• Title/Summary/Keyword: Dam Area

Search Result 768, Processing Time 0.026 seconds

Assessment of the Effect of Sand Dam on Groundwater Level: A Case Study in Chuncheon, South Korea

  • Yifru, Bisrat;Kim, Min-Gyu;Chang, Sun Woo;Lee, Jeongwoo;Chung, Il-Moon
    • The Journal of Engineering Geology
    • /
    • v.30 no.2
    • /
    • pp.119-129
    • /
    • 2020
  • Sand dam is a successful water harvesting method in mountainous areas with ephemeral rivers. The success is dependent on several factors including material type, hydrogeology, slope, riverbed thickness, groundwater recharge, and streamflow. In this study, the effect of a sand dam on the groundwater level in the Chuncheon area, South Korea was assessed using the MODFLOW model. Using the model, multiple scenarios were tested to understand the groundwater head before and after the construction of the sand dam. The effect of groundwater abstraction before and after sand dam construction and the sand material type were also assessed. The results show, the groundwater level increases substantially after the application of a sand dam. The comparison of model outputs, simulated groundwater head before and after sand dam application with and without pumping well, shows a clear difference in the head. The material type has also an effect on the groundwater head. As the conductivity of the material increases, the head showed a significant rise.

A Study of CFRD using a Gravel Fill (하상사력재를 이용한 CFRD의 연구)

  • Jeong, Chan-Kyun;Noh, Tae-Gil;Lee, Song
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.842-853
    • /
    • 2008
  • In the construction of dam, the key factor which decides the type of dam is security of materials resource. Because of the large scale earth work, the ability to supply the materials is essential part about economical efficiency. The research is the case study about controlling the plan to secure the material resources in the design of Buhang multipurpose dam. In case of Buhang multipurpose dam, at that time of basic design, it was planned to use a rock fill material. From the detail investigation about the river bed accumulative layer widely spread on the submerged district on the basic design, the research is accomplished to replace rock material with gravel material. After the investigation of whole reserves of gravel material, estimation of conformity as dam construction material from analysis of grain size distribution, the case study of oversea construction, and the material property comparison between rock fill material and gravel fill material, it is verified th possibility of using the gravel fill. Thereafter, the analysis of dam stability using a gravel fill material is accomplished. Finally, A gravel fill material can be used as the main construction material of CFRD, therefore the efficiency of resource recycling in the submerged area is maximized, and the established plan is more advantageous to stability, constructibility, environmentibility than the case of using a rock fill.

  • PDF

Analysis of Debris Flow Disaster Area according to Location Change of Check Dam using Kanako-2D (Kanako-2D를 이용한 사방댐 위치 변화에 따른 토석류 피해지 분석)

  • Kim, Young Hwan;Jun, Kye-Won
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.1
    • /
    • pp.128-134
    • /
    • 2018
  • With the increase in frequency of typhoons and heavy rains following the climate change, the scale of damage from the calamities in the mountainous areas has been growing larger and larger, which is different from the past. For the case of Korea where 64% of land is consisted of the mountainous areas, establishment of the check dams has been drastically increased after 2000 in order to reduce the damages from the debris flow. However, due to the lack of data on scale, location and kind of check dams established for reducing the damages in debris flow, the measures to prevent damages based on experience and subjective basis have to be relied on. Under this study, the high-precision DEM data was structured by using the terrestrial LiDAR in the Jecheon area where the debris flow damage occurred in July 2009. And, from the numerical models of the debris flow, Kanako-2D that is available to reflect the erosion and deposition action was applied to install the erosion control facilities (water channel, check dam) and analyzed the effect of reducing the debris flow shown in the downstream.After installing the erosion control facilities, most of debris flow moves along the water channel to reduce the area to expand the debris flow, and after installing the check dam, the flow depth and flux of the debris flow were reduced along with the erosion. However, as a result of analyzing the diffusion area, flow depth, erosion and deposition volume of the debris flow generated from the deposition part after modifying the location of the check dams with the damages occurring on private residences and agricultural land located on the upstream area, the highest reduction effect was shown when the check dam is installed in the maximal discharge points.

Bhumipol Dam Operation Improvement via smart system for the Thor Tong Daeng Irrigation Project, Ping River Basin, Thailand

  • Koontanakulvong, Sucharit;Long, Tran Thanh;Van, Tuan Pham
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.164-175
    • /
    • 2019
  • The Tor Tong Daeng Irrigation Project with the irrigation area of 61,400 hectares is located in the Ping Basin of the Upper Central Plain of Thailand where farmers depended on both surface water and groundwater. In the drought year, water storage in the Bhumipol Dam is inadequate to allocate water for agriculture, and caused water deficit in many irrigation projects. Farmers need to find extra sources of water such as water from farm pond or groundwater as a supplement. The operation of Bhumipol Dam and irrigation demand estimation are vital for irrigation water allocation to help solve water shortage issue in the irrigation project. The study aims to determine the smart dam operation system to mitigate water shortage in this irrigation project via introduction of machine learning to improve dam operation and irrigation demand estimation via soil moisture estimation from satellite images. Via ANN technique application, the inflows to the dam are generated from the upstream rain gauge stations using past 10 years daily rainfall data. The input vectors for ANN model are identified base on regression and principal component analysis. The structure of ANN (length of training data, the type of activation functions, the number of hidden nodes and training methods) is determined from the statistics performance between measurements and ANN outputs. On the other hands, the irrigation demand will be estimated by using satellite images, LANDSAT. The Enhanced Vegetation Index (EVI) and Temperature Vegetation Dryness Index (TVDI) values are estimated from the plant growth stage and soil moisture. The values are calibrated and verified with the field plant growth stages and soil moisture data in the year 2017-2018. The irrigation demand in the irrigation project is then estimated from the plant growth stage and soil moisture in the area. With the estimated dam inflow and irrigation demand, the dam operation will manage the water release in the better manner compared with the past operational data. The results show how smart system concept was applied and improve dam operation by using inflow estimation from ANN technique combining with irrigation demand estimation from satellite images when compared with the past operation data which is an initial step to develop the smart dam operation system in Thailand.

  • PDF

Inflow Water into Saemangeum Area from Other Watershed (타 유역에서 새만금 유역으로 유입되는 수량 변화)

  • Choi, Jin-Kyu;Son, Jae-Gwon;Kim, Tai-Cheol
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.543-546
    • /
    • 2003
  • This study was carried out to survey the amount of inflow water from Geumgang reservoir, Yongdam dam and Sumjin dam into Saemangeum area, and to provide the basic data to use and manage the water resources of Saemangeum district effectively. The total volume of inflow water from the above hydraulic facilities was measured as $775.8{\times}10^6m^3$ in 2002.

  • PDF

Monthly Water Balance Analysis of Hwanggang Dam Reservoir for Imjin river in Border Area using Optical Satellite (광학위성을 활용한 임진강 접경지역 황강댐 저수지의 월단위 물수지 분석)

  • KIM, Jin-Gyeom;KANG, Boo-Sik;YU, Wan-Sik;HWANG, Eui-Ho
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.24 no.4
    • /
    • pp.194-208
    • /
    • 2021
  • The Hwanggang Dam in North Korea is located upstream of the Imjin River which is a shared river in the border area. It is known to have a reservoir capacity of 350 million cubic meters and releases a discharge primarily for generating hydroelectric power and partly for transferring to the Yesung River basin. Due to the supply of water from the Hwanggang Dam to another basin, the flow of the Imjin River has decreased, which has a negative impact on the water supply, river maintenance flow, water quality, and ecological environment in Korea. However, due to the special national security issue of the South and North Korea border region, the hydrological data is not shared, and the operation method of the Hwanggang Dam is unknown, so there is a risk of damage to the southern part of the downstream area. In this study, the monthly diversion as the long-term runoff concept was derived through the calibrated hydrological model based on optical remotely sensed Images and water balance analysis. As a result of the water balance analysis from January 2019 to September 2021, the average diversion of the Hwanggang Dam was 29.2m3/s, which is equivalent to 922 million tons per year and 45.6% of the annual inflow of 2.02 million tons into the Hwanggang Dam.

Simulation of the Flood Damage Area of the Imjin River Basin in the Case of North Korea's Hwanggang Dam Discharge (북한 황강댐 유출량에 따른 임진강유역 홍수 피해 지역 시뮬레이션)

  • Park, Sung-Jae;Lee, Chang-Wook
    • Korean Journal of Remote Sensing
    • /
    • v.34 no.6_1
    • /
    • pp.1033-1039
    • /
    • 2018
  • In Korea, every year during the summer season, typhoons and torrential rains cause floods and damage to property. In particular, the Imjin River basin is characterized by steep slopes, narrow upstream areas, and low flat downstream areas, which are vulnerable to floods. In addition, damages occurred due to unauthorized discharge in the Hwanggang Dam, a large dam upstream of the Imjin River in North Korea. In order to prevent such flood damage, Korea is constructing the Gunnam Flood Control Site in 2010 to prevent flood damage. However, even after the construction of the flood control zone, the flood control capacity is only 20% of the maximum water level of the Hwanggang dam. This study used LAHARZ_py program to calculate flood damage area in the northern part of Gyeonggi province. As a result, when the discharge of Hwanggang dam exceeding the flood control ability of Gunnam flood control zone occurs, damage to Yeoncheon-gun and Paju-si of Gyeonggi-do was expected. This study will be useful as a material to prepare for flood damage.

Time harmonic analysis of dam-foundation systems by perfectly matched layers

  • Khazaee, Adib;Lotfi, Vahid
    • Structural Engineering and Mechanics
    • /
    • v.50 no.3
    • /
    • pp.349-364
    • /
    • 2014
  • Perfectly matched layers are employed in time harmonic analysis of dam-foundation systems. The Lysmer boundary condition at the truncation boundary of the PML region has been incorporated in the formulation of the dam-foundation FE model (including PML). The PML medium is defined in a way that the formulation of the system can be transformed into time domain. Numerical experiments show that applying Lysmer boundary conditions at the truncation boundary of the PML area reduces the computational cost and make the PML approach a more efficient technique for the analysis of dam-foundation systems.

Assessmnnt of Optinal Amount of Water Resources by Groundwater Dam (지하댐에 의한 안정적 적정개발가능량 평가)

  • Park Chang Kun;Park Jae Hyeon;Kim Dae Kun;Yang Jung Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.260-264
    • /
    • 2005
  • Effective use of water resources has become a social problem because the deficit of water comes from population growth and Industrial development. Therefore, the conjunctive operation of surface water and groundwater will become an alternative. Groundwater has many advantages for the evaporation and effect of rainfall compared with surface water. Although the available amount of groundwater is small, groundwater dam can be used complementarily because of the sustainable supply of water. A calculating technique of the optimal amount of water resources by the groundwater dam was developed. A pilot site was selected to assess the optial amount of groungwater for the designed groungwater dam. If the developed technique is more refined by the measured data, the groundwater dam will become a good alternative to develope the water resources in the water deficit area.

  • PDF

Achievements of Environmental Restoration During Multipurpose Dam Construction - In case of Wheng Seong multipurpose dam - (댐 건설과 환경복원에 대한 우리의 노력 - 강원도 횡성군 횡성다목적댐 환경복원 사례를 중심으로 -)

  • Won, Hi-Young
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.3 no.3
    • /
    • pp.100-104
    • /
    • 2000
  • We have put considerable time and work to find a proper solution to restore the damaged natural environment due to Dam construction, and to restore the field around Dam on the basis of Environmentally Sound Sustainable Development(E.S.S.D). We've replaced the site which had been used as a equipment space with the natural-oriented park, have made a wildlife corridor for those animals which have been living in the area in a newly constructed road to in an out, and have introduced a streamside plant to organize green-space. We've received incredible favor from visitors and residents for the environment restoration. The natural-oriented park plays a role of giving the citizens to the pleasure and the comfort.

  • PDF