• Title/Summary/Keyword: DHP(Delphi Hierarchy Process) analysis method

Search Result 2, Processing Time 0.016 seconds

The Application of Fuzzy DHP in MIS Project Selection (퍼지 DHP를 이용한 정보시스템 프로젝트의 선정)

  • 정희진;이승인
    • Journal of the Korea Society of Computer and Information
    • /
    • v.3 no.2
    • /
    • pp.189-199
    • /
    • 1998
  • This study presents a FZOGP(fuzzified zero-one goal programming) model and a DHP (Delphic Hierarchy Process) that can be used to help information systems(IS) managers decides which IS projects should be selected. Delphic method is conducted prior to AHP so that not only can the objectives to be considered in analysis be determined, but the opinions of all decision makers can also be incorporated in problem formulation. While the DHP provides an ideal ranking process for the selection of IS Projects, it does not consider real constraints that exists in decision making process. Then this study intends to show how the DHP can be used to establish a priority structure for use within a FZOGP model. The advantages of FZOGP model are as follows: the imprecise aspiration level for each objective can be considered in FZOGP model. And, the common features between the new FZOGP and the GP models are that the objective functions in both models are minimized and the structure of their formulations are the same.

  • PDF

A Study on the Selection of Evaluation Factors on Forest Carbon Cycle Community(F.C.C.C) using DHP Analysis Method (DHP분석을 이용한 산림탄소순환마을 대상지 평가기준 선발에 관한 연구)

  • Seo, Jeong-Weon;Kwak, Kyung-Ho;Jeong, Se-Myong;Kang, Sung-Pyo;An, Ki-Wan
    • Journal of Korean Society of Forest Science
    • /
    • v.100 no.4
    • /
    • pp.672-680
    • /
    • 2011
  • The purpose of this study has been carried to develop a criterion for the selection of evaluation factors on Forest Carbon Cycle Community(F.C.C.C) based on the result of survey of 96 participants who were operation managers on mountain eco village(31), relevant experts(33), and officers of local government(32). For analysis of the results of survey, DHP(Delphi Hierarchy Process) method was used which is a combination of Delphi method and AHP(Analytic Hierarchy Process) method. The key factors on selection of a suitable area to launch F.C.C.C. project of Korea Forest Service was selected under three hierarchical classes. Class 1 comprises 3 indices(Physical resource index, Human resource index, Vision index), and Class 2 which contains 10 indices (Existing resource, Surroundings resource, Forest biomass resource, Humanities Social quality, Local resident participation, Leader's ability, External support, Planning of operation, Capability of operation, and Effect of operation). Class 3 is sub-level class of class which possess 38 indices. From the results of analysis, Consistency Index(C.I) of each index in the 3 classes was used as evaluation factor. In Class 1, index 'human resources' showed highest Consistency Index(0.454). In Class 2, index 'forest biomass resources' was the highest Consistency Index(0.376) in 'physical resources' of Class 1, index 'leader's ability' was the highest Consistency Index(0.326) in 'human resources' of Class 1, and index 'planning of operation' was the highest Consistency Index(0.346) in 'vision' of Class 1. In Class 3, relative importance of 38 index including 'Joint ownership land security(C.I.-0.266)' was evaluated. Based on the result of this study, a criterion for the selection of evaluation factors for F.C.C.C was developed and the evaluation criterion is expected to be use to select of a suitable area to launch F.C.C.C. project since 2011.