• Title/Summary/Keyword: Cross-Bond Grounding

Search Result 2, Processing Time 0.014 seconds

Analysis of Sheath Induced Voltage in Transmission Power Cable Connected with CCPU (방식층 보호장치의 설치에 따른 지중송전케이블 시스 유기전압 해석)

  • Lee, Jun-Sung;Lee, Jong-Beom;Kim ,Young
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.1
    • /
    • pp.19-25
    • /
    • 2000
  • This paper describes the sheath induced voltage in underground transmission cable system which will be operated with cable cover protection unit(CCPU). Simulation was carried out to analyze the sheath induced voltage in the real cable system which was installed by 154㎸ CV cable in the case with and without CCPU. The sheath induced voltage will be also analyzed according to the change of grounding method, fault resistance and fault angle. Simulation was performed using EMTP and ATP Draw, the simulation results show whether the CCPU in necessary or not in underground transmission power cable system.

  • PDF

Effectiveness Evaluation According to Change of IJ Joint Box Location and Grounding System in Underground Transmission System (지중송전계통에서 절연접속함 위치 및 접지방식 변경의 효용성 평가)

  • Ko, Kwang-Man;Lee, Jong-Beom
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.2
    • /
    • pp.247-253
    • /
    • 2015
  • Dielectric breakdown accidents have been mainly occurred in the vicinity of service entrance section in underground power transmission systems. One cause among them is due to the excessive component value of sheath located around service entrance of cable. In this paper, as one of the alternative to prevent these accidents, the change of cross bond grounding system and the location change of IJ(Insulation Joint) are suggested. Also, to evaluate effectiveness of this changing system, circulating current and induced voltage of sheath were analyzed in steady and transient state. By comparison of the analytical results for the several possible changing systems, a grounding system and location of IJ which has the smallest sheath component values is proposed. In this paper, analysis to evaluate the proposed system is carried out by EMTP/ATPDraw. It can be used as a valuable operational material to prevent accident of the service entrance section in underground power transmission system.