A Study of Improvements in the Standards of Cost Estimate for the New Excellent Technology in Construction (건설 신기술의 원가산정기준 개선방안에 대한 연구)

  • Lee, Ju-hyun;Tae, Yong-Ho;Baek, Seung-Ho;Kim, Kyoungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.65-76
    • /
    • 2022
  • The New Excellent Technology (NET) designation system, introduced in 1989 for the purpose of promoting the development of domestic construction technology and enhancing national competitiveness, reviews the statement of construction cost of new technologies. And the cost reduction effect such as design, construction, and maintenance cost and the effect of reducing the construction duration are evaluated as an evaluation criteria of economic feasibility. However, in this evaluation process, differences of opinion between the institution of construction cost estimating standard management and the new technology developer about unique technologies frequently occur. In addition it is difficult to objectively compare the construction duration with existing similar technologies because there is no information on productivity as the current cost estimating standards for new technologies only present the required amount per unit quantity. In this study, the current state of cost estimating criteria review procedure, evaluation criteria, and cost estimating standards establishment method were analyzed when screening for the designation of a new construction technologies, and compared with overseas cost estimating standards, measures to improve the cost estimating standards of current construction new technologies were suggested. Through the improved cost estimating standards of this study, it is expected that cost information on new technologies will be provided to clients in more detail than the current ones, and the availability and applicability of new construction technologies would be improved by simplifying the construction cost calculation process more.

Process Progress Pattern Analysis based on Daily Work Report Analysis (작업일보 데이터 분석 기반 공정 진척 패턴 분석)

  • Ko, Yong-Ho;Shin, Young-Keun;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.156-157
    • /
    • 2016
  • Construction projects have shown a dramatic increase in size and complexity during the recent years that precise management has been recognized as one of key factors leading the project to success. It has been investigated that management in construction sites is generally done based on the experience of site engineers. Such experience based decision making lacks reliability that could bring disastrous results such as delay and cost overruns. The purpose of this study is to suggest a process progress pattern analysis method that is expected to be used as an objective reference for site managers to aid the decision making done regarding process progress management.

  • PDF

A Study on the Development of Work-Crew based Daily-Productivity for Representative B.O.Q Item in Road Project (도로공사 대표공종의 생산성 정보 개발에 대한 연구)

  • Seo, Ji-Hyeong;Park, Hyung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.42-53
    • /
    • 2011
  • This study is to present a method of compiling consistently accurate construction cost estimates in minimum of time. There are two kind of applications for estimating system based on quantity-per-unit and the daily work-crew. The former system is still applied 45% as a estimating method to construction job site by the second half of 2010. However, it is necessary for quantity-per-unit to complement the defect of standard integrating specification and improve the integrating method to the various construction conditions. The later system is intended to represent a standard or basic core which can be adopted in many type of construction estimating used across the wide variety of construction in advanced countries. In this study daily work-crew based on productivity is applied to the representative B.O.Q Item in road project. These results are compared to productivity of Japan and U.S.A estimated under the similar circumstances.

Economic Feasibility of Common Utility Tunnel based on Cost-Benefit Analysis (비용편익 분석에 기초한 공동구의 경제적 타당성 평가)

  • Kang, Yeong Ku;Choi, Ik Chang
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.29-36
    • /
    • 2015
  • Common utility tunnel is essential to the daily lives of people underground utilities (electricity, gas and supply facilities such as water, communication facilities, sewer facilities, etc.) to improve the appearance by co-acceptance and disaster prevention, important for the conservation of the city's population was concentrated road construction the city-based facilities. There is recognition of the importance of the various supply treatment facilities in common utility tunnel as infrastructure to accommodate joint according to the city expanded, the demand for infrastructure. In this paper, a cost-benefit analysis using a one-time occurrence, without simply relying on cost or current cost, project manager for the city-dimensional feasibility study conducted, the user level of the maintenance costs and user costs, including social costs items from various angles can be investigated and proposed a mechanism of economic feasibility common utility tunnel. Evaluation of the proposed technique is cost-benefit and cost caused by installing common utility tunnel the existing pipeline area - was investigated by the benefit analysis, extended and repeated common utility tunnel installation depends much affected by the excavation, so users of reducing the number of repeat excavation convenience can be seen that this occurs.

INCREASING REALISM OF CONSTRUCTION SIMULATION THROUGH INTEGRATION OF OPERATIONAL AND MANAGERIAL ASPECTS

  • Sangwon Han;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.821-826
    • /
    • 2009
  • Current construction simulation approaches mostly focus on operation aspects of construction projects, ignoring managerial aspects which can radically change operational profiles (e.g., number of resources, expected productivity level, or daily working hours) during the course of construction. As a result, these approaches may mislead construction managers into unrealistic execution plans as well as make them difficult to find potential performance improvement areas. As an effort to address this issue, this paper establishes a comprehensive construction modeling framework which integrates operational and managerial aspects of construction projects. The proposed modeling framework will provide construction managers with more accurate, more reliable, and more realistic simulation results thus reducing the likelihoods of schedule delays and cost overruns.

  • PDF

Collection and Utilization of the Construction Labor Information Using PDA and Barcode (PDA 및 바코드 기술을 이용한 건설 노무정보의 수집 및 활용)

  • Oh Se-Wook;Kim Young-Suk;Lee Jun-Bok;Kim Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.65-75
    • /
    • 2004
  • Labor management has been considered as an important task in construction industry. However, labor management has not yet been systematically performed because of the wide variety of factors of construction industry such as the field work, the complexity of the work process, the daily employment. Most of the present labor managements are performed to collect the information of the number of labors input during the work period, and to calculate labor cost. The information of activities performed by labors can be effectively used to analyze project status related to schedule, cost and productivity, but the present labor management systems are not based on the activities. The main objective of this research is to develop a labor information management system using IT tools in order to measure the number of labors input on the activities, and to convert the labor information into productivity data. It is anticipated that the effective use of the developed system would be able to effectively assist the scheduling and cost management of a project.

MAINTENANCE COST ANALYSIS FOR LARGE HOSPITAL BUILDINGS

  • Sy-Jye Guo;Tzu-Ping Lo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.310-315
    • /
    • 2009
  • Large hospitals such as medical centers provide not only medical services, but also carry the responsibilities for emergency refuges, medical researches and education. The function of large hospitals is as important as other infrastructure systems such as highways, bridges, and utilities. When disasters occur, the hospitals have to provide emergency medical services for victims and support the patient's needs of health. In order to keep a smooth operation of hospitals, the maintenance management of hospital buildings should be carefully investigated. However, there are few researches focused on maintenance management issues of hospital buildings. This paper investigated the National Taiwan University Hospital (NTUH) and established a maintenance cost database. The NTUH is the best-known and most high-renowned medical center in Taiwan in which more than 4,000 employees serving approximately 2,000 in-patients and 7,000 out-patients daily. The data were collected from the NTUH which consisted of 16,228 maintenance records in the past ten years. This paper analyzed these data to obtain various characteristics of maintenance records, and revealed the key items of maintenance cost for large hospital buildings, which can provide the facility manager of hospital buildings to execute a proper maintenance policy for hospital buildings.

  • PDF

Resource-constrained Scheduling at Different Project Sizes

  • Lazari, Vasiliki;Chassiakos, Athanasios;Karatzas, Stylianos
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.196-203
    • /
    • 2022
  • The resource constrained scheduling problem (RCSP) constitutes one of the most challenging problems in Project Management, as it combines multiple parameters, contradicting objectives (project completion within certain deadlines, resource allocation within resource availability margins and with reduced fluctuations), strict constraints (precedence constraints between activities), while its complexity grows with the increase in the number of activities being executed. Due to the large solution space size, this work investigates the application of Genetic Algorithms to approximate the optimal resource alolocation and obtain optimal trade-offs between different project goals. This analysis uses the cost of exceeding the daily resource availability, the cost from the day-by-day resource movement in and out of the site and the cost for using resources day-by-day, to form the objective cost function. The model is applied in different case studies: 1 project consisting of 10 activities, 4 repetitive projects consisting of 40 activities in total and 16 repetitive projects consisting of 160 activities in total, in order to evaluate the effectiveness of the algorithm in different-size solution spaces and under alternative optimization criteria by examining the quality of the solution and the required computational time. The case studies 2 & 3 have been developed by building upon the recurrence of the unit/sub-project (10 activities), meaning that the initial problem is multiplied four and sixteen times respectively. The evaluation results indicate that the proposed model can efficiently provide reliable solutions with respect to the individual goals assigned in every case study regardless of the project scale.

  • PDF

Design criteria of wind barriers for traffic -Part 2: decision making process

  • Kim, Dong Hyawn;Kwon, Soon-Duck;Lee, Il Keun;Jo, Byung Wan
    • Wind and Structures
    • /
    • v.14 no.1
    • /
    • pp.71-80
    • /
    • 2011
  • This study presents a decision making process for installation of wind barrier which is used to reduce the wind speed applied to running vehicles on expressway. To determine whether it is needed to install wind barrier or not, cost and benefit from wind barrier are calculated during lifetime. In obtaining car accidental risk, probabilistic distribution of wind speed, daily traffic volume, mixture ratio in the volume, and duration time for wind speed range are considered. It is recommended to install wind barrier if benefit from the barrier installation exceed construction cost. In the numerical examples, case studies were shown for risk and benefit calculation and main risky regions on Korean highway were all evaluated to identify the number of installation sites.

Field Application of Surface Insulation Curing Method to Cold Weather Concreting (한중콘크리트의 현장 표면단열 양생공법 시공사례 연구)

  • Kim Jong-Back;Lim Choon-Goun;Han Min-Cheol;Kim Seoung-Soo;Han Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.25-28
    • /
    • 2005
  • This study investigates the field application of surface insulation curing method, which combined double layer bubble sheet(DBS) and thick-curing-material(TCM) for cold weather concreting. According to the test, deck slab, curing only upper section with DBS and TCM, does not make big different temperature history with that, curing both upper and bottom section during daily average temperature 6.5t. It is concluded that combination of DBS and TCM in only upper section can be safely cured in early period of time during cold water concreting. The field test was carried out with this favourable data. The upper deck slab was insulated by combination of DBS and TCM, and the construction was surrounded by tent. in order to protect from outside wind. The test result shows that the lowest temperature of deck slab indicated 6$ ^{circ}C $. It demonstrated that this curing method can resist early frost and save construction cost in the side of management and saving labor cost, compared with previous method. In addition, the column specimen, combined both form and bubble board, exhibited favorable temperature history, due to internal hydration heat insulation effect.

  • PDF