Delay Factor Analysis of Public Project Based on System Dynamics (SD를 이용한 공공 프로젝트의 지체요인 분석)

  • 이만형;이정민
    • Korean System Dynamics Review
    • /
    • v.4 no.2
    • /
    • pp.95-130
    • /
    • 2003
  • The purpose of this study is to find what causes make public projects hold off, going beyond the planned deadline and budget. Using System Dynamics(SD) and their derivative Urban Dynamics(UD) models, it intends to analyze major feedback loops based on VENSIM and to simulate them with STELLA software, all of which are interrelated with various causes of project delay. To prevent or ameliorate project delay, first of all it advises to focus on endogenous delaying factors not exogenous ones. These factors either reinforce or balance certain loops in complex causal structure, In the case example on the Cremation Building Project in Cheongju, Residents’ participation demand make negotiation put off and delayed negotiation reinforces administrative-expediency planning in order to observe a time limit, on the other hand, once building consensus, it increase both the level of planning performance and public trust. In the meantime, the real planning process used to neglect residents opinions and manage public grievance only through compensation, he a result of simulation, visible fruit of negotiation in the initial phase seems to be not satisfactory owing to funds and time consumed, but after reaching an mutual agreement among stakeholders, planning performance is effective and strategic than administrative-expediency planning viewed in both financial and time angle. It proposes to devise specific tools schematizing project implementation. In order to upgrade the quality of project management, it recommends for planners to adopt key concepts based on SD/UD diagrams and causal loops, which would contribute to enriching Planning abbots.

  • PDF

Causal Loops and Stock-Flow Models of Project Delay Confronted with Location of Locally Unwanted Facilities (비선호시설 입지에 관한 프로젝트 지체의 인과구조와 유량-저량 묘형)

  • Lee, Man-Hyung;Choi, Nam-Hee
    • Korean System Dynamics Review
    • /
    • v.7 no.1
    • /
    • pp.91-118
    • /
    • 2006
  • The purpose of this study is to find what factors are directly related to the delay of public projects, usually going beyond the planned deadline and budget. From a series of System Dynamics simulation works applied to the Cheongju Cremation Project, the research finds that the negative externalities originated from the adjacent location of the LULU(locally unwanted land use) facilities have exerted significant influence on dynamic perceptions of key stakeholders, typically resulting in project delay. As shown repeated experiments, the proposed negotiation-based models would produce relatively higher planning performance level than the typical approaches hinged on the administrative-expediency tactics. Even though the former may require more human and material resources in the very beginning stage, as they have to deal with diverse grievances raised by major stake-holders, most of them would bound for strengthening reinforcing loops within the complex structure. These results also imply that negotiation or consensus-building approaches would enhance mutual agreement among stake-holders, upgrading the overall quality of project management.

  • PDF