• 제목/요약/키워드: Cost model

검색결과 7,847건 처리시간 0.037초

다수 고객 통합전략을 활용하는 생산 및 물류계획 수립 (A Production-and-Scheduling for One-Vendor Multi-Buyer Model under the Consolidation Policy)

  • 노경완;성창섭;이익선
    • 경영과학
    • /
    • 제31권3호
    • /
    • pp.13-26
    • /
    • 2014
  • This paper considers an integrated one-vendor multi-buyer production-inventory model where the vendor manufactures multiple products in lot at their associated finite production rates. In the model, it is allowed for each product to be shipped in lot to the buyers even before the whole product production is not completed yet. Each product lot is dispatched to the associated buyer in a number of shipments. The buyers consume their products at fixed rates. The objective is to the production and shipment schedules in the integrated system, which minimizes the total cost per unit time. The total cost consists of production setup cost, inventory holding cost and shipment cost. For the model, an iterative optimal solution procedure with shipment consolidation policy incorporated. It is then tested through numerical experiments to show how efficient and effective the shipment consolidation policy is.

Metadata model-centered cost management app for small business owners in the restaurant business in O2O environment

  • Ryu, Gi-Hwan;Moon, Seok-Jae
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제13권2호
    • /
    • pp.52-59
    • /
    • 2021
  • In this paper, we propose a system that allows small business owners focusing on the restaurant business to easily understand the management situation, and to manage the operation and management centering on the cost of food materials and profits and losses. In general, the metadata structure is different depending on the POS system, so it is necessary to first develop a standardized metadata model for a food material cost management system for small business owners in various industries. For that reason, the system proposed in this paper was applied to the cost management app by referring to the development of a data model using the metadata standard. In addition, in order to implement a cost profit/loss management system for small business owners in the restaurant industry, it was designed to support standardized metadata models from various types of POS systems, and is a hybrid app that can support a smart environment. Interface) was configured.

DERIVING ACCURATE COST CONTINGENCY ESTIMATE FOR MULTIPLE PROJECT MANAGEMENT

  • Jin-Lee Kim ;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.935-940
    • /
    • 2005
  • This paper presents the results of a statistical analysis using historical data of cost contingency. As a result, a model that predicts and estimates an accurate cost contingency value using the least squares estimation method was developed. Data such as original contract amounts, estimated contingency amounts set by maximum funding limits, and actual contingency amounts, were collected and used for model development. The more effective prediction model was selected from the two developed models based on its prediction capability. The model would help guide project managers making financial decisions when the determination of the cost contingency amounts for multiple projects is necessary.

  • PDF

주택용 태양광발전시스템의 적정 용량 및 설치각 선정을 위한 최적화 모델 연구 (An Optimal Decision Model for Capacity and Inclining Angle of Residential Photovoltaic Systems)

  • 전정표;김광호
    • 전기학회논문지
    • /
    • 제59권6호
    • /
    • pp.1046-1052
    • /
    • 2010
  • In residential house, photovoltaic (PV) system among various alternatives in renewable energy system is the most efficient and feasible solution for reducing energy consumption and electricity cost. However, relatively high initial cost make people reluctant to install PV system in their houses. Therefore, in the initial state for PV system installation in the house, it is very important to decide proper capacity of the PV system considering the expected energy usage and solar energy supplying condition with the house. This paper proposes a novel optimization model for deciding appropriate capacity of the PV system for residential house. The objective function of the model is to minimize the annual cost including electricity bill, operation and maintenance cost, and annual fixed cost calculated from the initial installation cost based on capital recovery factor (CRF). The model also shows the optimal inclining angle of PV panels of the system. In this paper, we estimate the PV output using PVWATTS (PV simulator of Office of Energy Efficiency and Renewable Energy) and find optimal solutions by Sequential Quadratic Programming (SQP) method using MATLAB software. The proposed approach is finally applied to a residential model house in Gangneung, Gangwon-Do and verified its feasibility for adopting to PV system design for residential houses.

LCA 및 LCC를 고려한 환경친화적 리모델링의 평가방법에 관한 연구 (A Study on the Evaluation Method of Green Remodeling Considering LCA and LCC)

  • 이관호;김남규;이언구
    • 한국태양에너지학회 논문집
    • /
    • 제23권1호
    • /
    • pp.57-67
    • /
    • 2003
  • This study aims to presents Evaluation Method of Green Remodeling that analyze the value of environment through expense, using the method of life cycle cost and life cycle assessment simultaneously. The results of this study are summarized as follows. Evaluation Model developed in this study can convert economical value of environment into cost by integrating. In addition, the model can apply as a useful tool to estimation of economical design alternative as well as quantification of environmental loads and costs. Evaluation Model presented In this study observe energy consumption and the environmental load emission with qualification, it can forecast effect of environmental cost that cost estimation is expected to be added to energy cost rate by being possible. Synthetically, when Estimation Model and computer program that developed in this study is applies to the construction industry; reasonable management of environmental load is convenient at each step of Green Remodeling. In addition, at preliminary design phase, practical use may be possible by reasonable yardstick about various alternatives and improvement of design alternatives likewise by grasping environmental effect.

Case-Based Reasoning Cost Estimation Model Using Two-Step Retrieval Method

  • Lee, Hyun-Soo;Seong, Ki-Hoon;Park, Moon-Seo;Ji, Sae-Hyun;Kim, Soo-Young
    • 토지주택연구
    • /
    • 제1권1호
    • /
    • pp.1-7
    • /
    • 2010
  • Case-based reasoning (CBR) method can make estimators understand the estimation process more clearly. Thus, CBR is widely used as a methodology for cost estimation. In CBR, the quality of case retrieval affects the relevance of retrieved cases and hence the overall quality of the reminding capability of CBR system. Thus, it is essential to retrieve relevant past cases for establishing a robust CBR system. Case retrieval needs the following tasks to obtain appropriate case(s); indexing, search, and matching (Aamodt and Plaza 1994). However, the previous CBR researches mostly deal with matching process that has limits such as accuracy and efficiency of case retrieval. In order to address this issue, this research presents a CBR cost model for building projects that has two-step retrieval process: decision tree and nearest neighbor methods. Specifically, the proposed cost model has indexing, search and matching modules. Features in the model are divided into shape-based and scale-based attributes. Based on these, decision tree is established for facilitating the search task and nearest neighbor method was utilized for matching task. In regard to applying nearest neighbor method, attribute weights are assigned using GA optimization and similarity is calculated using the principle of distance measuring. Thereafter, the proposed CBR cost model is developed using 174 cases and validated using 12 test cases.

회귀 분석 모델을 이용한 고리 1호기 해체 비용 추정 (Decommissioning Cost Estimation of Kori Unit 1 Using a Multi-Regression Analysis Model)

  • 주한영;김재욱;정소윤;문주현
    • 방사성폐기물학회지
    • /
    • 제18권2_spc호
    • /
    • pp.247-260
    • /
    • 2020
  • 본 논문에서는 고리 1호기 해체 비용 추정을 위해 외국 원자력발전소 해체 비용 데이터를 현가화한 후 원자력발전소 해체 비용 추정 회귀 분석모델을 개발하였다. 이 모델 개발에 사용된 데이터는 해체 또는 진행 중인 BWR 13기, PWR 16기의 해체 비용 데이터이다. 회귀 분석모델 도출을 위해, 해체 비용을 종속변수로 정하고, 해체 원전의 운전 특성을 반영할 수 있게 고안된 Contamination factor와 해체 기간을 독립변수로 선정하였다. 빅데이터 분석 도구인 R language의 통계패키지를 이용하여 회귀 분석모델을 도출하였다. 이 회귀 분석 모델을 적용하여 고리 1호기 해체 비용을 예측한 결과, 미화 663.40~928.32백만 달러, 한화 약 7,828.12억~1조 954.18억 원이 소요될 것으로 예측되었다.

목표계획법을 이용한 사단급 ASL선정모형에 관한 연구 (A Study on the Authorized Stockage List Slection Model Using Goal Programing)

  • 길계호;김충영
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1998년도 추계학술대회 논문집
    • /
    • pp.75-78
    • /
    • 1998
  • The selection criteria of the Authorized Stockage List(ASL) in the Army is based on Army Regulation(AR)409, the selection method of ASL is not considered in cost, weight and volume of repair parts. This paper is focused on developing for a new selection model taking account of cost, weight and volume of repair parts. This model is applied to data of a division. The ASL selected in the model is more reduced in cost, weight and volume than that of the previous method.

  • PDF

Development of Time-Cost Models for Building Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh;Chun, Yong Hyun
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권3호
    • /
    • pp.13-20
    • /
    • 2014
  • Estimating time and cost is an important mission in the early phase of a construction project, especially in feasibility study. It provides a foundation for making decision whether or not the project is performed on schedule and within budget. Thus, reliability of this estimate plays a key role in measuring the success of a project. This study was carried out to investigate the time-cost relationship in building construction projects in Bangladesh. The mathematical equation used in this study is based on Bromilow's equation. The research data were collected from sixty-three completed building projects through questionnaire survey. Type of clients, type of projects, and tender methods are the project characteristics considered in this study. The results of analysis indicated that the Bromilow's time-cost (BTC) models developed for each project characteristic are appropriate due to quite high coefficient of determination and relatively small mean percent errors. Among them, the forecasted model for time and cost according to tender methods is the best fit model. It is concluded that the BTC model could be applied in building construction project to predict its time and cost in Bangladesh. Four different regression models were also developed in this study. The results of BTC model between some selected countries were compared to gain the comprehensive view.

정규화를 통한 3차원 데이터 모델 구축 및 활용성 향상 방안 연구 -건축 마감 공사 중심으로 - (A Study on 3D Data Model Development by Normalizing and Method of its Effective Use - Focused on Building Interior Construction -)

  • 이명훈;함남혁;김주형;김재준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권3호
    • /
    • pp.11-18
    • /
    • 2010
  • Cost estimation through fast and correct quantity take offs are crucial in the process of construction project. The existing methods for cost estimation are mainly based on 2D-based drawings and the estimation result tends to be different according to the estimator's experience, the quality and quantity of used information and estimation time. To solve these problems, the domestic construction industry have recently tried to use the data extracted from 3D data modeling based on BIM(Building Information Modeling) in order to achieve more accurate and objective cost estimation. However it tends to increase dramatically the quantity of information that can be used in cost estimation by estimators. Therefore in order to achieve quality information data from 3D data modeling, the characteristics of the project should be reflected on the 3D model and it is most important to extract information only for cost estimation from the whole 3D model fast and accurately. Thus this study aims to propose the 3D modeling method through Data Normalization which maximizes the usability of 3D Data modeling in cost estimation process.