The Transactions of the Korean Institute of Electrical Engineers P
/
v.54
no.1
/
pp.41-46
/
2005
Most of LV customer have applied the 3-phase four wire system distribution system because it has advantage of supplying both of 1-phase & 3-phase loads simultaneously. Due to its structural simplicity, it is more convenient for use rather than the conventional separated scheme. But voltage unbalance more commonly emerges in individual customer loads due to phase load unbalance, especially where, single-phase power loads are used. Voltage unbalance factor(VUF) represents the loss of symmetry in the supply(magnitude and angle). It leads some problems such as de-rating or power losses. In this paper, voltage and current waveform in the actual fields have been measured and analyzed in relation with internationally allowable voltage unbalance limits.
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.33
no.1
/
pp.65-69
/
2020
The aim of this study is to improve the fault decision ability of FRTU (Feeder remote terminal unit) in DAS (Distribution automation system). FRTU uses the FI (Fault indicator) algorithm based on fault current pickup and operation of the protection device. Even if the inrush current flows or the protection device is sensitive to the transient current, FRTU may indicate incorrect fault information. To address these problems, we propose an improved fault recognition algorithm that can be applied to FRTU. We will detect a specific wave that is indicative of a fault, and use this information to identify a fault wave. The specific wave-detection algorithm is based on the duration and periodicity of the voltage, current, and harmonic variations. In addition, we propose fault recognition algorithms using voltage factor variation analysis and DWT (Discrete wavelet transform). All the wave data used in this study were actual data stored in FRTU.
When induction motor moves, power quality decline of line is risen seriously because provoking voltage drop the moment to system power supply by excessive moving current as well as power-factor drop in case drive by light-load because current reaches in 6 times $\sim$ 8 times of rated current. In this paper, a modeling did an distribution system 13 bus type model and induction machine load presents in IEEE using a PSCAD/EMTDE package, and it displayed an accident conspiracy and a compensating factor of DSTATCOM through simulation show.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.24
no.6
/
pp.147-153
/
2010
When small scale wind and solar power generation systems are connected to conventional power distribution system. It is worried that it can affect the quality of electricity such as voltage variation, power factor, frequency, harmonics and flicker. Therefore, in this research, in order to investigate the effects of wind power generation equipments(AC link method) on electrical power quality, when they are connected to distribution system. Power quality analyzer was installed respectively at the front side of power conversion system of conventional wind generation system and secondary side of consumer's power supply at distribution line. Measurements on power quality were performed and the effects of the wind generation system on distribution system were analyzed when it was and was not operated. The results show that 0.34[%] increase on voltage variation, 0.145 increase on current crest factor and 0.6[$^{\circ}$] deviation on phase difference when the power generation system was operated.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.1
/
pp.227-231
/
2016
Electrical disasters have not been greatly reduced despite continuous prevention efforts until now. However, the smart distribution board which can be measured information about general electrical condition such as current, voltage, power, power factor etc. and electrical safety condition such as over-current, leakage current, arc etc. and communicated analysis information about electrical condition with server will be helpful for the prevention of electrical disasters through real-time surveillance and data analysis under smart grids based on the two-way communication. In this paper, the proposal standard of smart distribution board for electrical safety is suggested about the structure, functional requirements of compositions, communication, security and so on.
Journal of the Institute of Electronics and Information Engineers
/
v.53
no.7
/
pp.121-127
/
2016
We propose a algorithm to calculate power factor of fundamental waveform in an environment where the voltage and current have been distorted by harmonics. In the proposed power factor computation algorithm, voltage and current are converted to rotating DQ reference frame, and power factor is calculated from active power and reactive power. We compare the proposed method with the conventional power factor measurement method as mathematically. In a condition that voltage and current are distorted by harmonics, the proposed method accurately measure the power factor of fundamental wave, and it is confirmed by simulation using MATLAB. If the proposed power factor measurement method is applied to an automatic power factor control system, a power factor compensation performance can be maximized in harmonic distortion environment. As a result, it is possible to reduce electricity prices, reduce line loss, increase load capacity, ensure the transmission margin capacity, and reduce the amount of power generation.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.56
no.3
/
pp.123-128
/
2007
Hydro power supplies no pollution energy, mainly induction generator has been applied at the small capacity power station. The generating power of small hydro-electric power station connects on the 22.9kV distribution system or low voltage system in the case of three-phase four-wire supply system. There are side effects of various kinds in the 3-three phase 4-wire distribution system mixing 1-phase load and 3-phase load. This system generates the voltage unbalance by unbalanced load operating condition. They have various serious effects on generator and connection system. In this paper, we analyzed what kind of operation characteristic are happened in the induction generator by customer load variation at the 3-three phase 4-wire distribution system.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.62
no.2
/
pp.72-78
/
2013
In this study, samples from the site where there occurred unbalanced current when cable routing were analyzed, and the simulation program for electric power system analysis, PSCAD/EMTDC, was used to calculate the current unbalance on cable routing. Based on electromagnetic finite element analysis(FEA), electromagnetic parameters enabled the interlocking with COMSOL for the calculation of allowable current ampacity and magnetic filed distribution. This then led to modeling unbalanced current between common modes using the unbalanced current analysis program, thereby comparing and discussing the results from both. The analyzed model is a common mode 2 parallel circuit, which is a basic model for cable routing, and by arranging cables in various ways, the arrangement with the least current unbalance was suggested, which would, in the future, prevent earth faults and extend life for the whole cable.
Izadi, Mahdi;Ab Kadir, Mohd Zainal Abidin;Hajikhani, Maryam
Journal of Electrical Engineering and Technology
/
v.9
no.5
/
pp.1694-1703
/
2014
Lightning induced voltage is a major factor that causes interruptions on distribution lines. In this paper, analytical expressions are proposed to evaluate a lightning induced voltage on power lines directly in the time domain without the need to apply any extra conversions. The proposed expressions can consider the widely used current functions and models in contrast to the earlier analytical expressions which had a number of limitations related to the simplification of the channel base current and the current along the lightning channel. The results show that the simulated values based on the proposed method are in good agreement with the previous studies and the proposed expressions can be used for optimizing the insulation and protection level of existing and new lines being designed.
The purpose of this study was; 1) to describe consumer preferences for wood~framed housing; 2) to determine factors which affect the preferences for housing environments in wood-framed housing by demographic, current housing, and wood-framed housing-related characteristics; and 3) to identify differences in preferred wood-framed housing related characteristics by demographic and current housing characteristics. From the visitors to a model wood-framed house in Seoul, Korea, 296 persons willing to live in a wood-framed house were selected as the sample for the study. Data were collected using a self-administered survey and analyzed by frequency distribution, factor analysis, chi-square test, t-test, and one-way analysis of variance procedures. The results of the study Indicated that among seven factors based on 32 housing characteristics, Factor 2 - "floor plan and Interior environment" was the major variable which showed significant difference by selected demographic characteristics. Regarding the differences in wood-framed housing related characteristics by demographic characteristics, age, gender, education, and family life cycle showed group differences. Also, housing type was the major current housing characteristic to provide significant group difference in preferred wood-framed housing characteristics.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.