The purpose of this study is to analyze logistics cost of transportation systems on EC(electronic commerce) between company and consumer. Transportation system in logistics is classified by three types on EC. The first type is the direct delivery from supply factory to consumers(type I). The second type is the delivery through distribution center in each area by owner logistics company (type II). The third type is the commission of delivery to the third party logistics company(type III). The logistics of EC has various service characteristics such as dealing with small quantity, various goods, and high frequency. This study assumes that all day's order is delivered on a next day. The logistics cost function is calculated according to the number of orders, delivery distance, transport quantify. and allocated freight trucks for daily order of the subject zone. The logistics cost changes according to the daily order characteristics. Therefore it is simulated to analyze the logistics cost change that considers the type of transportation's order characteristics. As a result of analysis, if the number of order is less than 10 and the quantify of each order is less than 10kg, type III has an advantage over the others And if the number of order is more than 10 and the quantity of each order is more than 10kg, type I has an advantage in the same zone and type II has an advantage in the other zones. This study is limited on the actual application because this study doesn't consider logistics infra of supply company and transport service time. If further study that considers these factors is implemented, it can estimate more accurate logistics cost on EC and propose an efficient freight transport alternatives to the company. This study attributes to estimate the logistics cost change over the frequency of daily order, the quantify of supply goods, and the transport distance on EC.
Kim, Seung-Ki;Lee, Byung-Suk;Yang, Jae-Hyouk;Lee, Jong-Cheon;Kim, Chan-kee
Journal of the Korean Geosynthetics Society
/
v.15
no.1
/
pp.59-70
/
2016
The purpose of this study is to review that the VE techniques can be used as a selection tool of borrow pit locations. The analysis of the soil investigation report is performed for the selection of proposed borrow pit site on a large-scale residential development area. Possible earthwork volume of mining is estimated and the weighting matrix evaluation is applied to the VE techniques. After determining the evaluation items for VE assessment, important degree was calculated. The Rating and evaluation of performance is carried out on a proposed borrow pit site. And, development priority has to be decided for a proposed borrow pit sites. As a result, the relative construction cost is closely related to the haulage distance. As the haulage distance increases, the relative construction cost will be increased. Therefore, it was confirmed quantitatively that haulage distance has a significant impact on the select of borrow pits. Also, it was found that the condition of borrow pits itself is important, but it cannot be ignored the impact of the life cycle cost for the selection of optimal borrow pit sites.
Proceedings of the Korean Society for Technology of Plasticity Conference
/
2003.05a
/
pp.421-426
/
2003
Micro-suing that used on micro mechanism should be equal to distance between pitch and correct of shape. Therefore, micro spring must make by super-precision working. But, current step of super-precision processing depends on special quality of work piece and is ineffective the aspect of cost and productivity yet. Also, to use as demandable length shearing process perform but even if make precision spring, in the aspect of quality of coil spring make difficult that produce product of good quality. Therefore, purpose of this study presented proposed process that extract the point of processing factor after perform finite element analysis applying existing sheet shearing process to suing shearing process consider cost and productivity after evaluate.
Park, Ki-Hyung;Ding, Guo-Dong;Fang, Guang-Ling;Kim, Chan-Beom;Wu, Bin;Bao, Yan-Feng;Gao, Guang-Lei;Jung, Sungcheol;Moon, Kangmin
Journal of the Korean Society of Environmental Restoration Technology
/
v.15
no.6
/
pp.29-41
/
2012
This study was conducted in Ningxia Hui autonomous region, located at southern part of Mu Us sand land in China. To investigate relationships between windbreak effect and installation cost of sand barriers, plastic net is utilized by using four kind of heights (0.2, 0.3, 0.4 and 0.5m) and four kind of porosities (20, 30, 50 and 70%). These heights and porosities are measured for estimating distances for effective windbreak. It is shown that porosity and the distance have a positive relationship at same heights and porosity on ground indicates a constant figure when height reaches a certain level, regardless of the porosity. This implies that there is a difference of level of windbreak with different porosities; however, distance of windbreak effect is same at the same height of sand barrier. As a result of comparison between porosity of sand barrier on the ground and installation cost in each sand barrier with various heights and porosities (16 combinations), 0.4m and 0.5m height sand barriers describe highest economical efficiency. Within two variables, we concluded that height has a higher impact on windbreak effect than porosity.
The purpose of this study was to identify critical parameters of a putting performance using jerk cost function. Jerk is the time rate of change of acceleration and it has been suggested that a skilled performance is characterized by decreased jerk magnitude. Four elite golfers($handicap{\leq}2$) and 4 novice golfers participated in this study for the comparison. The 3D kinematic data were collected for each subject performing 5 trials of putts for each of these distances (random order): 1m, 3m, 5m The putting stroke was divided into 3 phases such as back swing. down swing and follow-through. In this study, it was assumed that there exist smoothness difference between elite and novice golfers during putting. The distance and jerk-cost function of Putting stroke for each phase were analyzed Results showed that there was a significant difference in jerk cost function at putter toe (at media-lateral direction) and at the center of mass between two groups by increasing putting distance. From these it could be concluded that jerk can be used as a kinematic parameter for distinguishing elite and novice golfers.
Journal of the Korea Institute of Building Construction
/
v.2
no.1
/
pp.155-162
/
2002
In this research, I finally came to a conclusion analyzing the connection among managing of each items in management expenses, the size of each complex and stories, and the term of using. (1) In the managing cost regarding to the management manner, although the managing cost of self-governing management is less imposed than the one of commission management, there is slight difference between those Costs. And it is more important to consider the effectiveness of management than to emphasize reduction of management cost. (2) The higher the stories, the higher the managing cost of elevator per the unit area. It Is caused by the fact that the father the distance of the elevator operating, the higher the electric charges. (3) The third of one of total management cost goes to pay the personnel expenses. So I found that the effective management of the expenses is available to reduce management cost. (4) The higher the stones, the lower the cost of personnel expenses including the cleaner cost. (5) The sum of costs assigned in repairment and management increases in proportion to the term of using. The costs assigned in special repairment and management are interacting to each other. (6) To reduce the management cost, we have to cut down the personnel in security guard that occupies one third of total management cost with application to the joint security system and operation of the self-governing guard. Through this process, it will be easy to accomplish the rationalization of contract with an outside order. Because the improvement of management service is not only the responsibility of owner but also the one of dwellers. And it Is imperative to realize the importance of cooperation and trust between the owner and dwellers. And the establishment of effective managing system which has convenience and rationality must be settled without delay.
Journal of the Korean Society of Industry Convergence
/
v.23
no.1
/
pp.65-71
/
2020
Recently, interest in the DC transmission is rapidly increasing worldwide. In many countries and leading companies are prior to the aggressive development of HVDC technology and application. Especially, VSC-HVDC system has been widely applied to transfer power at long distance between power plant and power consumption area. Therefore in this paper, we analyzed the benefit-cost of VSC-HVDC system which has more advantages than existing transmission system. The proposed system is MMC(Modular Multilevel Converter) VSC-HVDC system that have stability of Power Grid, interconnect Large-scale New Power Generation Plants by prevents Blackout. And MMC VSC-HVDC system Reduced the loss importing foreign systems. And the benefits were calculated in four stages, and the costs were applied to the actual project. By evaluating the various avoidance costs compared to the benefit-cost, it was confirmed that MMC VSC-HVDC system was advantageous in system stability and economic and social benefits.
Analyses of export of agricultural products, so far, have not been an easy task because of the lack of direct data from exporting companies. Results obtained from indirect data are subject to criticism and have a restriction on general interpretation. This paper uses and analyzes the direct data from a chrysanthemum-exporting-company, leading to some conclusion that farms receive on average 72.3% of unit price but the share decreases by the distance to the company. Exporting farms have higher income ratio, compared to farms that sell flowers to domestic market. The analysis of unit price and cost shows that the profitability of exporting-company might be worsened if government subsidy is not in place.
Since inaccurate demand estimation for recent urban rail construction may result in financial burden to cities, precise prediction for operating cost as well as construction costs is necessary to avoid or reduce budget loss of the local or central government. The operating cost is directly related to the public fare and affect a policy to determine the rate system. Therefore, there is a pressing need to develop an estimating model for reliable operating cost of urban railway. This study introduces a new model to estimate the operating cost with new variables. It provides a better prediction in accuracy and reliability compared to the existing model, considering the feature of urban railway. For verification of our model, railway operation data from a few cities for the last five years were comprehensively examined to determine variables that affect the operating cost. The operating cost was estimated in a dummy regression model using five independent variables, which were average distance between stations, daily trains distance, total passenger capacity of a train in a train, driving mode(manned/unmanned), and investment type(financial/private).
Journal of the Korea Institute of Information and Communication Engineering
/
v.6
no.1
/
pp.36-40
/
2002
Routing algorithm uses metric to choose the route of Least cost to destination network, the best suited routing investigates all routes to the shortest destination among networks and is decided on the route given the minimum metric. This paper analyzed packet flow for setting up the best fitted path on the same network using RIP and EIGRP as the distance vector algorithm and measured the Link-efficiency.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.