• 제목/요약/키워드: Cost impact

검색결과 1,739건 처리시간 0.026초

품질비용(品質費用)시스템의 구축절차(構築節次)와 한계(限界)에 관한 소고(小考) (A Study on The Implementation Procedures and Limitations of Quality Cost System)

  • 류한주;김달곤
    • 품질경영학회지
    • /
    • 제22권4호
    • /
    • pp.132-151
    • /
    • 1994
  • Quality is a critical competitive factor in today's environment because of the impact of quality on market share, productivity and costs. Especially in Korean companies, the importance of quality is heightened as they are losing price competitiveness compared to the new industrialized countries. The traditional approach to quality improvement has been focused on workers. The primary means to achieving acceptable outgoing quality has been to inspect quality by adding more inspectors and inspection stations. This is an example of quality cost that can be reduced through the preventive actions against bad quality. Quality cost is best viewed as a measure of costs specifically associated with the achievement or nonachievement of product/service quality required by customers. This paper examines the concept of quality cost, provides guidance to implementing a quality cost system, and identifies the limitations of quality cost information. These limitations are the target for future research for an efficient and effective implementation of quality cost system.

  • PDF

금속원자재가격의 변동이 건설공사비에 미치는 영향 분석 (A Causal Relationship between Metal Material Prices and Construction Cost)

  • 상준;변정윤;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.137-138
    • /
    • 2012
  • Domestic construction materials market was about 65 trillion won and it occupied 45% level of total construction cost by 2007. In addition, due to the recent rapid rise of crude oil and iron ore price, fluctuation of raw material cost has a great influence to the cost of construction industry. This means that smooth performance is closely related to construction materials. And among them, because of high putting rate of metal materials, it can be seen that the fluctuation of metal material prices is an important variables. So in this study, for the pre-study to analyze the impact of metallic material prices to construction cost, the researcher analyzed a causal relationship between metal material prices and construction cost.

  • PDF

A Function Point Model for Measuring the Development Cost of Information Services using Wireless Data Broadcast

  • Seokjin Im
    • International journal of advanced smart convergence
    • /
    • 제13권1호
    • /
    • pp.12-22
    • /
    • 2024
  • Software applications have a huge and inseparable impact on our lives. The complexity of the applications increases rapidly to support high performance and multifunction. Accordingly, the cost model for applications is increasingly important. Line of Code (LOC) and Man-Month (M/M) as the cost model measure the quantitative sides of the applications. Unlike them, Function Point (FP) measures the functionalities of the application. FP is efficient for estimating qualitative characteristics, but it is restricted to measuring the cost of an application using the wireless data broadcast which can support any number of clients. In this paper, we propose, a Function Point model for Information services using wireles data Broadcast (FPIB) to measure the development cost of an application that serves using the wireless data broadcast environment. FPIB adopts critical parameters of the wireless broadcast environment and the complexity of them to measure effectively the cost developing the application. Through the evaluation comparing the proposed FPIB with FP, we reveal the effectiveness of the proposed FPIB.

해외시장 진출전략에 관한 연구 -정보통신분야의 벤처기업을 중심으로- (A Study on the Foreign Market Entry Strategy of Venture Firms)

  • 김진하
    • 경영과정보연구
    • /
    • 제5권
    • /
    • pp.185-209
    • /
    • 2000
  • A review of shows that past research has focused predominately on foreign market entry strategy issues in relatively well-established firms. These studies have either ignored venture firms or have failed to treat these firms separately. Only recently, researchers have broadened their search to include aspects of the foreign market investment of the venture. The purposes of this study are to identify and explain the impact factors such as ownership specific advantage, transaction cost, and location specific advantage on the choice of foreign market entry strategy for venture firms. To find the perceived the foreign market entry strategy and determinant factors, 130 venture CEOs from the computer and communications equipment industries were asked to describe their venture's foreign market entry strategy through 17 questionnaire items on competitive method. Using factor analysis, the six determinant factors were categorized. To test the relationships between the foreign market entry strategy and factors such as ownership specific advantage, transaction cost, and location specific advantage, the data collected by questionnaire from 92 ventures. The main results of this research are as follows. First, the factors of ownership specific advantage have partially significant impact on the foreign market entry strategy of venture firms, Second, the factors of transaction cost have significant impact on their foreign market entry strategy. Third, the factors of location specific advantage have significant impact on their foreign market entry strategy. This study has produced evidence to demonstrate that the foreign market entry strategy profile of venture firms can be distinguished from those of relatively well-established firms. An expanded study would allow for stronger conclusions regarding the relative explanatory power of individual variables in the method. Additional research is also needed to examine other determinant variables connecting foreign market entry strategy.

  • PDF

Analysis of Impact on ERP Customization Module Using CSR Data

  • Yoo, Byung-Keun;Kim, Seung-Hee
    • Journal of Information Processing Systems
    • /
    • 제17권3호
    • /
    • pp.473-488
    • /
    • 2021
  • The enterprise resource planning (ERP) system is a standardized and advanced business process that many companies are implementing now-a-days through customization. However, it affects the efficiency of operations as these customizations are based on uniqueness. In this study, we analyzed the impact of customized modules and processing time on customer service request (CSR), by utilizing the stacked CSR data during the construction and operation of ERP, focusing on small and medium-sized enterprises (SMEs). As a result, a positive correlation was found between unit companies and the length of ERP implementation; ERP modules and the length of ERP implementation; ERP modules and unit companies; and the type of ERP implementation and ERP module. In terms of CSR, a comparison of CSR processing time of CBO (customized business object) module and STD (standard) module revealed that while the five modules did not display statistically significant differences, one module demonstrated a statistically very significant difference. In sum, the analysis indicates that the CBO-type CSR and its processing cost are higher than those of STD-type CSR. These results indicate that companies planning to implement an ERP system should consider the ERP module and their customization ratio and level. It not only gives the theoretical validity that should be considered as an indicator for decision making when ERP is constructed, but also its implications on the impact of processing time suggesting that the maintenance costs and project scheduling of ERP software must also be considered. This study is the first to present the degree of impact on the operation and maintenance of customized modules based on actual data and can provide a theoretical basis for applying SW change ratio in the cost estimation of ERP system maintenance.

자연재해위험지구 정비사업의 투자효과분석 (Economic Impact Analysis of Disaster Mitigation Projects in Hazardous Areas)

  • 허보영;유순영;김성욱
    • 자원환경지질
    • /
    • 제46권3호
    • /
    • pp.247-256
    • /
    • 2013
  • 재해위험지구 정비사업의 질적 수준제고를 위하여 재해위험지구 정비 사업을 대상으로 비용 대비 편익을 분석하였다. 최근의 재해이력을 고려하여 8개의 분석대상 지구를 선정하였고, 비용편익비(B/C)를 사용하여 투자효과를 분석하였다. 편익 산정은 해당지역의 과거재해이력을 활용하였으며, 비용은 총사업비로 평가하였다. 8개의 분석대상 지구에 대한 분석결과는 영향범위, 할인율 등의 인자에 따라 다른 범위에서 1보다 큰 B/C를 보여주고 있다. 분석결과에 따르면, 4% 할인율과 5 km 영향거리 조건에서 8개 대상 지구에 대한 평균 B/C는 4.1로 1이상을 나타내는 것으로 확인되었다. 이러한 결과로 볼 때 재해위험지구 정비 사업은 비용 대비 효율이 높을 것으로 판단된다.

기반시설부담구역제에서의 표준단위설치비용 산정 사례연구 (A Case Study to Estimate the Unit Standard Infrastructure Cost in Levying the Korean Development Impact Fees)

  • 최내영
    • 대한공간정보학회지
    • /
    • 제19권3호
    • /
    • pp.127-136
    • /
    • 2011
  • 지금까지의 기반시설부담금 관련 기반시설설치비용 산정방식은 표준비용모델을 응용한 획일적 단위설치비용을 적용한 것으로서 이러한 획일적 원단위 적용은 비용산정에 있어 지역적 차별화와 개별사업단위 특수성 반영 등이 어렵다는 문제점이 있었다. 최근 국토연구원 연구를 통해 국토해양부는 새로운 표준단위설치비용 산정방식을 제안한 바, 본 연구는 이러한 개선안에 대해 국가지리정보체계 공간정보를 활용해 사례분석 최적지를 선별하고 GIS 기능을 통해 사례 토지이용계획안을 정밀 구축하여 표준단위설치비용 산정 전 과정을 계량적으로 분석해 보았으며, 특히 안성시를 사례대상지로 하여 시가화지역 외곽에 산업시설이 산재한 지자체 특성을 감안해 주거지역과 공업지역이 혼재한 복합형 단지개발방식을 설정해 사례를 분석해 보고 이를 통해 제도 개선사항의 특장점과 시의성을 확인해 보았다는 데 실증적 의미가 있다.

저영향개발(LID)적용을 위한 구조적 BMPs의 유출량 및 비점오염저감 효과모의: LIDMOD2 적용 (Design of Structural BMPs for Low Impact Development (LID) Application and Modelling Its Effect on Reduction of Runoff and Nonpoint Source Pollution: Application of LIDMOD2)

  • 김정진;김태동;최동혁;전지홍
    • 한국물환경학회지
    • /
    • 제27권5호
    • /
    • pp.580-586
    • /
    • 2011
  • Low impact development (LID) technique is recently proposed as new concept to reduce surface runoff and pollutant loading with various best management practices (BMPs). In this study, LIDMOD2, which is one of the model to evaluate LID, was applied at Mohyeon developing area to evaluate the redcution of annual runoff and pollution loading, cost-reduction efficient by LID with design of structural BMPs including bioretention, wet pond, and wetland. As a simulation results, the bioretention had the highest reduction efficiency for runoff (41.43%), and 22% for T-N and 22% for BOD. Wet pont had the highest reduction efficiency for T-P as showing 25% of reduction rate. As a results of cost-reduction efficient, wet pont represented the highest cost-effective for T-N and BOD with showing 0.43 T-P kg/million won and 17.37 BOD kg/million won, respectively, and bioretention represented the highest cost-effective for T-P with showing 2.52 T-P kg/million won. LID technology could reduce effectively surface runoff and nonpoint source pollution and construct sustainable development. LIDMOD2 could be suggested as useful tool to evaluate and design LID.

비보험비용의 발생 단계 분류에 관한 연구 (A Study on the Classification of Uninsured Cost Occurrence)

  • 이태영;이종번;장성록
    • 한국안전학회지
    • /
    • 제23권6호
    • /
    • pp.158-163
    • /
    • 2008
  • Although prior researches have been investigated the impact of insured cost(direct cost) on employers and employees, little work has attempted to categorize the items of unsecured cost(indirect cost) by accidents. On this basis, the goal of this study was to achieve a better understanding of the nature of accident cost of unsecured cost. Specifically, this study aimed to categorize the unsecured cost items according to the domestic industry circumstances and use these results for a basis of other accident cost related studies. The results of this study are as follows: (1) accident development steps were categorized as twelve items for improved management according to each step of accident development (2) the points of occurrence and termination of the unsecured cost were identified for the improved management according to each step of accident development and (3) characteristics of each item in unsecured cost were studied and identified for a better control of accident costs. These results provide a basis for further researches on the unsecured cost.

설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석 (A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process)

  • 서재필;이상현;송영웅;최윤기
    • 한국건설관리학회논문집
    • /
    • 제13권3호
    • /
    • pp.14-24
    • /
    • 2012
  • 최근 세계 건설시장에서의 발주방식은 빠른 속도로 변화하고 있으며, 이에 대한 건설 사업도 대형화 및 고난이도 공사가 증가하고 있다. 이러한 사업의 많은 부분이 설계시공일괄방식 사업으로 발주 되고 있으며, 공사금액기준으로 2009년 국내 조달청 발주공사의 약 40%를 일괄입찰방식(Design-Build)으로 발주를 하고 있다. 반면 설계시공일괄방식 사업의 증가로 그 중요성은 강조되지만, 사업수행자의 사업비용 관리차원에서 기대이상의 성과를 얻지 못하고 있는 실정이다. 그 이유는 사업방식의 특성상, 기본설계 이후 사업 수행계약이 체결되며, 관련 신기술 및 공법 적용에 대한 발주 검토 미흡과 설계과정에서의 불충분한 협의 등으로 사업비용(Cost) 증가에 대한 리스크가 상존하기 때문이다. 이를 해결하기 위해 사업수행 과정에서 사업비용의 증가 원인에 대한 요인을 찾고, 전체 사업 업무단계(Business Process)에서 리스크요인(Risk Factor)에 대한 우선순위 선정과 긴밀한 관리가 필요하다. 따라서 본 연구는 설계시공일괄방식 사업의 특성과 관련한 문제점을 근거로 사업비용에 대한 업무단계별 중요도를 분석하고, 사업수행자 측면의 업무단계별 사업비용 증가에 대한 리스크요인을 도출하여, 그에 대한 영향도(Impact assessment)를 FMEA(Failure Mode and Effect Analysis)기법을 통해 평가하였다.