건축 프로젝트 개산견적 신뢰도에 영향을 미치는 주요 인자에 관한 연구 (A Study on the Key Factors Influencing the Reliability of Conceptual cost estimates in Building Construction Projects)

  • 안성훈;박우열
    • 한국건축시공학회지
    • /
    • 제8권4호
    • /
    • pp.53-59
    • /
    • 2008
  • Cost estimates are very important to their decision-making in the early stages of a construction project. So Clients have wanted not only to know the results of conceptual cost estimates but also to assess their quality Conceptual cost estimates process is very complex process, so the results of cost estimates are influenced by various factors. So the purpose of this study is to reveal the key factors which influence the reliability of conceptual cost estimates in building construction projects. The analytic hierarchy process is used to determine the relative important weights of elements influencing the conceptual cost estimates. And factor analysis is used to reveal the key factors from the elements that influence the conceptual cost estimates. The results showed that the key factors is an experience level, available data level, level of will for winning the bid, difficulty level of conceptual cost estimate, uncertainty level.

Stability of Construction Cost-variability Factor Rankings from Professionals' Perspective: Evidence from Dar es Salaam -Tanzania

  • Shabani, Neema;Mselle, Justine;Sanga, Samwel Alananga;Kanuti, Arbogasti Isidori
    • Journal of Construction Engineering and Project Management
    • /
    • 제8권2호
    • /
    • pp.17-33
    • /
    • 2018
  • This study investigates the stability of professionals' cost variability factor-rankings across different levels of cost-variability and response scenarios. Descriptive statistics are used to examine the stability of factor-ranking for 20 cost variability factors and a Multinomial Logistic (MNL) regression model was implemented to examine the stability of cost variability factors across three cost variability levels. The finding on the descriptive statistics indicated that professionals' factors-rankings are stable only for external factors. The MNL regression results on factor-stability suggested that 8 out of the 20 evaluated factors were unstable determinant of lower cost variability levels. These factors are "risk associated with the project", "personal bias and poor professionalism of the estimators", "limited time available to complete the project", "lack of skills and experience by estimator" "geographical location of projects", "incomplete & rush designs for estimate", "unforeseen or unexpected site constraints", "high class bidders for the contractors". Similarly lack of experience and large size projects were observed to be unstable as well. These observations suggest that professionals' view on pre-tender cost variability factor-ranking yields unstable factor rankings hence should not be relied upon as the only mechanisms to mitigate cost related risks in construction projects.

Safer Zone Analysis for Multiple Investment Alternatives on the Total-Cost Unit-Cost Domain

  • Kono, Hirokazu
    • Industrial Engineering and Management Systems
    • /
    • 제11권1호
    • /
    • pp.11-17
    • /
    • 2012
  • Along with the recent trend toward increasing variety and shorter life of products in the market, evaluation of risk for economic investment alternatives is of practical importance in manufacturing companies. This paper assumes that each alternative is composed of demand volume and unit sales price as income factors, and unit variable cost and fixed cost as expense factors. The paper assumes that these four factors move worse from the originally expected values, toward the direction of decreasing profit. Values of these four factors are also assumed to fluctuate from year to year over the entire multi-period. By applying the analysis of the breakeven points to each of the four factors, safer area against these changes is represented on the two dimensional domain called normalized total-cost unit-cost domain. A practical numerical example is analyzed to verify the validity of the proposed method.

분쟁청구비용을 고려한 건설 분쟁의 위험요인 (Construction Conflict Risk Factors based on the Conflict Cost)

  • 신한우;서장우;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.125-128
    • /
    • 2006
  • Since the diversification, complication of the construction industry, construction conflicts have been increased these days. Expansion of scale of construction has brought conflict treatment cost increase. Thus, needs of the study on construction conflict risk factors and its management is getting important. But the existing studies about construction conflicts and risk factors that need to be cared to decrease construction cost are almost focused on analysis of number of conflict proposed. It means those studies can be helpful when want to know how many conflict have been instituted, however, they do not contain a close examination between types of conflict and cost of conflict treatment. The purpose of this study, therefore, is an extraction of conflict causes based on the conflict treatment cost and the choice of significant risk factors to be managed to prevent conflict and its treatment cost, which enables reducing the conflict treatment colt on control the risk factors.

  • PDF

건설프로젝트 하도급 입찰금액 상승요인을 고려한 리스크인자의 중요도에 관한 분석 (An Analysis on the Importance of the Risk Factors Considering the Reasons for the Increase of the Subcontract Construction Project Bid Cost)

  • 이성구;신현인
    • 한국건축시공학회지
    • /
    • 제7권1호
    • /
    • pp.63-70
    • /
    • 2007
  • The aims of this study are to draw the project risk factors by grasping the relation especially between the construction preparation cost calculation and the project risk factors in the project's bidding stage, and to draw the cost estimate based on the risk when the orderer or the constructer performs the project and the main factors in calculating the most suitable construction cost by clarifying the understanding degree of the influence between the risk factors and the construction cost. In addition, this study can give a help to the proper decision -making through the prediction of the construction preparation cost, and this study is expected to give the basic data in developing the assessment tool for the most suitable construction cost of the project.

연구용원자로 해체비용 산정을 위한 단위비용인자 산출 (Calculating the Unit Cost Factors for Decommissioning Cost Estimation of the Nuclear Research Reactor)

  • 정관성;이동규;정종헌;이근우
    • 방사성폐기물학회지
    • /
    • 제4권4호
    • /
    • pp.385-391
    • /
    • 2006
  • 연구용원자로 해체비용은 해체대상물에 대한 특성 및 제원에 맞게 해체작업을 분류하고 구성요소를 설정하여 단위비용인자를 바탕으로 한 공학적 비용 산정 방법으로 해체비용을 산정한다. 연구용원자로에 대한 해체비용은 크게 인건비, 장비 및 재료비로 구성이 되는데 해체작업에 소요되는 인건비는 해체대상물에 소요되는 작업시간을 바탕으로 계산을 한다. 본 논문에서는 연구용원자로 해체비용 산정 시 인건비 계산에 필요한 단위비용인자 및 작업 난이도 인자를 산출하였다.

  • PDF

표준원가 분석을 통한 재활용 기준비용 재산정에 관한 연구 (A Study on Re-calculation of Recycling Standard Cost through the Analysis on Standard Cost)

  • 이희남;최윤정
    • 대한안전경영과학회지
    • /
    • 제13권1호
    • /
    • pp.189-193
    • /
    • 2011
  • The current standard cost for recycling applied under the Extended Producer Responsibility(EPR) institution, is not coping with continuously increased number of obligatory subject items as well as a variety of variable cost changing factors regarding the recycling treatment cost caused by price fluctuation such as increased material and labor cost entirely across the society; changes in recycling treatment process following the developing technologies; and changes in the required work forces and equipments followed by the trends of automated facilities. Despite such various cost fluctuation factors, the current EPR is not coping with the trends, making the re-calculation process difficult, which causes differences between the real treatment cost for recycling. In this study, the analysis was made on main factors affecting on the related cost and the related price changing index was calculated, by conducting the influence evaluation on the standard cost factors of the current standard cost for recycling. Through theses results, more objective standard will be set for the re-calculation of standard cost for recycling to greatly contribute to setting up the midterm and long-term strategies in the future towards efficient institution.

Finding Significant Factors to Affect Cost Contingency on Construction Projects Using ANOVA Statistical Method -Focused on Transportation Construction Projects in the US-

  • Lhee, Sang Choon
    • Architectural research
    • /
    • 제16권2호
    • /
    • pp.75-80
    • /
    • 2014
  • Risks, uncertainties, and associated cost overruns are critical problems for construction projects. Cost contingency is an important funding source for these unforeseen events and is included in the base estimate to help perform financially successful projects. In order to predict more accurate contingency, many empirical models using regression analysis and artificial neural network method have been proposed and showed its viability to minimize prediction errors. However, categorical factors on contingency cannot have been treated and thus considered in these empirical models since those models are able to treat only numerical factors. This paper identified potential factors on contingency in transportation construction projects and evaluated categorical factors using the one-way ANOVA statistical method. Among factors including project work type, delivery method type, contract agreement type, bid award type, letting type, and geographical location, two factors of project work type and contract agreement type were found to be statistically important on allocating cost contingency.

SCHEMATIC ESTIMATING MODEL FOR CONSTRUCTION PROJECTS -USING PRICIPLE COMPONENT ANALYSIS AND STRUCTURAL EQUATION METHOD

  • Young-Sil Jo;Hyun-Soo Lee;Moon-Seo Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1223-1230
    • /
    • 2009
  • In the construction industry, Case-Based Reasoning (CBR) is considered to be the most suitable approach and determining the attribute weights is an important CBR problem. In this paper, a method is proposed for determining attribute weights that are calculated with attribute relation. The basic items of consideration were qualitative and quantitative influence factors. These quantitative factors were related to the qualitative factors to develop a Cost Drivers-structural equation model which can be used to estimate construction cost by considering attribute weight. The process of determining the attribute weight-structural equation model consists o 4 phases: selecting the predominant Cost Drivers for the SEM, applying the Cost Driers in the SEM, determining and verifying the attribute weights and deriving the Cost Estimation Equation. This study develops a cost estimating technique that complements the CBR method with a Cost Drivers-structural equation model which can be actively used during the schematic estimating phases of construction.

  • PDF

원자력 시설 해체비용 산정에 관한 고찰 (A Study of the Decommissioning Cost Estimation for Nuclear Facilities)

  • 이동규;정관성;이근우;오원진
    • 한국방사성폐기물학회:학술대회논문집
    • /
    • 한국방사성폐기물학회 2004년도 학술논문집
    • /
    • pp.85-96
    • /
    • 2004
  • 연구로 및 원자력 시설 해체작업 수행 시 고려해야 할 여러 가지 비용인자를 고찰하기 위하여 OECD 국가 및 원자력 선진국의 연구용 원자로 및 원자력 시설 해체비용에 대한 추정 결과의 영향 인자를 중심으로 분석하였다. 여러 가지 해체 비용을 유발하는 범주에서 원자력 시설 철거활동과 폐기물 처리 활동이 가장 많은 비용이 발생하는 것으로 예상되고 있고, 노동인력비용, 재료비 기타 비용 중에서 노동 인력 투입에 대한 비용이 가장 많이 차지한 것으로 나타났다. 해체비용에 영향을 미치는 주요 변수로는 Work difficulty, Regional labor cost 차이, Peripheral cost, Disposal/final burial costs으로 조사되었다.

  • PDF