• 제목/요약/키워드: Critical Facility

검색결과 315건 처리시간 0.025초

BIM을 유지관리로 활용하는 IFC 확장 및 GIS 연계 연구 - 기반시설 BIM의 교량, 터널 중심으로 - (A Study on IFC extended and GIS linkage using BIM as Facility Management - Case Study on Bridge and Tunnel of Infra BIM -)

  • 채재현;최현상;이지영
    • 한국BIM학회 논문집
    • /
    • 제12권3호
    • /
    • pp.1-17
    • /
    • 2022
  • As the technology of Smart City and Digital Twin is developing, techniques to integrate BIM data of infrastructure facilities into GIS are becoming more critical. Hence, this study aims to manage BIM data representing bridge and tunnel structures through the Industry Foundation Classes (IFC) standard and to develop a method to link these IFC-compliant files to the GIS standard CityGML without loss of information. We analyze the criteria for creating BIM data for bridges and tunnels by reviewing the BIM guidelines set by each client. We use these criteria to suggest methods for data management based on InfraBIM as a specific IFC class standard. Furthermore, we perform model analysis to determine the necessary design and construction field-appropriate model process and Level of Detail (LOD). From the model analysis, we conclude that the classified BIM models can be used as base data to generate BIM models of bridges and tunnels for facility management.

양식장 이용에 대한 수학적 모형 (Mathematical Model of Aquaculture Facility Utilization)

  • 어윤양
    • 수산해양교육연구
    • /
    • 제26권2호
    • /
    • pp.444-454
    • /
    • 2014
  • The range of optimization problem in aquaculture is very wide, resulting from the range of species, mode of operation. Quite a few studies focus marine net-cages, but studies on land based culture farm are few or no. This paper considers a allocation problem to meet production planning in land based aquaculture system. A water pool allocation model in land based aquaculture system was developed. The solution finds the value of decision variable to minimize yearly production costs that sums up the water pool usage cost and sorting cost. The model inputs were (1) the fish growth rate (2) critical standing corp (3) number of water pool (4) number of fish. The model outputs were (5) number of water pool in growing phase (6) cost of cultivation (6) optimal facility allocation(number of water pool for each growing phase). To solve the problem, an efficient heuristic algorithm based on a greedy manner is developed. Branch and bound and heuristic is evaluated through numerical examples.

Geological Safety Evaluation and Monitoring of Nuclear Facility Sites in South Korea

  • Lee, Hyunwoo;Woo, Hyeon Dong;Chun, Hyun Ju;Im, Chang-Bock
    • 지질공학
    • /
    • 제24권4호
    • /
    • pp.609-613
    • /
    • 2014
  • The Korean Peninsula, located at the southeastern tip of the Eurasian Plate, is known to be tectonically stable, and no critical evidence has yet been found that would override the safety design of nuclear facilities in South Korea. Because a nuclear power plant, like other major social overhead capital facilities, could cause great damage to both the environment and society through an unexpected tectonic event, even one of extremely low probability, like the Fukushima accident, a defense-in-depth safety approach is required in geological and geotechnical site safety evaluation for nuclear projects. This paper introduces the regulatory procedures that are in place to confirm nuclear site safety and site monitoring (e.g., earthquakes and groundwater) systems applied to nuclear facilities in order to reduce inherent uncertainties within the site safety review of geological and seismological issues related with a NPP project.

선호하는 유료 노인시설주거 디자인을 위한 중산층의 집에 대한 개념 내 집과 같은 노인시설주거 디자인 특성에 관한 연구 (II) (A Study of Home Concept of Homelike Elderly Housing Facility Design)

  • 신영숙
    • 대한가정학회지
    • /
    • 제39권12호
    • /
    • pp.141-158
    • /
    • 2001
  • The purpose of this study was identifying the essential concept of home of middle class and aged housewives by using a critical incident methodology. All 30 subjects participated in structured interviews designed to elicit statements describing the attributes of home and non-home environment. The qualities of comfort, place-attachment, self-expression, fundamental values and personal identity, social relationships, economic value, and a suitable physical structure were associated with home environments, and were absent in residences which were not regarded as homes.

  • PDF

전류영점 영역에서 파퍼식 SF6 가스차단기의 아크 컨덕턴스에 관한 연구 (A Study on Arc Conductance of Puffer Type SF6 GCB at Current Zero Period)

  • 정진교;송기동;이우영;김규탁
    • 전기학회논문지
    • /
    • 제59권2호
    • /
    • pp.328-332
    • /
    • 2010
  • The SLF(Short Line Fault) breaking capability test for high voltage class $SF_6$ GCB(Gas Circuit Breaker) was conducted. Simplified LC resonant circuit test facility was used for SLF breaking test. During test, Test current was measured by Rogwski coil and arc voltage was measured by voltage divider. Arc conductance was calculated by using these test results before 200ns at current zero. Critical arc conductance value at rated voltage 145kV class is about 2.3mS regardless of breaking current magnitude and arc conductance value at rated voltage 170kV class is about 2.6mS.

Application of Logistic Simulation for Transport of SFs From Kori Site to an Assumed Interim Storage Facility

  • Kim, Young-Min;Kim, Chang-Lak
    • 방사성폐기물학회지
    • /
    • 제19권1호
    • /
    • pp.61-74
    • /
    • 2021
  • A paradigm shift in the government's energy policy was reflected in its declaration of early closure of old nuclear plants as well as cancellation of plans for the construction of new plants. To this end, unit 1 of Kori Nuclear Power Plant was permanently shut down and is set for decommission. Based on these changes, the off-site transport of spent fuels from nuclear power plants has become a critical issue. The purpose of this study is to develop an optimized method for transportation of spent fuels from Kori Nuclear Power Plant's units 1, 2, 3, and 4 to an assumed interim storage facility by simulating the scenarios using the Flexsim software, which is widely used in logistics and manufacturing applications. The results of the simulation suggest that the optimized transport methods may contribute to the development of delivery schedule of spent fuels in the near future. Furthermore, these methods can be applied to decommissioning plan of nuclear power plants.

Critical Criteria Based on Facility Condition Index for Supporting Priority Decision-making in Educational Facilities

  • Shin, Seung Woo;Yi, June Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.687-688
    • /
    • 2015
  • The objective of identifying the cause of inconsistency in determining priority of educational facility maintenance, any related factors were thoroughly identified and tested, to see if it has any effect on decision-making process in resource allocation for educational facilities. On the assumption that 'the more there are to be repaired/maintained and deferred, the higher the relevant cost will be, this will lead to a significant social loss. Accordingly, this study established a framework of determining resource allocation priority based on deferred maintenance and its related expenses. For doing so, it was required to determine relative ranking in terms of resource allocation within a pre-assigned school district, in consideration of the criticality of each deferred maintenance attribute/variable.

  • PDF

Effect of critical flow model in MARS-KS code on uncertainty quantification of large break Loss of coolant accident (LBLOCA)

  • Lee, Ilsuk;Oh, Deogyeon;Bang, Youngseog;Kim, Yongchan
    • Nuclear Engineering and Technology
    • /
    • 제52권4호
    • /
    • pp.755-763
    • /
    • 2020
  • The critical flow phenomenon has been studied because of its significant effect for design basis accidents in nuclear power plants. Transition points from thermal non-equilibrium to equilibrium are different according to the geometric effect on the critical flow. This study evaluates the uncertainty parameters of the critical flow model for analysis of DBA (Design Basis Accident) with the MARS-KS (Multi-dimensional Analysis for Reactor Safety-KINS Standard) code used as an independent regulatory assessment. The uncertainty of the critical flow model is represented by three parameters including the thermal non-equilibrium factor, discharge coefficient, and length to diameter (L/D) ratio, and their ranges are determined using large-scale Marviken test data. The uncertainty range of the thermal non-equilibrium factor is updated by the MCDA (Model Calibration through Data Assimilation) method. The updated uncertainty range is confirmed using an LBLOCA (Large Break Loss of Coolant Accident) experiment in the LOFT (Loss of Fluid Test) facility. The uncertainty ranges are also used to calculate an LBLOCA of the APR (Advanced Power Reactor) 1400 NPP (Nuclear Power Plants), focusing on the effect of the PCT (Peak Cladding Temperature). The results reveal that break flow is strongly dependent on the degree of the thermal non-equilibrium state in a ruptured pipe with a small L/D ratio. Moreover, this study provides the method to handle the thermal non-equilibrium factor, discharge coefficient, and length to diameter (L/D) ratio in the system code.

다발성 외상으로 인한 심한 폐 좌상과 스트레스성 심근병 환자에서 체외막형 산화기의 치료 경험 (Successful Use of Extracorporeal Membrane Oxygenation for Severe Lung Contusion and Stress-induced Cardiomyopathy Caused by Multiple Trauma)

  • 이대상;길은미;이아란;하태순;정치량;박치민;조양현
    • Journal of Trauma and Injury
    • /
    • 제27권4호
    • /
    • pp.229-232
    • /
    • 2014
  • A 55 year-old man hit a vehicle while riding a bicycle. He was diagnosed as left hemopneumothorax, multiple rib fracture, cerebral hemorrhage, and skull fracture. Initially he suffered from hypoxia requiring 100% oxygen with a mechanical ventilator. Finally he became hypotensive. Venovenous extracorporeal membrane oxygenation (ECMO) was initiated to support patient's gas exchange. Because hypotension and left ventricular dysfuction persisted, we converted the mode of support to veno-arterio-venous ECMO. Over four days of intensive care, we could wean off ECMO. The patient went to rehabilitation facility after 45 days of hospitalization. Although trauma and bleeding are considered as relative contraindication of ECMO, careful decision making and management may enable us to use ECMO for trauma-related refractory heart and/or lung failure.

Safety-critical 소프트웨어의 검증시험 (Validation Testing of Safety-critical Software)

  • Kim, Hang-Bae;Han, Jai-Bok
    • Nuclear Engineering and Technology
    • /
    • 제27권3호
    • /
    • pp.385-392
    • /
    • 1995
  • 월성원자력 2, 3, 4호기 safety-critical 소프트웨어에 대한 규제 기관의 요구사항을 만족시키기 위하여 소프트웨어 엔지니어링 절차가 개발되었다. 본 논문에서는 그 중에서 검증시험절차에 대하여 기술하였는데, 검증시험이란 설계그룹에서 개발된 소프트웨어가 독립된 기능그룹에서 부여한 요구사항을 모두 만족하는지를 확인하는 것이다. 이 검증시험을 수행하기 위하여 시험설비와 시험용 소프트웨어가 개발되었으며, 검증시험은 기능시험, 성능시험 및 자기점검시험 등으로 구성되었다. 시험결과를 분석하여, 불만족한 경우는 설계그룹에 통보되어 소프트웨어가 수정되었고, 최종결과는 보고서로 작성되어 규제기관에 제출될 것이다. 개발된 검증시험 방법과 절차는 효율적이고 성공적이었으며, 시험결과는 소프트웨어가 기능사양서를 충분히 만족시킨다는 것을 성공적으로 검증함을 보여주었다. 본 시험방법은 다른 safety-critical 소프트웨어 검증에도 적용될 수 있을 것이다.

  • PDF