructions influence the downstream lakes or reservoirs in the regional scale. This study demonstrates how the construction of upper dam (i.e., Yongdam Dam) influences nutrient regime, trophic relations, and empirical models in Daechung Reservoir (DR). Yongdam Dam was constructed at the upstream region of DR in year 2000. Results: The analysis of hydrological variables showed that inflow and discharge in the DR were largely reduced after the year 2000. The construction of upper dam construction also resulted in increases of water temperature, pH and conductivity (as an indicator of ionic content) in the DR. Empirical models of TP-CHL and N:P ratio-CHL suggested that stronger responses of CHL to the phosphorus were evident after the upper dam construction, indicating that algal production at a unit phosphorus increased after the upper dam construction. Mann-Kendall tests on the relations of N:P ratios to TN showed weak or no relations ($t_{au}=-0.143$, z = -0.371, p = 0.7105) before the dam construction, while the relation of N:P ratios to TP showed strong in the periods of before- ($t_{au}=-0714$, z = -2.351, p = 0.0187) and after the construction ($t_{au}=-0.868$, z = -4.270, p = 0.0000). This outcome indicates that TP is key determinant on N:P ratios in the reservoir. Scatter Plots on Trophic State Index Deviations (TSIDs) of "TSI(SD) - TSI(CHL)" against "TSI(TP) - TSI(CHL)" showed that the dominance of clay turbidity or light limitation was evident before the upper dam construction [TSI(TP) - TSI(CHL) > 0 and TSI(SD) - TSI(CHL) > 0] and phosphorus limitation became stronger after the dam construction [(TSI(TP) - TSI(CHL) < 0 and TSI(SD) - TSI(CHL) > 0]. Conclusions: Overall, our analysis suggests that the upper dam construction modified the response of trophic components (phytoplankton) to the nutrients or nutrient ratios through the alteration of flow regime, resulting in modifications of ecological functions and trophic relations in the low trophic levels.

댐 방류 경보방송의 전달 특성 및 적정 위치 선정에 관한 연구 (A Study on Travelling Characteristics and Choice of Proper Location of Dam Discharge Alarm Broadcasting)

  • 김대군;김재수
    • 대한환경공학회지
    • /
    • 제31권8호
    • /
    • pp.635-640
    • /
    • 2009
  • 1960년대 이후 연강수량의 변동 폭이 커짐에 따라 유량조절을 통해 가뭄과 홍수를 방지하기 위한 댐이 건설되었다. 이러한 댐의 경우, 일정 저수량이 되면 수량을 조절하기 위해 수문을 개방하여 저수지 내 많은 양의 물을 방류하게 되는데 이 때 강 또는 강 주변의 주민 및 행락객들의 생명과 재산 등의 큰 피해가 발생할 수 있다. 따라서 이러한 피해를 예방하고 알리기위해 울리는 경보방송은 방류소음이나 주변의 환경적인 요인에 영향을 받지 않고 사람들에게 명료하게 전달될 수 있어야 하지만 지금까지 별다른 연구없이 경험적으로 설치하다보니 경보방송이 효과적으로 전달되지 못하고 그 전달거리 또한 정확히 알수 없었다. 이러한 관점에서 본 연구는 다목적 댐 중의 하나인 대청댐의 방류소음과 경보방송의 거리별 측정 및 분석을 통하여 주파수별 특성과 음압레벨을 파악해보고 이를 토대로 Cadna-A라는 시뮬레이션 프로그램을 이용하여 추가 경보방송지의 적정위치를 예측해 보았다. 이러한 결과는 향후 경보방송의 설계 및 설치시 유용한 자료를 제공할 것으로 사료된다.

강원도 토석류 산사태의 특성에 관한 연구 (A Study on Characteristics of Landslides of Debris Flow in Gangwon-do)

  • 유남재;전상현;박남선
    • 산업기술연구
    • /
    • 제28권A호
    • /
    • pp.3-10
    • /
    • 2008
  • This paper is to investigate the characteristics of debris flow landslides in Gangwon Province through literature review, data collection and analyses and site investigation. As results of data analyses about landslides occurred currently in this province, the landslide in the form of debris flow is found to be 55 %. Therefore major loss and costs are caused by discharge of soil and rock fragments from landslide. From results of analyzing the geometrical characteristics of landslide, length of most of landslide is less than 200 m, their width is in the range of 10 - 40 m, most of them are know to be occurred in lower elevation than 400 m. Slope angle is in the range of 25 - 35 degrees. Comparing the period of rainfall intensity with the time of landslide being occurred, occurrence of landslide is quite related to duration of a heavy rainfall. For measures of controlling water flow discharge and debris flow, considering geological and topographical ground conditions, appropriate selection and building check dam, erosion control dam and ring net is very beneficial for reducing the loss and costs caused by the landslide of debris flow.

  • PDF

댐 배수조작에 따른 저수지내 탁수변화 모의 - 대청댐을 대상으로 - (Simulation of Turbid Water in the Stratified Daecheong Reservoir during Gate Operation)

  • 이재일;서세덕;이규성;하성룡
    • 환경영향평가
    • /
    • 제18권6호
    • /
    • pp.377-386
    • /
    • 2009
  • Due to severe flooding, the long-term residence of turbidity flows within the stratified Daecheong Reservoir have lengthened. A long-term residence of turbidity flows within the stratified Daecheong Reservoir after floods has been major environmental issue. The objective of this study was to assess the impact to water supply from the hydrodynamics and turbidity outflow. Two gate operation scenarios were investigated. Scenario A refers to gate operations according to rainfall events, and scenario B refers to gate operations according to inflow. From the results of secenario A, the SS concentrations decreased from 0.44mg/l to 0.54mg/l at the front of the dam, whereas SS concentrations increased from 0.24mg/l to 1.24mg/l at the intake points at Munhi and Daejeon. From the results of scenario B, the SS concentrations decreased from 0.61mg/l to 0.83mg/l at the front of Dam; howeve, SS concentrations also decreased from 0.16mg/l to 0.48mg/l at the intake points at Munhi and Daejeon. It seems that it may be more efficient to control turbidity by creating additional outflows of generated discharge after intensive rainfalls than not.

댐하류하천정비사업의 댐 운영개선 효과 경제성 분석 (II) -경제적 편익 및 비용분담률 분석 (Economic Analysis of Dam Operation Improvement by Dam Downstream River Improvement Works (II)-Economic Benefit and Cost Allocation Analysis)

  • 유승훈;이광만;이을래
    • 한국수자원학회논문집
    • /
    • 제44권9호
    • /
    • pp.765-776
    • /
    • 2011
  • 댐이 건설된 이후 댐직하류 하천구간은 하천구역내 사유지 경작과 하상주차장 등의 입지, 사주가 발달하여 하폭감소에 의한 문제가 발생하였다. 특히 하천정비의 미흡으로 홍수시 하천통수능력이 감소하여 유역전반에 영향을 미치고 있다. 댐 운영조건도 일부 제약을 받고 있는데 이의 해소를 통한 댐 기능의 회복과 운영의 효율성 제고가 하천의 치수 안정성 확보와 함께 개선대책이 필요하였다. 따라서 댐 운영관리개선과 연계된 댐직하류 하천정비사업이 시행되고 있는데 사업의 타당성, 경제적 편익, 비용배분 및 투자비 회수방안 등과 같은 문제점이 제기되었다. 아울러 댐사업자가 하천사업을 주관한 사례가 없어 이들 사업에 대한 경제성 평가의 객관적 해석과 편익에 대한 정량화 방법의 개발이 요구되었다. 본 연구는 댐직하류 하천정비사업의 사업주체(국가와 용수 및 발전사업자 등)간의 합리적인 건설비용 배분방법을 제시하고 그 적정성을 평가하고자 하였다. 평가결과, 시범 적용 3개 댐의 경제적 편익은 14,405.8백만원/년으로 추정되었고, 편익 중 사업시행자인 K-water의 재무적 가치는 40%, 정부의 공공성 편익은 60%로 분석되었다.

나팔형 여수로를 가진 기존댐의 수리·수문학적 안전성평가에 관한 연구 (A Study on Evaluation for Hydraulic and Hydrologic Safety of an Existing Dam with Morning Glory Spillway)

  • 신은우;김경덕
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제8권2호
    • /
    • pp.269-278
    • /
    • 2004
  • 본 연구에서는 절대적인 안전성이 요구되는 댐의 홍수방어능력을 확보하기 위해서 나팔형 여수로를 가진 기존댐에 대한 수리 수문학적 안전성을 평가하였다. 검토결과 현재의 설계홍수량인 520cms(EL. 170.30m)에 대해서는 홍수소통과 연직관의 부압발생의 문제가 없는 것으로 나타났으나, 오리피스 흐름으로 변환되는 EL. 170.70m를 초과하는 방류에는 한계가 있는 것으로 나타났으며, 웨어의 정점 부근에서 부압발생의 가능성이 있는 것으로 판단된다. 여유고를 고려한 댐최고수위는 EL. 170.5m를 넘지 않아야 하는데, 금번 저수지 홍수추적 결과 댐최고수위 EL. 172.46m로 약 2m 상회하는 것으로 나타나 이에 대한 근본적인 대책이 필요하다고 판단된다.