• Title/Summary/Keyword: DAM

Search Result 4,272, Processing Time 0.029 seconds

Runoff Estimation of Imjin River Basin through April 5th Dam and Hwanggang Dam Construction of North Korea (북한의 4월5일댐과 황강댐 건설에 따른 임진강 유역의 유출량 평가)

  • Kim, Dong-Phil;Kim, Kyoung-Ho;Kim, Joo-Hun
    • Journal of Environmental Science International
    • /
    • v.20 no.12
    • /
    • pp.1635-1646
    • /
    • 2011
  • This April 5th dam and Hwanggang dam, which are located in Imjin river, North Korea, become the main causes of water shortages and damages in Imjin river downstream. April 5th dam is assumed a small or medium-sized dam, its total storage volume reaches about 88 million $m^3$. And Hwanggang dam, multi-purposed dam of total storage volume approximately 0.3 billion $m^3$ to 0.4 billion $m^3$ is used as source of residental or industrial water in Gaeseong Industrial Complex. North Korea, which has April 5th dam and Hwanggang dam in Imjin river, manages water of approximately 0.39 billion $m^3$ to 0.49 billion $m^3$ directly. As water is storaged or discharged through dam, it causes a severe damage to areas in Yeoncheon-gun and Paju city, South Korea. Therefore, this study intends to analyze and estimate runoff through dam construction by using hydrological observation data and artificial data such as service water supply and agricultural water in Imjin river, water shortage and damage correctly.

Pseudo seismic and static stability analysis of the Torul Dam

  • Karabulut, Muhammet;Genis, Melih
    • Geomechanics and Engineering
    • /
    • v.17 no.2
    • /
    • pp.207-214
    • /
    • 2019
  • Dams have a great importance on energy and irrigation. Dams must be evaluated statically and dynamically even after construction. For this purpose, Torul dam built between years 2000 and 2007 Harsit River in Gümüşhane province, Turkey, is selected as an application. The Torul dam has 137 m height and 322 GWh annual energy production capacity. Torul dam is a kind of concrete face rock fill dam (CFRD). In this study, static and pseudo seismic stability of Torul dam was investigated using finite element method. Torul dam model is constituted by numerical stress analysis named Phase2 which is based on finite element method. The dam was examined under 11 different water filling levels. Thirteenth stage of the numerical model is corresponding full reservoir condition which water filled up under crest line. Besides, pseudo static coefficients for dynamic condition applied to the dam in fourteenth stage of the model. Stability assessment of the Torul dam has been discussed according to the displacement throughout the dam body. For static and pseudo seismic cases, the displacements in the dam body have been compared. The total displacements of the dam according to its the empty state increase dramatically at the height of the water level of about 70 m and above. Compared to the pseudo-seismic analysis, the displacement of dam at the full reservoir condition is approximately two times as high as static analysis.

The Bibliographic Study of Dam su ( 痰嗽 ) (담수(痰嗽)에 대(對)한 문헌적(文獻的) 고찰(考察))

  • Choi, Sun-Yup;Han, Sang-Whan
    • The Journal of Internal Korean Medicine
    • /
    • v.12 no.2
    • /
    • pp.68-73
    • /
    • 1991
  • This study has been carried out to investigate Dam Su ( 痰嗽 ) by referring to 22 documents. The results were as follow ; 1. Dam Su ( 痰嗽 ) is caused by Dam ( 痰 ) made of irregular meals, Bi Hu ( 脾虛 ). Bi Seop ( 脾濕 ), Sik Juk ( 食積 ). 2. The symptom of Dam Su ( 痰嗽 ) is as follows ; Dam Chul Hae Ji ( 痰出咳止 ) Hung Kyuk Da Man ( 胸膈多滿 ) Da dam ( 多痰 ) Dam sung ( 痰聲 ) 3. The treatment of Dam Su ( 痰嗽 ) is as follows ; Chi Dam (治痰) Gun Bi Jo Seup ( 建脾燥濕 ) Chung Pae Wha Dam ( 淸肺化痰) Sun Gi ( 順氣 )

  • PDF

Risk factor analysis for failure characteristics of fill dam (필댐 파괴 특성에 따른 위험 요소 분석)

  • Lim, Jeong-Yeul;Oh, Seok-Hoon;Jang, Bong-Seok;Kim, Bum-Joo;Lim, Eun-Sang
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.794-799
    • /
    • 2006
  • For various historical reasons and some technical reasons, the safety of dams has been controlled by an engineering standards-based approach, which has developed over many years, initially for the design of new dams, but increasingly applied over the past few decades to assess the safety of existing dams. And some countries were asked for risk assessment on existing dam, which included structural, hydraulic safety of dam and social risk. So, Many countries were developed and could be adapted as an additional tool to assist in decision-making for dam safety management.

  • PDF

Influence of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam (화천댐의 홍수량 및 수위에 미치는 평화댐의 영향 분석)

  • 전병호;신현석;이재철;윤용남
    • Water for future
    • /
    • v.26 no.1
    • /
    • pp.93-101
    • /
    • 1993
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in this country. The other is the DWOPER (Dynamic Wave Operational Model) package developed by the U.S. NWS for the hydraulic routing. Flood routing simulations have been performed on four different scenarios:1) Before the construction of the Keumkangsan-Dam and the peace-Dam, 2) The exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam), 3) The exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam), 4) The exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the hwachun-Dam need to be modified.

  • PDF

Environmentally Sound and Sustainable Dam Construction in Asia (Hantan River Dam in Korea)

  • Baek, Unil;Kim, Myunsun;Park, Younghwan;Noh, Seungkyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.134-147
    • /
    • 2004
  • Theses days, there are 3 prerequisites for dam building in Korea: First one is how to build the dam safe and stable from the technical points of view. Second one is how to design and construct the dam environmentally sound with the minimum change of the surrounding area of the dam site. Third one is how to activate the local economy of the surrounding area of the dam site in order to make the dam construction sustainable from the social and economical points of view. As far as technical aspects far dam building, there are hardly any problems in dam design and construction in our country. However, there are a little difficulty according to the location of the dam site. In order to fulfill the second option it is believed that a lot of effort should be made to accomplish the second task not only because that fairly large area shall be inundated with water after impounding but also because that ecological environments shall be changed due to change of water environment. Therefore, thoughtful investigation and assessment of the environmental features of the local regions have to be preceded before starting of the dam building. In order to overcome these difficulties Hantan river dam has been declared as an Eco-dam with 3 strategies and 9 activities plan at the design stage after sufficient consideration of the local identities of these region and coupled national plans for surrounding areas. Finally, Eco-tourism with the several coupled network-wise touristic courses, namely PERTH model, has been proposed after thorough analysis of the local identities by the Jahari window to make local economy being activated. Detailed descriptions for 3 strategies and 9 activities plan for declaration of Eco-dam and proposal of Eco-tourism with the network-wise touristic courses will be mentioned in the main content.

  • PDF

Development of Dam Earthquake Monioring System and Application of Earthquake Records for Dam Safety Management against Earthquake (지진대비 댐안전관리를 위한 지진감시시스템 구축 및 계측기록 활용)

  • Ha, Ik-Soo;Lee, Jong-Wook;Cho, Sung-Eun;Oh, Byung-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1389-1396
    • /
    • 2008
  • The recent Sichuan earthquake(2008) in China and Iwate-Miyazaki earthquake(2008) in Japan give Korea peninsula warning that it is no more safety zone against damage by earthquake events. So, rapid and appropriate countermeasures for dam operation and management against earthquake are needed. In Korea earthquake design standard(MOCT, 1997) has been revised after Kobe earthquake. Installation of seismometer and monitoring of earthquake for special class dams is requlated in dam aseismic design standard(MOCT, 2001). Accelerometer installation project for existing dams has been carrying out by K-water to establish an earthquake network for dam safety. Real-time dam earthquake monitoring network has also been developed to detect an earthquake efficiently and to warn to dam administrators as soon as possible. In this study, dam real-time earthquake monitoring system developed by K-water was introduced and applicability of real earthquake record measured by this system to dam safety management was illustrated.

  • PDF

A Study on Daily Water Storage Simulation of the Daecheong Dam by Operation Scenario of the Yongdam Dam (용담댐 운영 시나리오에 따른 대청댐 저수량 변화에 관한 연구)

  • Noh Jaekyoung;Kim Hyun-hoo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1403-1407
    • /
    • 2005
  • In order to analyze the water storage of the Daecheong dam after constructing the Yongdam dam situated in upstream, a daily cascaded simulation model for analyzing water storages in the Yongdam-Daecheong dams was developed. Operation scenarios of the Yongdam dam were selected to 8 cases with the combinations of downstream outflows and water supplies to the Jeonju region. Daily water storages in the Daecheong dam was analyzed daily by simulating from 1983 to 2004. The results are summarized as follows. Firstly, water supplies from the Daecheong dam were analyzed to amount $1,964.2Mm^3$ on a yearly average in case without the Yongdam dam. In case with the Yongdam dam, water supplies from the Daecheong dam were analyzed to amount $1,858.7\~1,927.3Mm^3$ in case with downstream outflow of $5\;m^3$ is, and were analyzed to amount $1,994.9\~2,017.8Mm^3$ in case with downstream outflow of $10\;m^3/s $. These values are compared to $1,649Mm^3$ applied in design. Secondly, reservoir use rate which was defined rate of water supply to effective water storage reached $241.3\% in case without the Yongdam dam. In case with the Yongdam dam, reservoir use rate reached $228.3\~236.8\% In case with downstream outflow of $5\;m^3/s$, and reached $245.1\~247.9\% in case with downstream outflow of $10\;m^3/s$. Thirdly, runoff rate which is defined rate of dam inflow to areal rainfall reached $57.3\% in case without the Yongdam dam. In case with the Yongdam dam, reservoir use rate reached $62.0\~68.4\% in case with downstream outflow of $5\;m^3/s$, and reached $64.1\~68.5\% in case with downstream outflow of $10\;m^3/s$. Fourth, in case with downstream outflow of $10\;m^3/s$ is from the Yongdam dam, appropriate water supply amounts to the Jeonju region were analyzed to only $0.50Mm^3/day$ from the daily simulation of water storages in the Yongdam dam. Comprehensively, water supply capacity of the Daecheong dam was analyzed to affect in small amounts in spite of the construction of the Yonsdam dam. It is effected to achieve the effective water management of the Yongdam dam and the Daecheong dam by using the developed cascaded model.

  • PDF

THE OPTIMAL CAPACITY OF THE FINITE DAM WITH COMPOUND POISSON INPUTS

  • Bae, Jong-Ho
    • Journal of the Korean Statistical Society
    • /
    • v.32 no.1
    • /
    • pp.65-71
    • /
    • 2003
  • We consider the finite dam with compound Poisson inputs which is called M/G/1 finite dam. We assign some costs related to operating the dam and calculate the long-run average cost per unit time. Then, we find the optimal dam capacity under which the average costs is minimized.

Underwater explosion and its effects on nonlinear behavior of an arch dam

  • Moradi, Melika;Aghajanzadeh, Seyyed Meisam;Mirzabozorg, Hasan;Alimohammadi, Mahsa
    • Coupled systems mechanics
    • /
    • v.7 no.3
    • /
    • pp.333-351
    • /
    • 2018
  • In the present paper, the behavior of the Karaj double curvature arch dam is studied focusing on the effects of structural nonlinearity on the responses of the dam body when an underwater explosion occurred in the reservoir medium. The explosive sources are located at different distances from the dam and the effects of the cavitation and the initial shock wave of the explosion are considered. Different amount of TNT are considered. Two different linear and nonlinear behavior are assumed in the analysis and the dam body is assumed with and without contraction joints. Radial, tangential and vertical displacements of the dam crest are obtained. Moreover, maximum and minimum principal stress distributions are plotted. Based on the results, the dam body responses are sensitive to the insertion of joints and constitutive model considered for the dam body.