• 제목/요약/키워드: Daecheong Dam

검색결과 116건 처리시간 0.03초

EVALUATION OF THE WATER RESOURCES ASPECT OF THE OPERATING RESULTS OF THE DAECHEONG MULTIPURPOSE DAM

  • Noh, Jaek-young
    • Water Engineering Research
    • /
    • 제5권1호
    • /
    • pp.17-36
    • /
    • 2004
  • This paper evaluated the water resources aspect of the operating results of the Daecheong Multipurpose Dam for the last 21 years. The elements that were evaluated included the amount of water supply from the dam. volume of outflow from the regulating dam, changes in the runoff volume at the dam site and downstream, and variations in the water supply capacity of the Daecheong Multipurpose Dam and the Geum River Barrage Dam situated in the estuary. The rainfall-runoff model was used to evaluate the changes in the runoff volume, and the water balance analysis system was used to evaluate the variations in the dams'water supply capacities. The volume of domestic and industrial water supply from the Daecheong Multipurpose Dam increased to 6.1 times for the last 21 years from 61${\times}$$10^6$$m^3$ in 1981 to 375${\times}$$10^6$$m^3$in 2001. The rate of outflow to inflow of the Daecheong Dam was analyzed 1.30 times in dry season, 1.12 times in semi-dry season, and 0.90 times in rainy season. The volume of inflow to the Geum River Barrage Dam down- stream after the dam's construction increased to 1.25 times in dry season and 1.02 times in semi-dry season and decreased to 0.94 times in rainy season. The water supply capacity of the estuary barrage dam almost did not change in cases with or without the Daecheong Multipurpose Dam, but storages were largely affected by the outflows of the Daecheong Multipurpose Dam.

  • PDF

An Analysis of Streambed Changes Downstream of Daecheong Dam

  • Seo, Hyeong-Deok;Jeong, Sang-Man;Kim, Lee-Hyung;Choi, Kyu-Ho
    • 한국방재학회 논문집
    • /
    • 제8권1호
    • /
    • pp.103-108
    • /
    • 2008
  • Riverbed change is greatly influenced by artificial factors such as dam construction, gravel collection, and river improvement. This study simulated a long-term bed change based on the GSTARS3 model using actual data from the area downstream of the Geum River Daecheong Dam and compared the estimation with a section of the actual measurement. As a result, it was found that the section of the actual measurement was far lower than the result of the simulation in terms of long-term bed change. While the area downstream of Daecheong Dam displayed approximately an average of 2.29 m of streambed degradation on average while the upper stream area showed approximately 0.63 m of bed degradation over 24 years. In the simulation of the area downstream of Daecheong Dam based on the GSTARS3 model, similar bed degradation was observed. However, a great difference was detected between the result and the actual measurement. According to the cause analysis, the riverbed in the area downstream of Daecheong Dam has continuously degraded due to the dam construction and mass collection of gravel. The mass collection of gravel was the main cause of riverbed change. It was found that about 76% of all riverbed degradation was caused by the mass collection of gravel.

용담댐 운영 시나리오에 따른 대청댐 저수량 변화에 관한 연구 (A Study on Daily Water Storage Simulation of the Daecheong Dam by Operation Scenario of the Yongdam Dam)

  • 노재경;김현호
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2005년도 학술발표회 논문집
    • /
    • pp.1403-1407
    • /
    • 2005
  • In order to analyze the water storage of the Daecheong dam after constructing the Yongdam dam situated in upstream, a daily cascaded simulation model for analyzing water storages in the Yongdam-Daecheong dams was developed. Operation scenarios of the Yongdam dam were selected to 8 cases with the combinations of downstream outflows and water supplies to the Jeonju region. Daily water storages in the Daecheong dam was analyzed daily by simulating from 1983 to 2004. The results are summarized as follows. Firstly, water supplies from the Daecheong dam were analyzed to amount $1,964.2Mm^3$ on a yearly average in case without the Yongdam dam. In case with the Yongdam dam, water supplies from the Daecheong dam were analyzed to amount $1,858.7\~1,927.3Mm^3$ in case with downstream outflow of $5\;m^3$ is, and were analyzed to amount $1,994.9\~2,017.8Mm^3$ in case with downstream outflow of $10\;m^3/s $. These values are compared to $1,649Mm^3$ applied in design. Secondly, reservoir use rate which was defined rate of water supply to effective water storage reached $241.3\% in case without the Yongdam dam. In case with the Yongdam dam, reservoir use rate reached $228.3\~236.8\% In case with downstream outflow of $5\;m^3/s$, and reached $245.1\~247.9\% in case with downstream outflow of $10\;m^3/s$. Thirdly, runoff rate which is defined rate of dam inflow to areal rainfall reached $57.3\% in case without the Yongdam dam. In case with the Yongdam dam, reservoir use rate reached $62.0\~68.4\% in case with downstream outflow of $5\;m^3/s$, and reached $64.1\~68.5\% in case with downstream outflow of $10\;m^3/s$. Fourth, in case with downstream outflow of $10\;m^3/s$ is from the Yongdam dam, appropriate water supply amounts to the Jeonju region were analyzed to only $0.50Mm^3/day$ from the daily simulation of water storages in the Yongdam dam. Comprehensively, water supply capacity of the Daecheong dam was analyzed to affect in small amounts in spite of the construction of the Yonsdam dam. It is effected to achieve the effective water management of the Yongdam dam and the Daecheong dam by using the developed cascaded model.

  • PDF

대청댐 저수지 퇴적물의 용출특성과 수질에 미치는 영향에 관한 연구 (A Study on Release Characteristics of Sediment and its Impacts on Water Quality in Daecheong Dam Reservoir)

  • 이요상;이경식
    • 환경영향평가
    • /
    • 제9권2호
    • /
    • pp.99-107
    • /
    • 2000
  • In order to solve water quality problem of domestic dam reservoir, many projects have been performed in a point of view to restoration of water quality. This study was carried out to evaluate the effect of release from sediment on water quality and release characteristics. Daecheong dam reservoir was investigated for two years, from 1998 to 1999. The nutrient release rates of Daecheong reservoir is less than foreign eutrophic reservoir at anoxic condition. For the evaluation of the effect of nutrient release on water quality, internal and external loading was calculated at Daecheong reservoir. As total phosphorus loading from sediment is calculated 9.3 ton/yr and inflow loading from Daecheong reservoir watershed 118 ton/yr, internal loading shows the portion of 7.88% to external loading. At this study, because sampling point was choosed at the point where much sediment is accumulated, experimental result is more than average release rates. Because Daecheong reservoir shows complete thermal stratification and anoxic condition below 30m from water surface in summer seasons, released phosphorus from sediment can not transfer to epilimnion and eventually resettles. Therefore sediment has insignificant impacts on water quality on Daecheong dam reservoir.

  • PDF

대청 ${\cdot}$ 충주댐 주변지역의 친환경농업 발전전략 (Developing Strategies of Environment-Friendly Agriculture Around the Daecheong and Chungju Dam)

  • 허승욱;우장명
    • 한국유기농업학회지
    • /
    • 제13권1호
    • /
    • pp.53-68
    • /
    • 2005
  • The objectives of this study are an establishment of developing strategies of environment-friendly agriculture(EFA) around the Daecheong and Chungju Dam. To establish strategic target, a series of farm household survey were conducted for farmers residing around the Dacchcong and Chungju Dam. The sample size of the survey is 233 respectively. As a result, the farmers rgcognized that EFA is fit for around Daecheong and Chungiu Dam as well as the prospects is very bright. In conclusion, the main streams to develop EFA are come up with vision and purpose around dam area, systematic connection of environment-friendly agricultural capability around dam area, construction of organic resource circulation system, and connecting propulsion with green tourism including quantitative and qualitative upgrade of environment-friendly agricultural products.

  • PDF

시계열 Landsat영상을 이용한 대청댐 유역의 수계변화 모니터링 (Hydrosphere Change Monitoring of the Daecheong-Dam Basin using Multi-temporal Landsat Images)

  • 엄대용;박준규;이진덕
    • 한국콘텐츠학회:학술대회논문집
    • /
    • 한국콘텐츠학회 2007년도 추계 종합학술대회 논문집
    • /
    • pp.932-936
    • /
    • 2007
  • 본 연구에서는 대청댐 유역의 수계 변화를 GIS 기반에서 정량적 정성적으로 해석하기 위해 다시기의 Landsat 위성영상을 이용하여 대청댐 건설이후부터 근래까지 유역의 수계 변화를 탐지하고자 하였다. 이를 위해 1981년, 1987년, 1993년, 2002년에 해당하는 각각의 Landsat 위성영상에 대하여 수계, 식생, 도로 및 인공지형물의 클래스를 지정하고 감독분류기법을 적용하여 유역에 대한 변화를 분석하였다. 감독분류의 결과로부터 4시기 위성영상 중 수계만을 추출하여 중첩분석을 수행하였으며, 이를 통해 대청댐 유역의 수계에 대한 시계열적 변화를 효율적으로 파악할 수 있었다.

  • PDF

대청호의 조류발생 분석 (Study on Algae Occurrence in Daecheong Reservoir)

  • 조완희;염경택;김진수;반양진;정세웅
    • 환경영향평가
    • /
    • 제21권3호
    • /
    • pp.367-380
    • /
    • 2012
  • There are many long and round shape shores due to terrain characteristics in Daecheong reservoir. Therefore it is indicated different spatial distribution of algae every year since the stream is being regulated by these terrain characteristics and reservoir operation about inflow and outflow discharge. Also oversupply of nutrient salt from tributaries of Daecheong reservoir where pollutants were concentrated generates massive growth of algae and depending on hydrological, reservoir operation condition, those proliferated algae at the stagnant tributaries moves to the mainstream of Daecheong reservoir which could create problems of water quality. In this study, it was analyzed the tendency of algae generation by examining algae occurring status for the last 4 years since 2008, and implemented hydraulic analysis at Daecheong reservoir through numerical tracer simulation by applying 3-dimensional hydrodynamic model, ELCOM. Also it was implemented a quantitative analysis of causal relationship based on the algae generation tendency and hydraulic behavior at Daecheong reservoir. Through numerical tracer simulation in this study, it could be noticed the degree of spread of inflow indicated similar trend to the algae occurring status at Daecheong reservoir and verified the different tendency of algae generation in 2011 unlike previous year caused by the rise of water temperature.

Longitudinal and Vertical Variations of Long-term Water Quality along with Annual Patterns in Daecheong Reservoir

  • Lee, Sang-Jae;Shin, Jae-Ki;An, Kwang-Guk
    • 생태와환경
    • /
    • 제43권2호
    • /
    • pp.199-211
    • /
    • 2010
  • The objectives for this study were to evaluate spatial and temporal characteristics of water quality, based on long-term water quality monitoring data during 1993~2008. We found that physico-chemical and ecological conditions in the Daecheong Reservoir (DR) were modified by the construction of upper dam (i.e., Yongdam Reservoir). total phosphorus (TP), Secchi depth (SD), and chlorophyll-a (CHL) in the DR showed significant longitudinal decreases along the headwater-to-the downlake, indicating a large spatial variation, and this gradient was more intensified during the high-flow season (monsoon). Nutrient-rich water containing high nitrogen and phosphorus in the monsoon season (July~August) passed through the reservoir as a density current in the metalimnetic depth, and also high suspended solids increased in the metalimnetic depth, especially during the monsoon. According to the deviation analysis of Trophic State Index (TSI), >50% of TSI (CHL)-TSI (SD) and TSI (CHL)-TSI (TP) values were negatives, so that inorganic suspended solids (non-votatile solids) influenced the underwater light regime against phytoplankton growth. Also, ratios of CHL:TP after the dam construction evidently increased, compared to the values before the upper dam constructions, indicating a greater yield of phytoplankton in the unit phosphorus. Overall data showed that ecological and functional changes in Daecheong Reservoir occurred after the construction of upper dam (Yongdam Reservoir).

우기 전후 댐 저수용량에 대한 이변량 빈도해석과 댐의 용수공급능력 평가 (Bivariate Frequency Analysis of Dam Storage Capacity before and after the Rainy Season and Evaluation on Water Supply Capacity)

  • 전창현;유철상;주국화;이광만
    • 한국수자원학회논문집
    • /
    • 제47권12호
    • /
    • pp.1199-1212
    • /
    • 2014
  • 본 연구에서는 댐 저수용량에 대한 이변량 빈도해석을 수행함으로써 재현기간 개념을 이용한 댐의 용수공급능력 평가방법을 제안하였다. 제안된 방법은 대청댐에 적용되어 검토되었다. 추가적으로 국내의 대표적인 가뭄사상에 대한 대청댐의 재현기간을 산정하고, 그결과를검토하였다. 그 결과를 정리하면 다음과 같다. 먼저, 본 연구에서는 이변량 빈도해석을 수행하기 위해 한국의 기후 특성을 반영한 댐의 용수공급능력 평가인자를 고려하였으며 5월 저류량 및 6~10월의 저류량 차이를 대상 변량으로 결정하였다. 둘째, 재현기간의 개념을 이용하여 대청댐의 용수공급능력을 평가한 결과, 대청댐은 재현기간 20년 미만에 대한 용수공급능력을 확보하는 것으로 나타났다. 마지막으로, 본 연구에서 제안된 방법은 한반도에 발생했던 대표적인 가뭄사상들을 분석하고, 해당 사상들에 대한 재현기간을 산정하는데 있어서도 유효함을 확인하였다.

Estimation of GHG emissions and footprint from Daecheong Reservoir using G-res Tool

  • Min, Kyeongseo;Kim, Dongmin;Chung, Sewoong
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2022년도 학술발표회
    • /
    • pp.209-209
    • /
    • 2022
  • Reservoirs play a key role in the carbon cycle between terrestrial and marine systems and are pathways that release greenhouse gases(GHGs), CO2, CH4, and N2O, into the atmosphere by decomposing organic matters. Developed countries have been actively conducting research on carbon emission assessment of dam reservoirs for over 10 years under the leadership of UNESCO/IHA, but associated research is very rare in Korea. In particular, the GHGs footprint evaluation, which calculates the change in net carbon emission considering the watershed environment between pre- and post- impoundment, is very important in evaluating the carbon emission of hydroelectric dams. The objective of this study was to estimate the GHG emissions and footprints in Daecheong Reservoir using the G-res Tool, an online platform developed by UNESCO/IHA. The G-res Tool estimates CO2 and CH4 emissions in consideration of diverse pathway fluxes of GHGs from the reservoir and characterizes changes in GHG fluxes over 100 years based on the expected lifetime of the dam. The input required to use the G-res Tool include data related to watersheds, reservoirs, and dams, and most were collected through the government's public portal. As a result of the study, the GHG footprint of Daecheong Reservoir was estimated to be 93 gCO2eq/m2/yr, which is similar to that of other reservoirs around the world in the same climate zone. After impoundment, the CH4 diffusion emission from the reservoir was 73 gCO2eq/m2/yr, also similar to those of the overseas reservoirs, but the CH4 bubbling emission, degassing emission, and CO2 diffusion emissions were 44, 34, 252 gCO2eq/m2/yr, respectively, showing a rather high tendency. Since the dam reservoir carbon footprint evaluation is essential for the Clean Development Mechanism evaluation of hydroelectric power generation, continuous research is needed in the future. In particular, experimental studies that can replace the emission factors obtained from the overseas dam reservoirs currently used in the G-res Tool should be promoted.

  • PDF