This study investigates the reinforcing effects of the Multi-bar Spring nails with respect to the conventional Soil-nails in artificial slopes. Based on wide experience related to design and construction, soil nails have been widely applied to reinforce slope in the world. Multi-bar spring nails are one of the improved soil nailing methods. These method maximizes bending, shearing, pull-out resistance for those multi-nails, not unit nail, that are inserted in the borehole using special spacer at regular intervals. In addition, because cutting plane is confined effect resulting from a pressured plate at the end of the nails with compression spring equipment, slope stability is secured using MS-nailing method. Analyzing bending, pull-out, shearing condition of MS-nail, it was examined throughly elastic region, load transfer capacity, reinforcing effect on cutting plate of MS-nails. In addition, Pilot and laboratory tests, numerical analysis were carried out to verify the superiority of MS-nailing method. In case, MS nailing method is applied to reinforce artificial slope, it was analyzed that bending, pull-out, shearing resistance was increased more than existing nailing method was applied. In this study, it was shown that surface failure was more or less prevented using MS-nailing method, confining effect on cutting plane using spring stuck to flexible equipment.
Proceedings of the Korean Society of Precision Engineering Conference
/
2002.10a
/
pp.599-602
/
2002
A novel rapid prototyping (RP) process, an automated transfer type variable lamination manufacturing process (Automated VLM-ST) has been developed. In Automated VLM-ST, a vacuum chuck and linear moving system transfer the plate type material with two pilot holes to the rotation stage. A four-axis synchronized hotwire cutter cuts the material twice to generate Automated Unit Shape Layer (AUSL) with the desired width, side slopes, length, and two reference shapes in accordance with CAD data. Each AUSL is stacked on the stacking plate with two pilot pins using the pilot holes in AUSL and the pilot pins. Subsequently, adhesive is supplied to the top surface of the stacked AUSL by a bonding roller and pressure is simultaneously applied to the bottom surface of the stacked AUSL. Finally, three-dimensional shapes are rapidly fabricated. This paper describes the procedure for generating the cutting path data (AUSL data) f3r automated VLM-ST. The method for the generation of the Automated Unit Shape Layer (AUSL) in Automated VLM-ST was practically applied and fabricated for a various shapes.
There are substantial difficulties in assessing the volume of soill/rock to be excavated and the cost thereof, which is attributable to the subjective and qualitative methods of rock mass classification prevailing at the moment. This paper intends to introduce more objective and quantitative rock mass classification method easily applicable to the excavation of granites in Muakjae, Seoul. As a result of such study it is proven that Schmidt hammer and point load strength tests are fairly reliable and easily applicable to estimate and quantify uniaxial compressive strength of granitic material in Seoul. In an efforts to confirm the granitic rock mass conditions in 12 meters underground, seismic refraction surveys were made on the top of vertical exposures from where underlying rock mass conditions could be directly inspected. Rock mass boundaries determined by seismic refraction methods were found to agree within a 1m variance with visible differences in rock mass conditions in the vertical exposure beneath the test site. Thus it can be concluded that detailed geotechnical mapping on cutting slopes is a most efficient, dependable and cost-effective technique in assessing likely excavation conditions of shallow granitic mass in Seoul.
Transactions of the Korean Society of Mechanical Engineers A
/
v.41
no.5
/
pp.391-399
/
2017
This paper presents the effects of the cutting speed and feed rate on the axial shape of flat end-milled down cut side walls. Experiments were performed using the cutting speed, tool diameter, and feed per tooth as variables, and the thrust force and axial shape were measured as the experimental results. The results of this study confirmed that a smaller feed per tooth, which is proportional to the value obtained by dividing the feed rate by the cutting speed, results in a higher axial shape accuracy. In addition, the axial shape can be simplified to a form in which two straight lines having different slopes meet at a singular point. Therefore, it was concluded that the shape accuracy could easily be estimated during the operation and improved by adjusting the feed per tooth.
In South Korea, about 74% of total area is mountainous terrain It is therefore inevitable to make tunnel or cutting slope for road construction. According to a related survey, approximately 2,400 sites of cutting slopes were found from 24 different routes of roadway which is overall 900 km long, implying 2.7 slopes per 1km of roadway on average. Even though safety matter such as the slope failure prevention would be the most important consideration for the construction of cutting slopeslandscape of sloped face is nowadays becoming another important factor due to the growing demand for the driver-friendly road environment Various construction methods which attain this goal should therefore be considered in the design stage of the roadway. The objective of this study is to identify important factors in landscape of sloped-cut roadway using factor analysis. For this, 10 main treatment methods of sloped-cut fact were analyzed. This study employed the LISREL(structural analysis of common variance) model in order to capture the qualitative characteristics of the slope-cut road and examine the relationship between the suey error and the variable(s). As a result, more reasonable landscape evaluation model for the road design and construction was proposed.
Kim, Mi-Ri;Kim, Su-Ryeon;Shin, Ji-Hoon;Sung, Hyun-Chan
Journal of the Korean Institute of Landscape Architecture
/
v.42
no.1
/
pp.115-122
/
2014
The purpose of this study is to analyze the relationship between height of cutting and filling as well as the height of slope of roadsides. It also suggests the rational height of slope to minimize topographical damage in road construction. Hence, in this study, 44 cases of expert's opinions related to height of slope in Environmental Impact Assessment(EIA) for road construction projects are reviewed, and 23 cases of data related to height of cutting and filling in EIA for road construction projects are used for analyzing relationship between height of slopes and height of cutting or filling of roadside. The results are as follows; Most of heights of cutting, filling and slope in EIA for road construction are over the required standards 20 or 30m(in case of cutting) and 10 or 15m(in case of filling). It also shows that there is high-level correlation between height of cutting and filling and height of slope of roadside. According to regression analysis, it is suggested that the general standard of each heights of cutting and filling are 25.33~33.23m(in case of cutting) and 14.56~18.08m(in case of filling), but it should be considered in EIA review for road construction projects that these heights suggested in this study are over the required standards.
Journal of the Korean Society of Environmental Restoration Technology
/
v.2
no.1
/
pp.88-93
/
1999
In modern period, the history of highway landscaping can be divided into three stages. The first stage from the late 1960s to the early 1970s : during this period revegetation operation started and landscape architecture was introduced. The second stage from the late 1970s to the early 1980s : during this period the definition of functional planting which had played the most important role in highway landscaping was established. Also, highway landscaping was influenced by Japan, and the revegetation of highway slopes were applied with Seedspray, Block-sodding methods, and so on. The third stage from late 1980s to the present : during this period eco-landscaping was introduced and began to mix with ecosystem techniques. The revegetation works of cutting-rock slopes have widely been developed. Many people think that landscaping is necessary for us, and that revegetation method is effective to conserve slope environment. Based on accumulated data we have to improve the function of landscaping and revegetation method, and also have to establish the method of landscaping harmonized with our own landscape.
Proceedings of the Korean Geotechical Society Conference
/
2005.03a
/
pp.113-120
/
2005
Soil nailing system can be mentioned to a method of supporting as the shear strength of in-situ soils is increased by passive inclusions. In the general soil nailing system, facing walls are used in two kind of a lattice concrete block or a cast in placed concrete wall. A case of lattice concrete blocks is used in slow slopes greater than 1:0.7. Also, a case of a cast in placed concrete wall is used in steep slopes less than 1:0.5. The cast in placed concrete walls are constructed to 30cm thick together with a shotcrete facing. In this study, the assembling soil nailing method as a new soil nailing system is proposed. This method is constructed assembly using precast concrete panels. Therefore ability of the construction and quality of the facings can be modified than a usual soil nailing system. Also, this method can be obtained the effects that a global slope stability increase, as precast concrete panels is put on cutting face after excavating a slope.
Hydroseeding technique is a very popular method of revegetating slope areas through the control of soil erosion and stability by seeding grasses. This study was conducted to select turfgrass species and cultivars for hydroseeding. Experiment plots were established on various soil types and environmental conditions at Singar-Ansan high-way construction site. The investigation was designed in three cutting, one back-filling and other three spare sites with various seed mixtures. Results indicated that combinations of seed mixtures influenced seed germination and rates of surface cover. In a view of long term, vegetation shifts should be influenced by characters of slopes and micro-climate conditions. Hydroseeding did not show good results on rocky slope areas. Revegetation was only going on where there had soil. The combination of seed mixture with a higher rate of perennial ryegrass had relatively good revegetation with faster germination and seedling growth. Improved turf-type tall fescue Arid ⓡ and Falcon ⓡ seemed to have good environ-mental adaptation and drought tolerance. Wild or old type cultivars showed relatively slow green-up in spring and growth rates at the next year of seeding. For the harmonious landscaping with surrounding area, the combination of native grass mixture with cool-season grasses had good results. Slow and low revegetation rate at hack-filling site seemed to be caused by the poor development of capillary tubes in sub-soil. It was shown that a high correlation between seed germination and revegetation rate, and between three-month later coverage rate and final rate. The evaluation of coverage rate after three month seems to he acceptable to decide the accomplishment of hydroseeding results on rode side slopes.
HoYun Kang;InJoon Kang;Won-Suk Jang;YongGu Jang;GiBong Han
International conference on construction engineering and project management
/
2009.05a
/
pp.1260-1265
/
2009
Topographical features in South Korea is characterized that 70% of territory is composed of the mountains that can experience intense rainfall during storms in the summer and autumn. Efficient planning and management of landscape becomes utmost important since the cutting slopes in the mountain areas have been increased due to the limited construction areas for the roadway and residential development. This paper proposed an efficient way of slope management for the landslide risk by developing Web-GIS landslide risk management system. By deploying the Logistic Regression Analysis, the system could increase the prediction accuracy that the landslide disaster might be occurred. High resolution survey technology using GPS and Total-Station could extract the exact position and visual shape of the slopes that accurately describe the slope information. Through the proposed system, the prediction of damage areas from the landslide could also make it easy to efficiently identify the level of landslide risks via web-based user interface. It is expected that the proposed landslide risk management system can support the decision making framework during the identification, prediction, and management of the landslide risks.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.