Estimation of RPS Method Using 3-Dimensional Numerical Analysis (3차원 수치해석을 이용한 RPS 공법의 적용성 평가)

  • Roh, Jeong-Min;Shin, Eun-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.174-179
    • /
    • 2006
  • Recently, the crossing tunnel has been constructed frequently to connect the separated area by highway and railroad. The construction of crossing tunnel must be progressed while maintaining the existing traffic of the highway as well as railroad. There are many cross funnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(Roof Panel Shield) method in crossing tunnel construction with comparing other existing cross funnelling methods are needed a little volume of concrete and easy to change the direction of cutting shoe during the construction of pipe roof, The 3-dimensional numerical analysis of RPS to consider the arching effect was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

Numerical Analysis of Crossing Tunnel Under Railroad using Roof Panel Shield Method (Roof Panel Shield 공법을 이용한 철도지하횡단터널 굴착의 수치해석 연구)

  • Shin Eun-Chul;Kim Jung-Hyi;Jung Byung-Chul;Roh Jeong-Min
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.655-660
    • /
    • 2005
  • Recently, the crossing tunnel has been constructed to maintain the operation highway as well as railroad. The advantages of adopting RPS method in crossing tunnel construction are needed a little space and easy to change the direction of cutting shoe during the construction of pipe roof. The numerical analysis of RPS was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing tunnel construction.

  • PDF

The Analysis of Ground Behavior on the Crossing Construction Under Railroad Using Field Measurement (철도지하횡단공사시 현장계측을 통한 지반거동 분석)

  • 엄기영;신민호;김지훈
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.546-551
    • /
    • 2001
  • We analysed the affection to subgrade that railway underground crossing construction make with studying displacement of subgrade of each construction methods and processing of Front jacking method and Pipe roof method with already-measured data(during the construction) and additionally-measured field test data in railway underground crossing construction. We measured vertical and horizontal displacement at two construction places of front jacking method and pipe roof method each, and we analysed the results of the measurement at each stage of construction to applied to the excution of construction.

  • PDF

3-Dimensional Numerical Analysis of Crossing Tunnel under Railroad using RPS Method (RPS공법을 이용한 철도횡단터널의 3차원 수치해석)

  • Shin Eun-Chul;Kim Jung-Hyi;Lee Eun-Soo;Roh Jeong-Min
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.454-461
    • /
    • 2005
  • There are many cross tunnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(Roof Panel Shield) method in crossing tunnel construction with comparing other existing cross tunnelling method are needed a little space and easy to change the direction of cutting shoe during the construction of pipe roof. The 3-dimensional numerical analysis of RPS was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

  • PDF

Joint Element Structure Method on the Subway Box Structure unere Railroad (철도하부 가도교 설치에 대한 JES공법)

  • Pi, Tae-Hee;Cho, Kook-Hwan;SaGong, Myung
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.973-981
    • /
    • 2008
  • This document presents the JES(Joint Element Structure) method that has been adopted for the firs time in our country for the construction of the structure crossing under the railroad without open excavation. Front Jacking Method, Tubular Roof Construction Method, New Tubular Roof Method and Joint Element Structure Method are commonly used for the construction of structures crossing under the railroad. JES Method, frequently used in Japan recently, is a new method to construct the structures crossing under the railroad in a safe manner and in a relatively short period of time by utilizing the steel elements with the joints through which the load in the vertical angle to the axial direction is transferred to the next element. The elements are tied to each other through the joints to form the permanent walls of a Rahmen structure under the road without open excavation and without limitation to the length in a convenient way. Through the case study in the project of a Subway Box Culvert Improvement for the Gyeonguiseon Railroad in front of Yonsei University using the JES Method, the cost and period of construction in various types of soil is investigated compared to the Front Jacking Method. Furthermore, by analyzing the results of instrumentation measurements carried out throughout the construction, comparison between the actual displacement in the ground and the predicted displacement in the design is made to provide the considerations to be counted for the design. In conclusion, comparison in the field of economic feasibility, constructability and safety between the JES Method and Front Jacking Method, which is most frequently adopted in our country at present, is made to present the JES Method as a new alternative for the non-open excavation construction method for the structures crossing under the railway.

  • PDF

2-Dimensional Numerical Analysis of Crossing Tunnel under Railroad using Roof Panel Shield Method (RPS공법을 이용한 철도횡단터널의 2차원수치해석)

  • Shin, Eun-Chul;Roh, Jeong-Min;Lee, Eun-Soo;Kim, Kyeong-Mo;Kim, Jung-Hyi;Jung, Byung-Chul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.591-600
    • /
    • 2005
  • There are many cross tunnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(roof panel shield) method in crossing tunnel construction with comparing other existing cross tunnelling method are needed a little space and easy to change the direction of cutting shoe during the construction of pipe roof. The numerical analysis of RPS was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

  • PDF

A study on the train passage control at railroad bridge under heavy rainfall (철도교량 홍수시 열차운전규제기준에 대한 연구)

  • Park, Young-Kon;Lee, Jin-Wook;Yoon, Hee-Taek;Mok, Jai-Kyun;Kim, Seon-Jong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1001-1006
    • /
    • 2004
  • Railroad disasters are frequently occurred by man-made causes or natural causes. In general, man-made causes are illegal construction practices, deterioration with the lapse of time and railroad crossing accidents, and natural causes are rainfall. snow, wind, earthquake, etc. Of cause, railroad disasters by man-made causes are prevented from keeping the safety principle, constructing multi-level crossing, securing enough men of ability and financial resources and making a thorough check using equipments with high capacity. And railroad disasters by natural causes are also minimized by construction of disaster prevention facilities, introduction and operation of general disaster prevention system and reasonable train passage control. Therefore, to setup the criterion of train passage control for train safety at railroad bridge under heavy rainfall, risky factors, national and oversea criteria under such circumstances are reviewed and a scheme to setup the criterion is suggested.

  • PDF

A Study on Behavioral Characteristics of Track Roadbed according to Steel Pipe Press-in Excavation during Construction of Underground Railway Crossing

  • Kim, Young-Ha;Eum, Ki-Young;Kim, Jae-Wang
    • International Journal of Railway
    • /
    • v.6 no.2
    • /
    • pp.69-77
    • /
    • 2013
  • In this study, numerical analysis and model experiments were conducted to analyze behavioral characteristics acting on the track roadbed with excavation through steel pipe injection, a non-exclusive method of crossing construction under railroad as primary target. In model experiments that simulate injection excavation behaviors with an increase in the depth of soil cover, the upper displacement was measured by construction of the first and the second pipes in order to predict actual behaviors, and the behavior characteristics were verified through numerical analysis. The investigation results showed that surface displacement was smaller under the condition of higher soil cover. In the case of injecting two pipes, when the first pipe was injected, deformation of the surface increased linearly in both settlement and uplift experiments. However, when the second pipe was injected, the amount of change was found to be very small due to the relaxation and plastic zones around the first pipe. In addition, the results of numerical analysis on the same cross section with the model experiment found that the results of investigation into settlement ratio and volume loss were in very good agreement with those obtained by the model experiment.

Research on Efficient Applicability Through Review on Standard for Selection of Construction Method for Railway Underground Crossing Transit (철도지하횡단 통과 공법 선정기준에 관한 검토를 통해 효율적인 적용성에 대한 연구)

  • Hwang, Young-Ho;Shon, Jung-Chul;Baek, Jong-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.595-600
    • /
    • 2007
  • Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.

  • PDF

The Analysis of Ground Behavior on the Crossing Construction Under Railroad Using In-door Model Experiment (실내모형실험을 이용한 철도지하횡단공사에서의 지반 거동 분석)

  • 엄기영;정흥채;김지훈
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.540-545
    • /
    • 2001
  • When a testing body is being inserted to the ground by Front Jacking Method, the influence of friction forces around the body plays important role in the characteristics of whole ground behavior. In the study, the Front Jacking Method that most frequently used in Korea who applied with experimental way. And the characteristics of ground behavior that caused by the friction that acts to the upper slab was analysed for the basic data that can be utilized for real scale experiment.